# Party Wall Surveyor in Bramley, Surrey: Agreements, Notices and Awards

Before extending beside a Bramley lane, distinguish the house wall from a stone enclosure or retaining wall. Identify the fabric and levels beside the new work.

Party Wall Notices from £195 plus VAT per notice · Schedules of Condition & Party Wall Awards

### A trench beside a lane-edge property

The appraisal places some Snowdenham Lane buildings directly at the lane edge and others behind walls. Street visibility is not confirmation that access is available elsewhere.

Ask who holds the necessary keys and whether another occupier controls a gate or passage. Photographs supplied with the enquiry should make clear which elevation they show and when they were taken, where known.

The Snowdenham Lane description includes a stone retaining wall beside a steep vegetated bank. Its presence in a village appraisal does not include it automatically in the inspection.

Identify external structures, changes of level and the access available around them.

Consider extending accommodation at the base of a bank. Give the Party Wall surveyor a section through the proposed excavation and any nearby adjoining building or structure, including the feature retaining the higher ground. Show the existing levels and the deepest point of each stage. Section 6 of the Party Wall etc. Act 1996 contains distance and depth tests. A dimension drawn to the boundary on the planning layout is only a starting point. The information about neighbouring foundations must be identified as measured, supplied on a particular record or still unknown.

If a new wall is intended at the line of junction, mark where its faces and footing will fall relative to the boundary. That engages the separate section 1 enquiry. Distinguish any unresolved ownership of an old stone enclosure from the technical question of how a new foundation can be built nearby.

### Brick surrounds, stone walls and openings

The 2005 appraisal calls the local Bargate stone a much used material, with quoins or window surrounds sometimes picked out in red brick and sometimes galleting, inclusions such as ironstone pressed into the mortar joints. It describes tile hanging, usually only on the upper floors, as a local tradition, explaining that clay roofing tiles were adopted as a cladding over timber-framed walls once they became cheap, and it calls Bargate stone walls a particularly important characteristic of the conservation area.

The appraisal identifies rat-trap brick construction at the named Brewery Cottages group.

Keep the account alongside available alterations and repair records, including photographs taken during earlier work. Evidence from one opened section should not be silently extended to every wall, addition or floor of the property.

A builder might propose cutting a new bearing at the back of a terrace. Identify where the beam ends and what material would be disturbed at that point. Relevant work to a party structure under section 2 is notified under section 3. A red-brick window surround or a panel of tile hanging may locate the room in an elevation, but neither establishes the support behind the visible surface. Ask the designer to distinguish evidence at the proposed bearing from what is assumed from another part of the wall.

Waverley Borough Council describes Bramley as a historic village on the important route between Guildford and Horsham, built up as a ribbon either side of that ancient routeway, with many good examples of sixteenth to nineteenth century dwellings and commercial properties. The same page dates the conservation area's designation to 1974, with an amendment in 1990, and the council's appraisal of the area was adopted as a Supplementary Planning Document on 19 July 2005. That appraisal records that most of the oldest buildings are timber framed, sometimes re-fronted over time.

Keep earlier opening-up photographs with dates and positions. If the proposed method changes once a hidden frame is exposed, explain the revision to the surveyor and the adjoining owner through the appropriate procedure. A previously identified beam pocket and a new arrangement of temporary props can affect different rooms.

### Photographs before work near the stonework

Ask for the invoice, specification and photographs actually available, retaining their dates and stated locations. This gives the surveyor a focused history to compare with visible conditions without treating a repair description as proof of the underlying cause.

For the schedule of condition, photograph the junction from far enough back to show its position on the elevation before making a detail image. A sketch showing level changes can be more informative than a close view of an isolated joint. Note surfaces obscured by plants or a wall beside the lane. Where a neighbour recalls earlier repairs, record their account and its date separately from observations made during the survey.

A narrow approach can leave room for access on foot but no safe place for a construction platform. Discuss the contractor's proposals, the necessary rights and protection of the existing paving with the appropriate owners. Record inspection arrangements in their own terms. A person granting access to take photographs has not necessarily agreed any use of the passage during construction.

### The council decision and the engineering detail

Look up the property with Waverley Borough Council before assuming what its designation allows. Compare the planning or heritage drawings and building control submission with the designer's construction issue. If a lease or other private agreement limits alterations, deal with the permission it requires. The award concerns only matters under the Act. It cannot establish who owns a retaining wall or authorise works to a listed building on the council's behalf.

### For neighbours on different levels

Where a notice drawing shows the lane but omits a lower room, bank or neighbouring return, mark it on a separate copy. Keep the date of service, enclosures and any records of earlier work to that wall. The [adjoining-owner guidance](/services/party-wall-surveyor-for-adjoining-owners) explains how to respond and what information will help a surveyor understand the difference in levels.

### Bramley, Surrey party wall questions

Local evidence

- [Waverley Borough Council: Bramley Conservation Area Appraisal (Supplementary Planning Document, adopted 19 July 2005)](https://www.waverley.gov.uk/Portals/0/Documents/services/planning-and-building/heritage-and-trees/Heritage/Bramley%20Conservation%20Area%20Appraisal%20SPD.pdf?ver=4JUQbprESco48xFmqvAv3Q%3d%3d)
- [Waverley Borough Council: Conservation Areas](https://www.waverley.gov.uk/services/planning-and-building/heritage-trees-and-design/conservation-areas)
- [Bramley Parish Council: Bramley Neighbourhood Plan 2017 to 2032 (final version, October 2021)](https://www.waverley.gov.uk/portals/0/documents/services/planning-and-building/planning-strategies-and-policies/local-plan/local%20plan%20part%202%20examination/lpp2%20cd2%2042%20bramley%20neighbourhood%20plan%202017%202032.pdf)
- [Bramley Conservation Area Appraisal, adopted 19 July 2005](https://www.waverley.gov.uk/Portals/0/Documents/services/planning-and-building/heritage-and-trees/Heritage/Bramley%20Conservation%20Area%20Appraisal%20SPD.pdf?ver=4JUQbprESco48xFmqvAv3Q%3d%3d#page=10)
- [Party Wall etc. Act 1996](https://www.legislation.gov.uk/ukpga/1996/40/contents)
- [GOV.UK guidance on party walls and building work](https://www.gov.uk/party-walls-building-works)
Content updated: November 2026.

### Other Bramley, Surrey surveying services

- [Level 3 Building Survey](/areas/bramley-level-3-building-survey)
- [Schedules of Condition](/areas/bramley-schedules-of-condition)
- [Measured Surveys and Lease Plans](/areas/bramley-measured-surveys-lease-plans)
- [Licence to Alter](/areas/bramley-licence-to-alter)
- [Building Defect Investigations](/areas/bramley-building-pathology)
- [Building Condition Surveys](/areas/bramley-condition-surveys)
- [Section 20 Major Works](/areas/bramley-section-20-major-works)
- [RICS Home Surveys](/areas/bramley-home-surveys)
- [Snagging Surveys](/areas/bramley-snagging-surveys)
[Party wall surveying service](/services/party-wall-matters) · [Bramley, Surrey area guide](/areas/bramley)

### Need party wall matters in Bramley, Surrey? Call 020 7101 4590.

If notices lead on to building work, [Hampstead Renovations](https://www.hampsteadrenovations.co.uk/party-wall-refurbishment-london/), our sister company, can quote for it, never as a condition of our advice. [How we manage conflicts of interest](/about/conflicts-of-interest).

---

Hampstead Chartered Surveyors & Building Consultancy — RICS Regulated Firm No. 923064
020 7101 4590 · enquiries@hampsteadcharteredsurveyors.co.uk
Unit 3, Palace Court, 250 Finchley Road, London NW3 6DN

Source: https://www.hampsteadcharteredsurveyors.co.uk/areas/bramley-party-wall