# Section 20 major works consultancy in Earl’s Court

Agree how the repair to one sash opening will be assessed before quantities are extended down a stack of flats. Record which faces and occupied rooms were accessible.

Initial technical assessment from £1,800 including VAT (£1,500 professional fee plus £300 VAT at 20%). Later stages are quoted individually.

#### Terraces and mansion blocks around Earl’s Court Square

RBKC’s Earl’s Court Square appraisal records terraced and semi-detached houses alongside mansion blocks, with mid-to-late Victorian development. It describes brick, stucco and stone details and distinguishes residential streets from commercial Earl’s Court Road. These stock observations support a local brief without proving the condition of an individual façade.

For the instructed property, identify whether the existing layout is purpose-built or altered and obtain the available drawings. Mark common entrances, private external spaces and the components proposed for repair. Different residential forms should not inherit the same window or roof allowance merely because they are close together.

#### Set the boundary between common repairs and private alterations

An external works survey may encounter windows or fittings changed by individual occupiers. Record what is visible and ask for the relevant approvals and maintenance information. The project team needs to understand those interfaces without assuming that every alteration belongs in the landlord’s repair contract.

Where a resident proposes their own work at the same time, keep its design, permissions and appointment route distinct. A licence-to-alter process may need separate consideration. Any practical coordination should be documented so the common tender does not unintentionally promise private improvements.

#### Plan security and access while elevations are opened up

For operations affecting windows or doors, ask for a sequence that explains temporary closure and resident coordination. Identify access through flats as a specific task rather than a general entitlement. The managing agent can collect appointments while the contractor sets out its construction method.

If scaffolding changes the way residents reach or secure the building, discuss the proposed arrangements before pricing is final. Confirm who can authorise use of gardens, passages or neighbouring space. An apparently convenient route must not become an undocumented assumption behind the recommended offer.

#### Answer observations with a component-level explanation

Use photographs and drawing references to explain why a repair has been proposed for a particular bay or roof junction. Where residents favour a different treatment, record the technical merits and unresolved questions. The response should distinguish an inspected need from a preference for a more extensive scheme.

Tender analysis should identify exclusions for private components and any qualifications about occupied access. Obtain clarifications consistently so each offer addresses the agreed brief. Advice on consultation consequences and the allocation of expenditure remains with the landlord’s appropriately appointed advisers.

#### Specify the professional stages and preserve responsibility boundaries

A fee request should state how many flats require access, what records are available and whether the appointment includes tender and construction stages. Identify specialist investigations separately where needed. The service description should make the extent of attendance and contract duties clear without suggesting a guaranteed programme.

At completion, record the shared work by location and distinguish any independently instructed resident work. Retain photographs of concealed interfaces and the agreed maintenance information. The building file should show what the common contract delivered and what remained outside its scope.

### A sash reveal below a mansion-block window

When moisture appears at a reveal, record its position relative to the upper sash, sill and surrounding finish.

#### A lease line through a row of doors

At the pavement, include the full bay in a reference view before closing in on the junction of the shop window and the residential door. The pillar between openings may have a visible face in each entrance. A chip at the base on the shop side and flaking paint inside the other reveal belong to different entries. Name the face actually accessible and give the viewing date. Ask the managing agent whether the residential entrance can be opened for inspection. If permission extends only to the pavement, keep the inside of that entrance outside coverage.

### Whose questions can HCS answer?

The written appointment names our client. Typically that is a landlord, freeholder, resident management company, right to manage company or authorised agent. A service-charge contribution confers no separate appointment. Where one resident, a group or a residents’ association requests its own review, we agree a separate scope after checking interests. We cannot advise both sides or act against our existing landlord or managing-agent client on that matter.

### What residents can respond to

Whether any contributor exceeds £250 for qualifying works is assessed across the scheme, regardless of invoicing arrangements. For qualifying long-term agreements consider an individual leaseholder’s contribution above £100 in the accounting period. The first ordinary 30-day observation period concerns the notice of intention. The later 30-day period concerns the statement of estimates. Tender evaluation and mobilisation also need time. An application under section 20ZA does not secure dispensation until the First-tier Tribunal grants it.

[Section 20 of the Landlord and Tenant Act 1985](https://www.legislation.gov.uk/ukpga/1985/70/section/20) · [The 2003 consultation regulations for England](https://www.legislation.gov.uk/uksi/2003/1987/contents) · [Section 20ZA](https://www.legislation.gov.uk/ukpga/1985/70/section/20ZA)

### If you have received a notice

The landlord or agent takes responsibility for issuing notices, with its solicitor as necessary. Advice about enforceability, the lease or payment and tribunal proceedings is separate.

### Fees and scope of the appointment

Initial technical assessment

From £1,800 including VAT

£1,500 professional fee plus £300 VAT at 20%.

The starting fee applies to an initial technical assessment of a single residential building where the written quotation confirms it.

Document review and the agreed visit or desk-based assessment lead to written scope or technical recommendations. Specification and tendering attract a separate quotation. Contract administration is separately appointed and priced. Clarify which meetings, documents, revisions and visits are allowed for.

An appointment date or response time is only agreed once documents, access and deadlines have been checked. The professional fee is separate from construction costs, statutory thresholds and each lease share. Recovery depends on the lease and applicable rules.

### Independence

Before tender, HCS discloses and assesses group connections with prospective contractors. If we specify, tender or administer the scheme we will not bid to carry it out. [Conflicts of interest](/about/conflicts-of-interest).

### Local evidence

- [RBKC: Earl's Court Square Conservation Area Appraisal](https://planningconsult.rbkc.gov.uk/gf2.ti/f/708866/21143845.1/PDF/-/Earls_Court_Sq_CAA__low_res.pdf)
- [Royal Borough of Kensington and Chelsea, Philbeach Conservation Area Appraisal (October 2018)](https://planningconsult.rbkc.gov.uk/gf2.ti/f/968194/41801509.1/PDF/-/Philbeach_CAA__FINAL.pdf)
- [JBA Consulting for Kensington and Chelsea and Hammersmith and Fulham, Strategic Flood Risk Assessment, final report (June 2010)](https://web.archive.org/web/20240613173057id_/https://www.lbhf.gov.uk/sites/default/files/Strategic_Flood_Risk_Assessment_0.pdf)
Content updated: November 2026

### Discuss the building

Call 020 7101 4590

## Guide links

- [Local Level 3 building survey](/areas/earls-court-level-3-building-survey)
- [Contract administration](/areas/earls-court-contract-administration)
- [Licence to alter surveying](/areas/earls-court-licence-to-alter)
- [Party wall advice](/areas/earls-court-party-wall)
- [Building condition surveys](/areas/earls-court-condition-surveys)
- [Schedules of condition](/areas/earls-court-schedules-of-condition)
- [Planned maintenance surveys](/services/planned-maintenance-surveys-london)
- [London Section 20 and major works consultancy](/services/major-works-consultancy-for-residential-blocks)
- [All Section 20 locations](/services/major-works-consultancy-for-residential-blocks#s20-areas)
- [Surveying services](/areas/earls-court)
- [South Kensington](/areas/south-kensington-section-20-major-works)
- [West Kensington](/areas/west-kensington-section-20-major-works)
- [Kensington](/areas/kensington-section-20-major-works)
- [Chelsea](/areas/chelsea-section-20-major-works)
- [Section 20 contribution checker](/tools/section-20-consultation-checker)
- [Section 20 timeline planner](/tools/section-20-timeline-planner)
- [Received a Section 20 notice? A leaseholder checklist](/insights/received-section-20-notice-leaseholder-checklist)
- [Council major works bills: what an independent surveyor can review](/insights/council-leaseholders-major-works-independent-review)
- [A major works decision guide for RMC and RTM directors](/insights/major-works-guide-for-rmc-and-rtm-directors)
- [Understanding Section 20 consultation for major works](/insights/understanding-section-20-consultation-for-major-works)

## FAQs

**Is opening the sash enough to inspect the whole surround?**

It may reveal the frame but leave the outer head concealed. Define the closer access needed and the allowance for work if damage extends behind the finish.

**Can private alterations be added to the block repair contract informally?**

They need an explicit decision about scope, approvals, responsibility and appointment arrangements. Keep private work distinguishable from the common package and obtain the relevant advice. Practical coordination alone should not be treated as agreement to pay for or administer an occupier’s alteration.

---

Sister company [Hampstead Renovations](https://www.hampsteadrenovations.co.uk/), renovation and refurbishment, London.

Hampstead Chartered Surveyors & Building Consultancy — RICS Regulated Firm No. 923064
020 7101 4590 · enquiries@hampsteadcharteredsurveyors.co.uk
Unit 3, Palace Court, 250 Finchley Road, London NW3 6DN

Source: https://www.hampsteadcharteredsurveyors.co.uk/areas/earls-court-section-20-major-works