# Licence to Alter Surveyors in Earl’s Court

Mark cellar and half-basement levels in relation to the front area. Show where the service leaves the flat and which outer wall or common passage the installer expects to reach.

Allow from £700 plus VAT (£840 including VAT) for surveying advice on the alteration proposal. We quote for the particular instruction.

### A new service from the half-basement

The Royal Borough of Kensington and Chelsea's 2016 appraisal of the Earl's Court Square Conservation Area describes terraced housing, semi-detached houses and mansion blocks of mid-late Victorian date, built in yellow or red stock brick, stucco and stone with timber sash windows or side-hung casements. Buildings there range from two to seven storeys, and the appraisal traces a shift from large Italianate stucco and brick houses to smaller red-brick terrace houses and mansion blocks, the latter dating from the 1890s.

The appraisal says many of the Victorian terrace houses have original half-basements or lower ground floors with lightwells right beside the pavement, whereas the mews were built to front the street and never had basement levels. Behind, the gaps between closet wings are frequently filled in at lower ground floor with conservatory-style extensions, and the appraisal says rebuilt rear elevations have often meant taking out the half-landings of the stairs to make a level floor plate.

RBKC’s Earl’s Court Square appraisal describes mid- and late-Victorian terraces, semi-detached houses and mansion blocks. Sections 1.5–1.6 and 1.9 record stock brick, stucco and stone, with sash and casement windows. This is the documented character of the named conservation area, not evidence that every Earl’s Court flat has the same structure or that a particular conversion retains its original detailing.

Label the available supply or connection, the proposed equipment and the route between them. On each part of the route, distinguish apparatus serving the flat alone from equipment thought to serve another unit.

### Trace the service past the area steps

Plot the service route from the lower room to its termination, with the outer wall and steps in section. Note the height where it crosses any passage. If the proposed installation depends on entry through a shared gate, name that dependency and ask the authorised manager to confirm the access arrangements.

### Applicant’s brief

An applicant can commission written surveying advice while the drawings are being assembled. Identify the instructing person or organisation and the interest it holds in the property. Include the proposed changes alongside the measured drawings, with the designer’s specification and relevant working details. The appointment defines the written comments we will provide on the material received.

Applicant enquiry

### Landlord’s review

A landlord’s authorised agent can ask us to review the drawings and identify matters needing clarification. A managing agent’s title alone does not establish the power to approve a change. HCS makes a conflict check before agreeing to review a proposal for one of the parties.

Landlord · Agent or board

### The legal questions behind the drawing

Absolute and qualified covenants call for different advice. The first prohibits the work in question. Under the second, the tenant may apply to the named party for consent. If improvements are permitted only with consent, the legal adviser can consider section 19(2) of the [Landlord and Tenant Act 1927](https://www.legislation.gov.uk/ukpga/Geo5/17-18/36/section/19). The statutory restriction on unreasonable withholding is tied to that type of covenant.

The [Landlord and Tenant Act 1988](https://www.legislation.gov.uk/ukpga/1988/26/section/1) can govern consent to an assignment or other specified tenancy transaction. When a qualifying request is served in writing, the person empowered to consent must issue a decision in writing within a reasonable time, stating conditions or the basis of refusal.

An alteration enquiry cannot bring that transaction duty into play. The decision on works belongs to the authorised party. HCS reviews technical material and leaves legal advice and drafting to the solicitor.

A planning reference in the file is evidence about that planning proposal. Check listed-building consent, Building Regulations approval and any applicable party wall procedure on their own terms alongside the lease application.

### Before work starts

Photographic schedules of condition are quoted separately, from £750 plus VAT (£900 including VAT). Ask each party to identify its costs, including any estate, landlord, legal or statutory charge. Ask for the basis under the relevant lease or appointment before budgeting for a charge.

If the surveyor can stand behind a lower window, a photograph looking out across the lightwell can identify a wall that the pavement view barely shows. Give the lower room and the external view different reference numbers. In each written caption, say whether the photographer was looking towards the road or towards the house. A tight photograph of patterned plaster or a standalone frame will otherwise be difficult for a reader to orient.

Where a changed staircase or joined room is relevant, mark the existing opening and the new work on separate drawing layers or clearly labelled plans. Ask which record explains the earlier alteration. A condition visit can record accessible finishes and marks in adjoining rooms, but it should not be described as verification of concealed supports. Retain any limitation on entry to the neighbouring unit with the observations it affects.

A lightwell immediately inside the pavement edge is easy to overlook in a lease plan drawn at street level. For a visit before an occupier fits a new sign or brings materials down to a lower floor, agree which vertical surfaces, railings, steps and landings are relevant. Where the lowermost landing can be seen only through bars, report that viewpoint and what portion was obscured. Do not treat a long-lens view as evidence for the underside of a slab or the back of a railing foot.

[Schedules of condition in Earl’s Court](/areas/earls-court-schedules-of-condition)

### The service from the half-basement

Allow from £700 plus VAT (£840 including VAT) for the surveying appointment. We act for one client only on the proposal and fix the fee with that client before instruction.

Show the inside fitting and the common or outside connection at their actual levels. State which of those records you can provide when requesting the quotation.

Look for the agreed drawing issue, the surveyor’s written deliverable and the reporting time in the quotation. A site visit, answers to comments and any re-submission review depend on its express wording. Agree access and decision dates with those who control them.

The drawing-stage fee does not automatically cover work in progress, completion review or subsequent monitoring. Specify and price any such stage, further proposal or additional review round.

[Costs guide](/insights/licence-to-alter-costs-in-london-leaseholder-guide)

### Separate appointments

If HCS is the landlord’s reviewing surveyor, it cannot act as contractor on the same proposal. Any related company undertaking design or works needs a separate appointment agreed by the client. [Conflicts policy](/about/conflicts-of-interest).

### Local evidence

- [Royal Borough of Kensington and Chelsea, Earl's Court Square Conservation Area Appraisal (adopted 6 June 2016)](https://planningconsult.rbkc.gov.uk/gf2.ti/f/708866/21143845.1/PDF/-/Earls_Court_Sq_CAA__low_res.pdf)
- [Royal Borough of Kensington and Chelsea, Philbeach Conservation Area Appraisal (October 2018)](https://planningconsult.rbkc.gov.uk/gf2.ti/f/968194/41801509.1/PDF/-/Philbeach_CAA__FINAL.pdf)
- [GOV.UK planning practice guidance, Tree Preservation Orders and trees in conservation areas](https://www.gov.uk/guidance/tree-preservation-orders-and-trees-in-conservation-areas)
### Further reading

- [Level 3 survey in Earl’s Court](/areas/earls-court-level-3-building-survey)
- [Party wall guidance](/areas/earls-court-party-wall)
- [Earl’s Court guide](/areas/earls-court)
- [London service](/services/licence-to-alter-surveyors-london)
- [Leaseholder guidance](/insights/licence-to-alter-guide-for-london-leaseholders)
Content updated: November 2026.

Where the instruction also needs architectural or structural design, [Hampstead Renovations](https://www.hampsteadrenovations.co.uk/licence-to-alter/) can be appointed separately. [How we manage conflicts of interest](/about/conflicts-of-interest).

## FAQs

**Does a pipe leaving the half-basement stay within the flat?**

Locate its route against the lease plan and the existing fabric. The party entitled to give permission may change beyond an outer wall or passage, a question for the legal adviser where unclear.

---

Sister company [Hampstead Renovations](https://www.hampsteadrenovations.co.uk/), renovation and refurbishment, London.

Hampstead Chartered Surveyors & Building Consultancy — RICS Regulated Firm No. 923064
020 7101 4590 · enquiries@hampsteadcharteredsurveyors.co.uk
Unit 3, Palace Court, 250 Finchley Road, London NW3 6DN

Source: https://www.hampsteadcharteredsurveyors.co.uk/areas/earls-court-licence-to-alter