<!-- source-hash: 11a7f6d21a464fe16dde21fb749621719fe20181a5b252fa950d6fee82500c40 -->
# Licence to Alter Surveyors in Cheam

Technical surveying advice for leasehold alterations: agree the client, proposal and written output before instruction.

### For leaseholders and applicants

If you are a leaseholder or applicant, we can review the available proposals, identify missing technical information and help you prepare a response to the landlord’s technical requirements. We coordinate with your architect, engineer or legal adviser where that work forms part of our appointment.

Tell us whether the landlord has already appointed a reviewing surveyor and share their requirements when available. Appointing HCS does not replace that adviser, override the lease or guarantee acceptance of an application.

Request applicant-side surveying support

### For freeholders, landlords and managing agents

For a freeholder, landlord or authorised management client, we review the applicant’s drawings and supporting information, identify technical risks and omissions, and recommend proportionate technical conditions or next steps. Inspections during or after works are undertaken only if separately agreed in the appointment.

Name the actual instructing client and their capacity. An agent, resident management company or right-to-manage company does not have identical approval powers in every building. We establish the client and check conflicts before accepting an instruction; we do not promise to act for both sides on the same application.

Enquire as the freeholder or landlord · Enquire as a managing agent, RMC or RTM

### When the service helps and what we review

Wall or layout changes, a new kitchen or bathroom arrangement, flooring, services, ventilation and external equipment may require consent under the lease. The position depends on the actual lease, the works and whether demised, retained or shared parts are affected. Not every refurbishment follows the same approval process.

Within the agreed competence and scope, the technical review considers available existing and proposed drawings, a works specification, relevant landlord requirements and appropriate specialist information. It can address effects on structure, shared services, fire separation, sound transmission and waterproofing, and identify where more information is needed.

- Show what exists and what is proposed, including the unit, floor and boundaries affected.
- Identify structural openings, wet areas, service routes and connections to shared systems.
- Provide relevant engineer, fire, acoustic or other specialist information when it exists; we can identify gaps in the submission.
- Agree any inspection purpose, accessible areas and permissions before a visit.
Reviewing specialist information is different from producing engineering calculations, propping design, a fire strategy, acoustic testing or statutory approval. These are not automatically included in the surveying appointment.

### What you receive

Technical review of available alteration proposals, with written comments on the agreed documents, information gaps and next steps for the appointed client.

- A record of the information considered and the agreed technical questions.
- Comments on relevant risks, omissions or further supporting information needed.
- Recommended next steps or proportionate technical conditions for consideration.
- Inspection observations and access limitations where a visit is part of the appointment.
The output is technical advice. It is not legal drafting or approval to start work. The party authorised under the relevant lease and management arrangements decides whether consent is granted; the appropriate appointed legal adviser handles legal interpretation, the licence deed and any lease variation.

### Initial review, revised proposals and later stages

- Enquiry and client identification. Tell us the property, your role, the proposal and its current stage. We check whether we can accept the appointment.
- Written scope and quotation. Agree the documents, proposed works, output, access and fixed fee before instruction.
- Initial review. We consider the available information within the agreed brief and set out technical comments and information gaps.
- Revised proposals. Changes to the design or further submissions may need additional review. Confirm what responses are included and agree extra work before it proceeds.
- Works and completion. Any inspection plan and completion review need an express scope, suitable access and the relevant information.
Inspections during works, completion review and ongoing monitoring are included only where expressly agreed. Further proposals or additional review rounds require an agreed scope and fee.

A visit reports on the agreed accessible work at that time. It is not continuous supervision, inspection of concealed work, a structural-safety certificate or comprehensive compliance certification. Any completion report states what was seen, the information reviewed and the outstanding matters or limitations; it does not replace statutory completion documentation.

We confirm availability and reporting times for the agreed work in the quotation. Other parties determine their own review and consent process.

#### Enough to start an enquiry

Give the address or postcode, who would appoint HCS, a short description of the alterations and the current stage. Mention a deadline and the documents you already hold. You can enquire before the lease, drawing set or calculations are complete.

#### Information for a fuller technical submission

- Relevant lease provisions, a lease plan and property-specific landlord or managing-agent requirements.
- Existing and proposed drawings, the specification and any method statements relevant to the works.
- Available structural, services, fire, acoustic or waterproofing details where relevant.
- Correspondence, previous approvals, statutory submissions and the names of appointed advisers.
- Access arrangements for the unit, common parts and any adjoining property within the proposed brief.
The actual submission list follows the works and the recipient’s requirements. After the enquiry, we confirm the appropriate secure way to send documents. Do not send another party’s confidential information without the appropriate authority.

### Consent, legal advice and works already started

Landlord consent, planning permission, listed-building consent, Building Regulations approval and any applicable party wall process are separate requirements. Completing one does not automatically satisfy another. Ask the relevant advisers to check which apply to the property and proposal.

HCS provides the agreed technical surveying advice and does not provide legal advice or draft the legal licence deed. A paid technical review is not permission to start work. Consent may be subject to conditions or may not be available under the relevant lease.

#### Changed proposals, works underway or completed works

Tell us what changed, when work started and what remains accessible. Supply earlier drawings, photographs, correspondence and any completion information you hold. We can discuss a suitable technical brief, but inaccessible or concealed work and gaps in earlier records limit what can be assessed. We do not promise retrospective consent, automatic regularisation or a particular sale, lease or enforcement outcome.

### Alteration proposals in Cheam

These source documents describe particular parts of Cheam at their own publication dates. Use them to frame the proposal and access questions; they do not establish ownership, the lease terms, the current condition or the designation of an individual address.

The 2021 appraisal describes a listed cluster on Malden Road as white timber with red tiled roofs, with an uneven appearance because they sag with age; on the southern side of Park Lane, most of the Grade II cottages are white weatherboard dating from the 17th to the early 19th century. With a cottage like that, some sagging is part of its recorded character, so the sharper questions are whether boarding, tiles and joinery still throw off water and what earlier repairs used.

Parkside shows the interwar side: large detached and semi-detached suburban villas erected in the 1920s on the former Cheam House grounds, with a strong Arts and Crafts influence, bay windows and grouped chimney stacks, and a number of houses have uPVC windows and replacement front doors. On Ewell Road, Wildes Cottages form a symmetrical terrace of eight cottages built around 1890.

##### Alterations beside adjoining property

For an attached house or a flat formed within a terrace, mark shared walls, floor levels and the proposed structural openings clearly. Obtain available records of earlier alterations rather than assuming adjoining buildings have identical layouts. Discuss access to adjoining or retained parts where it is needed for the technical brief, and ask separately about any applicable party wall procedure.

##### External work and upper levels

For changes at roof level, a balcony or external equipment, show the existing elevation and the proposed location, fixing and service routes. Establish which parts are demised or retained and how any agreed inspection could safely reach them. Planning or listed-building requirements are checked for the specific property separately from the lease-consent process.

##### Existing fabric and building records

Explain which existing surfaces, openings and building elements the proposal would change, using current photographs and drawings where available. The documentary descriptions help frame questions; they do not prove the present construction or designation of your property. Ask the relevant advisers to establish heritage and statutory requirements for the address before fixing the works specification.

Local research and sources

- [London Borough of Sutton, Cheam Village Conservation Area Character Appraisal and Management Plan (June 2021)](https://www.sutton.gov.uk/sites/default/files/2026-04/Cheam%20Village%20CA%20Appraisal%20and%20Mangement%20Plan%20%282021%29.pdf)
### Fees and the initial appointment

Licence to alter surveying from £700 plus VAT. We confirm who we are acting for, the technical scope and the fixed fee before you instruct.

Your written quotation identifies the documents and proposed works covered, the written technical output, whether a site visit is included and any included responses or revised-submission reviews. These allowances are not fixed by the advertised starting fee.

The final scoped quotation depends on the proposal, documents, complexity, client role, access and agreed stages. The starting figure is not the price of a guaranteed legal licence or the whole consent process. It does not imply unlimited support, a fixed visit allowance or a set number of revisions.

Schedules of condition, design, specialist investigations, later inspections and completion review need express agreement where required. HCS fees are separate from any landlord, estate, solicitor and statutory charges. Responsibility for those other charges depends on the lease, the appointment and the applicable process; ask for them to be explained separately.

### Professional responsibility, evidence and separate roles

Professional information: Savas Bulduk BSc (Hons) MRICS, Director & Chartered Building Surveyor. Your written appointment identifies the responsible professional and their role. Verify the firm’s RICS regulation details.

Where HCS acts for the freeholder or managing agent reviewing a licence to alter application, HCS will not accept the contractor appointment for the same matter. Professional advice, group design services and works appointments remain separate. Any HAP or HR referral is optional, separately scoped and subject to the actual appointment and conflict policy; review of connected work is not automatically independent.

Enquiry documents are handled for the agreed purpose and are not automatically shared with another group business. Read how we manage conflicts of interest.

### Practical questions before you instruct

What does the starting fee cover?

Licence to alter surveying from £700 plus VAT. We confirm who we are acting for, the technical scope and the fixed fee before you instruct. Your written quotation identifies the documents and proposed works covered, the written technical output, whether a site visit is included and any included responses or revised-submission reviews. These allowances are not fixed by the advertised starting fee. Later stages and specialist work need express agreement.

Can I enquire before I have drawings or a complete submission?

Yes. Start with the property address or postcode, your role, a short description of the alterations and the current stage. Tell us what documents exist. We can scope the initial review and identify information still needed without treating a complete submission as an enquiry requirement.

Who appoints HCS, and who grants consent?

We identify the actual client and their capacity before accepting an instruction. HCS provides the agreed technical advice for that client. The party authorised under the relevant lease and management arrangements decides whether consent is granted, with legal documentation handled by the appropriate appointed legal adviser.

Does every alteration need a formal licence?

No single rule covers every property. The lease, proposed works and affected demised, retained or shared parts determine the consent position. Ask your legal adviser about the lease requirements; a technical review does not itself grant permission.

What should I clarify about an alteration proposal in Cheam?

For an attached house or a flat formed within a terrace, mark shared walls, floor levels and the proposed structural openings clearly. Obtain available records of earlier alterations rather than assuming adjoining buildings have identical layouts. Discuss access to adjoining or retained parts where it is needed for the technical brief, and ask separately about any applicable party wall procedure.

Are site visits, revised drawings and completion inspections included?

Only as identified in the written scope. The starting fee does not establish a visit allowance, a number of review rounds or unlimited ongoing support. A visit reports on agreed accessible work at the time; concealed or inaccessible work limits what can be assessed.

How long will the review and consent take?

We confirm availability and reporting times for the agreed work in the quotation. Other parties determine their own review and consent process. The condition of the submission and any further information requested can affect the sequence. We do not promise a universal consent deadline.

Can you help if the design changed or the works have started?

Tell us the actual stage and supply earlier drawings, photographs and correspondence where available. We can discuss an appropriate technical brief and its evidence and access limits. Retrospective consent, regularisation and a particular transaction outcome are not guaranteed.

Are landlord and legal charges included in the HCS fee?

No. HCS surveying fees are distinct from any landlord, estate, solicitor or statutory charges. The lease and applicable arrangements determine responsibility for those costs; ask each party to explain its scope and charges.

### Related services and guidance

- Party wall advice: a separate process
- Schedules of condition: a separate factual record
- Guide to leasehold alterations
- Understanding licence to alter costs
Separate service: schedules of condition from £750 plus VAT. A factual condition record is separately scoped and is not included automatically in the LTA starting fee.

Service scope and complete area directory · Cheam area guide

#### Nearby licence to alter pages

- Carshalton
- Hounslow
- Mortlake
- Roehampton
- Furzedown
Primary guidance

- [LEASE: alterations and home improvements](https://www.lease-advice.org/building-management/repairs/alterations-and-home-improvements/)
- [LEASE: approval powers of a right-to-manage company](https://www.lease-advice.org/building-management/right-to-manage/running-a-right-to-manage-company/granting-approvals/)
- [GOV.UK: party walls and building work](https://www.gov.uk/party-walls-building-works)
- [RICS: operative Conflicts of interest standard, first edition (reissued July 2023)](https://www.rics.org/content/dam/ricsglobal/documents/standards/Conflicts%20of%20interest_global_July23%20(1).pdf)
A council can act as landlord for its own housing and separately as planning or building-control authority. For example, [Camden’s landlord alterations procedure](https://www.camden.gov.uk/property-alterations-or-improvements) applies to the properties and tenures it identifies; it is not a rule for every property in the borough.

---

Hampstead Chartered Surveyors & Building Consultancy — RICS Regulated Firm No. 923064
020 7101 4590 · enquiries@hampsteadcharteredsurveyors.co.uk
Unit 3, Palace Court, 250 Finchley Road, London NW3 6DN

Source: https://www.hampsteadcharteredsurveyors.co.uk/areas/cheam-licence-to-alter
