When a specification says replacement window, ask whether it includes the box, sill or only the moving sashes. Tie a numbered schedule to photographs and the actual lease plan.

For a written technical review, fees start from £700 plus VAT (£840 including VAT). Agree the brief before appointing the surveyor.

### Separating the sash from the box frame

The Royal Borough of Kensington and Chelsea's 2016 Royal Hospital Conservation Area Appraisal describes formal terraces such as Wellington Square, Royal Avenue and Cheltenham Terrace alongside individual houses such as the artists' studios in Tite Street. The appraisal says the architecture ranges from small two-storey terraced houses to larger terraced houses and flats of five storeys, mostly in stock brick, stucco and stone with vertically sliding timber sash windows. It dates the Tite Street artists' studios to the 1870s.

The appraisal records that many Georgian and Victorian terrace houses in the conservation area have original half-basements or lower ground floors with lightwells beside the pavement.

RBKC’s Royal Hospital appraisal describes Georgian and Victorian terraces, studios and detached houses, with contrasts between smaller houses and larger houses or flats. Its summary of character records brick, stucco, stone and timber sash windows. Sections 1.5–1.6 and 1.9 support this named Chelsea conservation-area example, not a uniform construction claim for the wider neighbourhood or a diagnosis of the home offered for sale.

Keep a photograph of the whole frontage alongside the close-up of the frame. Number the openings on both photographs and explain which number belongs to the flat.

### Specify the parts of the sash that will stay

Ask for a section that passes through the sash, its box and the sill. Mark the proposed disturbance to the reveal on both sides. If rot or damage is the reason for replacement, locate the affected piece rather than describing all the windows as defective. Distinguish the observed condition from a choice to change the glazing. Show orientation on cropped plans, especially where two rooms or entrances look alike. Use a short schedule to tie each proposed intervention to the corresponding plan, section or elevation. The client can ask for a written distinction between information needed for review and information to be obtained during separately agreed later work.

If retaining the box is proposed, ask the joiner how it would be protected when removing the sash. A repair specification can name splice locations and profiles without requiring removal of the whole external frame. Provide a marked-up photograph to tie those descriptions to individual pieces of timber.

### Applicant’s brief

An applicant who has received queries from the landlord can commission a review of the revised proposal. Start with the flat address, the intended client and the role you hold in the proposed instruction. Mark the issue dates on the plans and enclose the matching specification and any applicable method statement. A client can use the technical comments to identify the items that still require work by the designers.

Applicant enquiry

### Landlord’s review

An authorised landlord or management body can seek technical comments on the applicant’s plans. Managing the common parts and holding the alteration-consent power can be different responsibilities. The surveyor checks the parties for conflicts and acts for one side on the application.

Landlord · Agent or board

### Reading the alterations clause

A landlord’s application form cannot change an absolute prohibition in the lease. Where the covenant is qualified, the tenant can seek the consent required by that wording. The [Landlord and Tenant Act 1927](https://www.legislation.gov.uk/ukpga/Geo5/17-18/36/section/19) deals with certain improvements in section 19(2). Where its conditions are met, a requirement for consent is subject to the proviso that the landlord cannot unreasonably withhold it.

Where the separate proposal is an assignment, ask the legal adviser about the [Landlord and Tenant Act 1988](https://www.legislation.gov.uk/ukpga/1988/26/section/1). Under a qualifying covenant, service of the tenant’s written application requires a written decision within a reasonable time that records conditions or explains refusal. The 1988 timetable does not apply to alterations as such. HCS gives technical advice only. Consent is the landlord’s decision and your legal adviser deals with the lease and the deed.

Check with the relevant planning authority where the work or building may need planning or listed-building consent. Building Regulations and party wall matters require separate consideration even when the landlord has agreed the drawings.

### Before work starts

If a schedule of condition is requested, its scope is agreed in its own right, with fees from £750 plus VAT (£900 including VAT). Freeholder and estate costs, legal fees and statutory charges are separate from our technical appointment. The figure due and the person responsible need to be established for the individual matter.

A schedule for alterations at one of these building types should name the part the parties actually need to see. A studio connected to a dwelling by a passage can share an address without sharing all its routes. Mark the studio, the main house and the intervening path on a current plan. If only the studio interior and path are within the appointment, the main house may appear in the context photographs without being an inspected space.

For a townhouse with recent frontage work, ask for the schedule identifying which stucco areas and sash windows were treated. Distinguish a decorative finish from a repair, replacement or investigation of the component beneath it. Date photographs against the work account so that the affected elevation is clear.

A high studio window can give a room a clear individual shape and provide a reliable starting point for the photographic sequence. Face the wall with the window and work around the perimeter using the doors and corners as fixed references. If the glazing is beyond ordinary close sight, state the floor-level viewing position. A photograph that locates the window does not amount to a close condition record of every joint in the frame.

[Schedules of condition in Chelsea](/areas/chelsea-schedules-of-condition)

### Pricing work to sash or box frame

The fee starts from £700 plus VAT (£840 including VAT). HCS takes the applicant’s or the landlord’s instruction and agrees a fixed price with that client alone.

Identify which parts of the window are to be retained. Ask for the quotation to specify whether it covers a replacement sash, work to the box or comparison of both options.

A quotation states which records are covered and when the surveyor can deliver the agreed comments. Read its allowances for visiting, replying and considering another issue of the proposal. Allow for the landlord’s review separately when arranging the programme.

Site checks during construction, a completion review and ongoing monitoring need express terms. New proposals or additional review rounds require an agreed scope and fee.

[Costs guide](/insights/licence-to-alter-costs-in-london-leaseholder-guide)

### Separate appointments

Surveying for the landlord on this application precludes HCS undertaking the reviewed work as contractor. The client chooses whether to request a referral to a group company and whether to instruct that company. [Conflicts policy](/about/conflicts-of-interest).

### Local evidence

- [Royal Borough of Kensington and Chelsea: Royal Hospital Conservation Area Appraisal (adopted 31 March 2016)](https://planningconsult.rbkc.gov.uk/gf2.ti/f/689922/20233989.1/PDF/-/Royal_Hospital_CAA__post_consultation_document__low_res.pdf)
### Further reading

- [Level 3 survey in Chelsea](/areas/chelsea-level-3-building-survey)
- [Party wall guidance](/areas/chelsea-party-wall)
- [Chelsea guide](/areas/chelsea)
- [London service](/services/licence-to-alter-surveyors-london)
- [Leaseholder guidance](/insights/licence-to-alter-guide-for-london-leaseholders)
Content updated: November 2026.

Where the instruction also needs architectural or structural design, [Hampstead Renovations](https://www.hampsteadrenovations.co.uk/licence-to-alter/) can be appointed separately. [How we manage conflicts of interest](/about/conflicts-of-interest).

## FAQs

**If only the glass changes, why show the frame?**

Different glass or glazing bars can affect the space needed in the sash and the appearance from outside. A frame section lets the designer show whether the change stays within the existing joinery or would require more work.

---

Sister company [Hampstead Renovations](https://www.hampsteadrenovations.co.uk/), renovation and refurbishment, London.

Hampstead Chartered Surveyors & Building Consultancy — RICS Regulated Firm No. 923064
020 7101 4590 · enquiries@hampsteadcharteredsurveyors.co.uk
Unit 3, Palace Court, 250 Finchley Road, London NW3 6DN

Source: https://www.hampsteadcharteredsurveyors.co.uk/areas/chelsea-licence-to-alter