<!-- source-hash: 043a71d595073d219b35c816fb91980bf7d0de47eb412d95e6ced5e8be1a1098 -->
# Party Wall Surveyor in Fortis Green: Agreements, Notices and Awards

For Fortis Green roof and chimney work, distinguish a main-road mansion block from a side-street semi and trace the retained masonry through both homes.

Party Wall Notices from £195 plus VAT per notice · Schedules of Condition & Party Wall Awards

### The stack above a Twyford Avenue roof

North of the main frontage, the appraisal says development is of a smaller, more domestic scale. On Twyford Avenue it describes a group of substantial two storey semi-detached and detached houses built by Billy Collins, with steeply sloping hipped red tiled roofs, tall chimneys, deep overhanging eaves and small dormers, and dark red brick with tile hanging to bay windows and gables. Ask when the roof and tile hanging were last repaired, whether the loft has been converted, and for drawings of any rear or side extension.

Start with the piece of masonry the builder wants to remove. On an elevation or section, follow it upwards from the room to the attic and the stack. Draw the equivalent part on the adjoining side if reliable records exist. A breast removed in a bedroom can leave a substantial load above the ceiling. Ask the engineer to show the permanent support and the sequence for installing it. The fact that the alteration would be invisible from the street says little about its effect on the adjoining structure.

Section 2 of the Party Wall etc. Act 1996 sets out rights for specified work to a party structure. Where relevant, the party structure notice is served under section 3. Identify whether the proposal involves cutting into the shared wall, changing its height or disturbing a shared chimney. If earlier alterations took place in the adjoining home, invite that owner to share drawings or photographs. Use the information to identify a question for the engineer, and confirm the arrangement before the builder relies on it.

### The survey boundary in a mansion block

Haringey’s Muswell Hill appraisal treats part of the Fortis Green frontage as a defined sub-area. It records substantial flats on the main road alongside a smaller scale of development in the side streets.

The 2008 appraisal describes substantial three- and four-storey blocks with red brick, prominent chimneys and mansard roofs. It records Birchwood Mansions as a 1907 block.

For a top-floor alteration, show where the flat ends and common roof space begins on the lease plan. Mark the stack or wall by its location in the block and the stair that serves the relevant flat. Ask management who can provide roof access and which owners hold interests in the affected parts. A household's willingness to open its attic hatch does not itself authorise work to the whole roof. Keep access arrangements separate from the question of statutory service.

Before a site visit, agree how to identify each slope. A photo of tile hanging on the side gable may be hard to distinguish later from one on the front projection. Show the full gable and a feature such as a window before adding close views of existing cracks, joints or repairs. If the stack can only be observed from ground level, record that viewpoint. A condition schedule should describe the extent and limits of the inspection rather than imply that a chimney was examined from the roof.

### Work at the edge of an adjoining plot

A project to add a side room needs the existing wall position as well as a proposed elevation. Section 1 can be relevant to a new wall at the dividing line. Put both boundaries of a narrow passage onto the plan and mark the proposed masonry thickness. If the works include foundation trenches, take a separate section through the point where the dig comes closest to the neighbouring building. Distances and levels together determine how section 6 applies.

Haringey’s 2017 development management document sets out basement design considerations, including effects on nearby structures and infrastructure. Include any site-specific basement impact assessment with the foundation drawings.

A council planning assessment and a party wall instruction may refer to some of the same engineering drawings. They answer different questions. Keep the planning decision, building control documents, any lease permission and the notice or award indexed separately. If the engineer changes the excavation sequence after a planning decision, notify the appointed surveyor and make sure the contractor has the drawing issue actually reviewed.

### Which conservation record belongs in the file?

Haringey identifies Fortis Green Conservation Area separately from the adjoining Muswell Hill area. Its 2008 Muswell Hill appraisal covers the named main-road sub-area. Verify the exact site on the council map.

Use the current address and the site boundary when asking the council for decisions. Where a listed building or a conservation designation affects the project, have the relevant adviser identify the permissions required for the actual intervention. A neighbourhood appraisal is valuable for locating building groups and for understanding a roofscape. It cannot establish either ownership of a stack or the right to alter the supporting wall in a particular flat.

### An adjoining owner looking at a chimney proposal

Supply the notice, the date it came and any drawing you hold showing a chimney removed on your side. Our [advice for adjoining owners](/services/party-wall-surveyor-for-adjoining-owners) covers replying to the notice and arranging an appropriate condition record. If rooms below the proposed cut have decorated ceilings or are occupied by a different leaseholder, explain how they can be identified and who can arrange access to them.

### Fortis Green party wall questions

Local evidence

- [Haringey Council, List of conservation areas in Haringey](https://haringey.gov.uk/planning-building-control/planning/planning-policy/design-conservation/conservation-areas/conservation-areas-haringey/list-conservation-areas-haringey)
- [Haringey Council, Muswell Hill Conservation Area Character Appraisal, adopted February 2008 (Sub Area 2)](https://haringey.gov.uk/sites/default/files/muswell_hill_character_appraisal-2_0.pdf)
- [Haringey Council, Development Management DPD, adopted July 2017 (Policy DM18, Residential basement development and light wells)](https://haringey.gov.uk/sites/default/files/final_haringey_dmp_dtp_online.pdf)
- [Party Wall etc. Act 1996](https://www.legislation.gov.uk/ukpga/1996/40/contents)
- [GOV.UK guidance on party walls and building work](https://www.gov.uk/party-walls-building-works)
Content updated: November 2026.

### Other Fortis Green surveying services

- [Level 3 Building Survey](/areas/fortis-green-level-3-building-survey)
- [Schedules of Condition](/areas/fortis-green-schedules-of-condition)
- [Measured Surveys and Lease Plans](/areas/fortis-green-measured-surveys-lease-plans)
- [Licence to Alter](/areas/fortis-green-licence-to-alter)
- [Building Defect Investigations](/areas/fortis-green-building-pathology)
- [Building Condition Surveys](/areas/fortis-green-condition-surveys)
- [Section 20 Major Works](/areas/fortis-green-section-20-major-works)
- [RICS Home Surveys](/areas/fortis-green-home-surveys)
- [Snagging Surveys](/areas/fortis-green-snagging-surveys)
[Party wall surveying service](/services/party-wall-matters) · [Haringey area guide](/areas/haringey)

### Need party wall matters in Fortis Green? Call 020 7101 4590.

If notices lead on to building work, [Hampstead Renovations](https://www.hampsteadrenovations.co.uk/party-wall-refurbishment-london/), our sister company, can quote for it, never as a condition of our advice. [How we manage conflicts of interest](/about/conflicts-of-interest).

---

Hampstead Chartered Surveyors & Building Consultancy — RICS Regulated Firm No. 923064
020 7101 4590 · enquiries@hampsteadcharteredsurveyors.co.uk
Unit 3, Palace Court, 250 Finchley Road, London NW3 6DN

Source: https://www.hampsteadcharteredsurveyors.co.uk/areas/fortis-green-party-wall
