# Section 20 major works consultancy in Battersea

A mansion block can have several distinct roof bays behind one principal elevation. Show the relevant bay, stair access and any lower projections on the information issued for comparison.

Initial technical assessment from £1,800 including VAT (£1,500 professional fee plus £300 VAT at 20%). Later stages are quoted individually.

#### Residential conversion around Battersea Square

Wandsworth’s Battersea Square appraisal records former granaries converted to residential use and nineteenth-century terrace accommodation with later changes to ground floors. These provide specific conversion examples. A separate warehouse proposal mentioned in the appraisal should not be read as proof of completed housing, and no HCS role at the examples is claimed.

For the client’s property, obtain available conversion drawings and compare them with the occupied arrangement. Identify common circulation, rear structures and service routes. Historic use can suggest questions to investigate, but it does not establish the materials or condition now concealed behind later finishes.

#### Trace the junctions created by conversion

An inspection brief should identify where newer roofs, windows or internal layouts meet older fabric. Record the evidence for any proposed intervention at those junctions. If a leak or movement concern is reported, relate it to a location and history rather than treating conversion alone as the cause.

Where information is incomplete, specify the purpose of further opening-up or specialist assessment. A tender allowance should explain the decision it supports. This is more useful than asking bidders to price an undefined contingency for every possible consequence of an old industrial or commercial use.

#### Test rear-yard access against the current occupation

A former servicing route may now be part of a resident’s ordinary access or private space. Confirm the available width, level changes and authority for construction use. Show proposed unloading, storage and protection before the method is assumed in the budget.

Ask how the contractor would maintain the occupied entrance while materials move through the site. If an alternative route depends on a neighbour, identify that dependency explicitly. The tender comparison should reveal what happens if the preferred arrangement cannot be secured.

#### Keep conservation context separate from the repair decision

A character appraisal can help describe the retained building form, while an actual repair recommendation needs condition evidence. Explain the reason for retaining, repairing or replacing each significant component. Obtain the relevant advice where a proposed detail raises consent or specialist design questions.

Responses to observations should identify whether the issue concerns the physical scope, the chosen treatment or the legal responsibility for expenditure. Keep the answer with the appropriate evidence and adviser. Technical consultation support should not imply that HCS issues statutory notices or determines lease liability.

#### Scope the professional work and preserve conversion knowledge

A fee proposal needs the building extent, known alterations, available reports and the stages the client wants. State whether the appointment includes tender advice and construction administration, and identify any separate specialist tasks. Unknown access or missing drawings should remain visible assumptions.

### Choose the correct roof section on Prince of Wales Drive

In a block, identify the stair and flat before using a roof repair history. An invoice naming only the road may cover a different roof.

For a long block on Prince of Wales Drive, include a window schedule or annotated external photograph with the flat number. Successive staircases can have similar top landings, and one manager's description of the west end may refer to an entrance rather than the whole roof. If contractors attended twice, record which stair gave access on each occasion. A leak recurring after repair may sit outside the repaired section. Identifying the boundary of that work helps the surveyor distinguish a question about a previous repair from investigation of a second roof feature.

### Appointment for a shared building

A landlord or freeholder, an RMC or RTM company, or their authorised agent will usually commission the report. HCS represents that named client. Residents who meet the costs are outside that engagement. Subject to conflict checks, a leaseholder can request a separately scoped notice review alone, in a group or through a residents’ association. HCS declines a role against a landlord or agent it already serves on that matter.

### Programme, consultation and permission to start

Whether any contributor exceeds £250 for qualifying works is assessed across the scheme, regardless of invoicing arrangements. For qualifying long-term agreements consider an individual leaseholder’s contribution above £100 in the accounting period. For ordinary consultation keep the notice of intention and statement of estimates in date order. Each gives its own 30-day period for leaseholder observations. The landlord may apply to the First-tier Tribunal for section 20ZA dispensation. Grant is discretionary.

[Section 20 of the Landlord and Tenant Act 1985](https://www.legislation.gov.uk/ukpga/1985/70/section/20) · [The 2003 consultation regulations for England](https://www.legislation.gov.uk/uksi/2003/1987/contents) · [Section 20ZA](https://www.legislation.gov.uk/ukpga/1985/70/section/20ZA)

### If you have received a notice

HCS provides technical information. Notice preparation and service sit with the landlord or agent and, where needed, its solicitor. Lease and payment disputes require legal advice.

### Fees and scope of the appointment

Initial technical assessment

From £1,800 including VAT

£1,500 professional fee plus £300 VAT at 20%.

The starting fee applies to an initial technical assessment of a single residential building where the written quotation confirms it.

The client receives a technical scope or recommendations in writing, following examination of the documents and an inspection or desktop review agreed for the building. Price later stages individually. These include specification and tender work and, under a further appointment, contract administration. Clarify any specialist input or extra attendance.

Timing follows review of documents, access and deadlines. An enquiry reserves no visit or response date. Do not read the assessment price as a works budget or a charge per flat. A service-charge recovery question depends on the lease and the rules.

### Independence

When HCS defines, tenders or administers works it cannot bid for their construction. Any group connection with a tenderer is declared and reviewed before the contractor is invited. [Conflicts of interest](/about/conflicts-of-interest).

### Local evidence

- [Wandsworth: Battersea Square Conservation Area Appraisal](https://www.wandsworth.gov.uk/planning/conservation-and-urban-design/conservation-areas/battersea-square-conservation-area-appraisal/)
- [Wandsworth Council: Battersea Park Conservation Area Appraisal and Management Strategy](https://www.wandsworth.gov.uk/media/1583/battersea_park_conservation_area_appraisal_and_management_strategy_2014.pdf)
- [Wandsworth Council: Shaftesbury Park Estate Appraisal and Management Strategy](https://www.wandsworth.gov.uk/media/1681/shaftesbury_caaandms.pdf)
Content updated: November 2026

### Discuss the building

Call 020 7101 4590

## Guide links

- [Local Level 3 building survey](/areas/battersea-level-3-building-survey)
- [Contract administration](/areas/battersea-contract-administration)
- [Licence to alter surveying](/areas/battersea-licence-to-alter)
- [Party wall advice](/areas/battersea-party-wall)
- [Building condition surveys](/areas/battersea-condition-surveys)
- [Schedules of condition](/areas/battersea-schedules-of-condition)
- [Planned maintenance surveys](/services/planned-maintenance-surveys-london)
- [London Section 20 and major works consultancy](/services/major-works-consultancy-for-residential-blocks)
- [All Section 20 locations](/services/major-works-consultancy-for-residential-blocks#s20-areas)
- [Surveying services](/areas/battersea)
- [Chelsea](/areas/chelsea-section-20-major-works)
- [Clapham](/areas/clapham-section-20-major-works)
- [Wandsworth](/areas/wandsworth-section-20-major-works)
- [Vauxhall](/areas/vauxhall-section-20-major-works)
- [Section 20 contribution checker](/tools/section-20-consultation-checker)
- [Section 20 timeline planner](/tools/section-20-timeline-planner)
- [Received a Section 20 notice? A leaseholder checklist](/insights/received-section-20-notice-leaseholder-checklist)
- [Council major works bills: what an independent surveyor can review](/insights/council-leaseholders-major-works-independent-review)
- [A major works decision guide for RMC and RTM directors](/insights/major-works-guide-for-rmc-and-rtm-directors)
- [Understanding Section 20 consultation for major works](/insights/understanding-section-20-consultation-for-major-works)

## FAQs

**Can a rate from another roof section be applied automatically?**

Check pitch, height, access and the repair actually observed. Record the measured quantities before extrapolating costs across the block.

**Does a former warehouse use establish a particular defect?**

No. It provides history that may help frame an investigation, but the repair recommendation needs evidence from the actual building. Alterations can change construction and use substantially. Record what has been inspected and distinguish it from assumptions about the earlier structure.

---

Sister company [Hampstead Renovations](https://www.hampsteadrenovations.co.uk/), renovation and refurbishment, London.

Hampstead Chartered Surveyors & Building Consultancy — RICS Regulated Firm No. 923064
020 7101 4590 · enquiries@hampsteadcharteredsurveyors.co.uk
Unit 3, Palace Court, 250 Finchley Road, London NW3 6DN

Source: https://www.hampsteadcharteredsurveyors.co.uk/areas/battersea-section-20-major-works