<!-- source-hash: 4bab5c4ff976ff7e8026f7672aca28dfca38b609ddec7e1fcfa4fc8a66ff3036 -->
# Schedules of Condition in Colindale

A dated written and photographic record of the visible condition of agreed property elements at inspection.

#### Commercial lease

Record the agreed premises before entering the lease, for the intended use with that document. Any limitation of repairing obligations depends on the lease wording and proper incorporation; your solicitor advises on legal drafting and effect.

#### Pre-works or neighbouring property

Document visible, accessible condition before construction changes it. The record can support later comparison; it does not prevent damage, establish who caused a later change or guarantee compensation.

#### Licence to alter or refurbishment

Record the agreed unit, adjoining areas or common parts before alterations. The schedule does not grant landlord consent, planning permission or building-control approval.

#### Another condition-record requirement

Explain the intended use, audience and property elements. We agree the extent and deliverable individually; a particular asset, specialist inspection or repeat visit is not automatically included.

### What is inspected and recorded?

A schedule of condition survey records what is visible and accessible within an agreed inspection boundary. That boundary may cover specified rooms, elevations, external areas, common parts or an adjoining property. It must be clear before the visit which of those are included.

The written entries describe surfaces and visible cracking, staining, wear, patching and damage neutrally. Photographs are organised to match the location and observation. A stain is recorded as a stain; the schedule does not turn it into a diagnosis of rising damp, a cause of leakage or an allocation of fault.

Furniture, stored goods, locked rooms, height and unsafe access may limit visibility. The report identifies omissions and restrictions. It does not certify structural safety, regulatory compliance, concealed condition or the quality of all workmanship.

### What you receive

The written and photographic record identifies the property, purpose, inspection date and agreed extent. It is organised so the intended reader can locate an observation without having attended the inspection.

- Room, area and element references, with clear descriptions of visible condition.
- Photographs cross-referenced to the relevant observations.
- Access restrictions, omitted areas and limitations of the record.
- An identified report issue for the agreed recipients and purpose.
Discuss the intended recipients and any review or acknowledgement process before instruction. Issuing the report does not automatically make it an agreed baseline. Another party is not automatically required to sign, and acknowledgement does not by itself establish legal effect.

Annotated plans, crack measurements, original image archives, joint signatures, particular file formats and retention arrangements are included only where confirmed in the appointment.

### From brief to issued record

- Brief. Give the address, purpose, areas to record, intended recipients and lease or works deadline. Tell us whether anything has already started.
- Scope and written quotation. Agree the inspection boundary, deliverable, access assumptions and fixed fee before instruction.
- Access. Arrange permission and attendance for the agreed premises. Identify occupied rooms, common parts and neighbouring properties, and involve the relevant occupier or managing agent.
- Inspection. Record the accessible condition on the actual inspection date using consistent location and photographic references.
- Preparation, checking and issue. Assemble the written and photographic record, check references and limitations, and issue the identified report for the agreed use.
Arrange inspection before the relevant lease or works deadline. Availability and reporting times are confirmed in the quotation. A record made after works have started cannot recreate undocumented earlier condition. We record the actual dates and any relevant information about work already undertaken.

### Limits and separate appointments

A schedule is a factual condition record. It is different from a Level 3 purchase survey, a full building condition survey, a residential inventory, a technical defect investigation or a schedule of dilapidations setting out alleged breaches and remedial obligations.

In a party wall matter, the condition record is separate from notices, consent, surveyor appointments and an award. The government explanatory booklet says recording a schedule is not a requirement of the Act. Commissioning one does not complete the statutory process; full party wall services require a separate agreed scope.

Reinspection, comparison reports, technical diagnosis, repair specifications, cost planning, expert evidence and ongoing monitoring are included only when expressly commissioned. Legal advice, party wall awards and repairs are not included in the starting offer. A later dispute may require further evidence; the schedule does not conclusively settle it.

### Recording property condition in Colindale

The local documents below describe particular buildings and parts of the area at their own publication dates. They help identify the inspection boundary and access questions; they do not establish the current condition, construction progress or designation of your property.

The Victoria County History's 1976 volume on Hendon records terraces built in Colindale and Annesley avenues between 1897 and 1914. It adds that rows of small terraced and semi-detached houses continued to be built between the airport and Edgware Road after the factories had turned over to peacetime production. Neither passage describes a particular house, and a street's date does not show whether its walls are solid or cavity.

The RAF Museum's Colindale guide says Aeroville was designed in 1917 for Grahame-White factory employees, that the architecture is based on 18th century Georgian designs and that 30 houses were the only part completed.

##### Adjoining surfaces and access

For the terraces or closely arranged buildings described in the sources, identify each elevation and which side of the boundary it is viewed from. A neighbouring interior, rear yard or flank wall requires its own access arrangement; a photograph taken from your property does not record an unseen adjoining room.

##### Finishes and alterations

For the materials and historic details described here, identify the exact surface and location of existing wear, patching, cracking or staining. Distinguish original-looking fabric from visible later work without assigning an age or cause that the evidence does not support; the schedule records condition and does not approve alterations.

##### House and external inspection boundary

For a house in the setting described by the local documents, agree whether the record stops at the accommodation or also includes entrances, external walls, paths and boundary features. Identify outbuildings separately and confirm who can provide access; the name of the locality or the age of the house does not define the inspected extent.

Local research and sources

- [Victoria County History, Middlesex volume 5 (1976): Hendon, Growth after 1850](https://www.british-history.ac.uk/vch/middx/vol5/pp11-16)
- [RAF Museum: Around Colindale learning resource, May 2020](https://www.rafmuseum.org.uk/documents/ALD-London/Colindale%20learning%20resource%20V4_May%202020.pdf)
These are documentary descriptions from the named sources. Supply current plans and identify later alterations where known; the inspection records what is accessible on its own date.

### Fees and your quotation

Schedules of condition from £750 plus VAT. We confirm the inspection scope and fixed fee in writing before you instruct.

The final quotation depends on the inspected extent, size, number of properties or units, access, purpose and the agreed deliverable. The starting figure is not a fixed package for every instruction. No floor-area allowance, extra fee tier or urgent service is implied.

An inspection is required to establish current visible condition. A desktop document review is not a substitute. The quotation identifies what is included and any additional work that would need separate agreement.

### Professional details and record format

Professional information: Savas Bulduk BSc (Hons) MRICS, Director & Chartered Building Surveyor. Your written appointment identifies the responsible professional and agreed role. Check the firm’s RICS regulation details.

The following is an illustrative format, not an inspected property, an issued client schedule or a completed-project claim. No client photographs or details are shown.

*Illustrative entry structure only*

| Location reference | Written observation | Photograph references |
| --- | --- | --- |
| Room 01 / wall W01 | A crack is visible in the painted finish above the doorway. Its cause is not assessed in this record. | P01: room overview; P02: detail of the recorded surface. These are example references; no photographs accompany this illustration. |

An actual report uses the inspected property’s references, observations and matching photographs, with its inspection date and limitations. The format and any additional material are agreed for the intended use.

### Practical questions before you instruct

How much does a schedule of condition cost?

Schedules of condition from £750 plus VAT. We confirm the inspection scope and fixed fee in writing before you instruct. The inspected extent, size, number of properties, access, purpose and deliverable determine the final quotation.

Will it limit my commercial lease repairing liability?

Any intended limit depends on the lease wording and proper incorporation of the schedule. Ask your solicitor to advise on drafting and legal effect. Buying or attaching a schedule does not automatically cap every obligation or remove dilapidations exposure.

Does a neighbouring-property record prove who caused later damage?

It is evidence of the condition observed on its inspection date and may help later comparison. It does not itself establish causation, prevent damage or guarantee compensation. Further assessment may be needed and is separately commissioned.

Is it required by the Party Wall Act?

Recording a schedule is not a requirement of the Act, although the government explanatory booklet describes it as prudent. It is separate from notices, consent, appointment of surveyors and an award. A schedule alone does not complete the statutory process.

What should I clarify about the property in Colindale?

For the terraces or closely arranged buildings described in the sources, identify each elevation and which side of the boundary it is viewed from. A neighbouring interior, rear yard or flank wall requires its own access arrangement; a photograph taken from your property does not record an unseen adjoining room.

Who arranges access, and what if an area cannot be seen?

Agree the rooms, external areas, common parts or adjoining property before instruction. The client coordinates the necessary permissions and access with occupiers or managers. Inaccessible or obscured areas are recorded as limitations; another visit is included only if expressly agreed.

When should the inspection happen, and how long will the report take?

Arrange the inspection before the relevant lease or works deadline. Availability and reporting times are confirmed in the quotation. If work has already started, say so: a later record cannot recreate undocumented earlier condition.

Does the landlord or neighbour have to sign?

Agree the intended recipients and any review or acknowledgement process at the outset. Issue does not automatically create an agreed baseline or require a signature. Your solicitor advises on any legal effect of incorporation or acknowledgement.

Are repeat visits, diagnosis or repair advice included?

Only when expressly commissioned. A standard schedule records visible condition within its agreed boundary. Comparison reports, technical diagnosis, repair specifications, cost planning, expert evidence and monitoring need a separate agreed scope where required.

### Nearby pages and related appointments

- Schedules of Condition: scope, fees and full coverage
- Colindale area guide
- Level 3 Building Survey: a separate purchase inspection
- Party wall advice: a separate appointment
- Licence to alter advice
- Dilapidations advice for alleged lease breaches
- Schedule of condition checklist
#### Nearby schedule pages

- Barnet
- Golders Green
- Mill Hill
Professional and statutory references

- [RICS: Code for leasing business premises, section 7 (repairs)](https://www.rics.org/content/dam/ricsglobal/documents/standards/February_2020_Code_For_Leasing_Business_Premises_England_And_Wales_1st_Edition.pdf)
- [RICS: Dilapidations in England and Wales](https://www.rics.org/consumer-guides/dilapidations-england-wales)
- [GOV.UK: Party Wall etc. Act explanatory booklet, schedule of condition](https://www.gov.uk/government/publications/preventing-and-resolving-disputes-in-relation-to-party-walls/the-party-wall-etc-act-1996-explanatory-booklet#schedule-of-condition)

---

Hampstead Chartered Surveyors & Building Consultancy — RICS Regulated Firm No. 923064
020 7101 4590 · enquiries@hampsteadcharteredsurveyors.co.uk
Unit 3, Palace Court, 250 Finchley Road, London NW3 6DN

Source: https://www.hampsteadcharteredsurveyors.co.uk/areas/colindale-schedules-of-condition
