# Party Wall Surveyor in Gidea Park: Agreements, Notices and Awards

Flat-roofed exhibition houses on Eastern Avenue pose a different party wall question from a cottage on Meadway or a flat above a Gidea Park parade.

Party Wall Notices from £195 plus VAT per notice · Schedules of Condition & Party Wall Awards

### An alteration between flat roofs

Havering's Gidea Park Conservation Area Appraisal and Management Plan, prepared by Purcell and dated July 2025, was adopted after the council's Cabinet agreed it on 17 September 2025. It records that the areas covering the 1911 Romford Garden Suburb Exhibition and the 1934 Modern Homes Exhibition were adopted as the conservation area in 1970.

The plan describes the 1934 exhibition houses in Brook Road as rising two storeys beneath flat roofs in render, brick or painted brick, and those on Eastern Avenue as semi-detached pairs, also under flat roofs, whose original metal windows have nearly all been replaced. The Francis Skinner and Tecton house of 1933-4 on Heath Drive, built in reinforced concrete, is listed at Grade II.

Ask whether extensions have introduced separate roof areas or junctions that cannot be seen from the road. A simple front elevation can conceal several phases of work behind it. The survey should set out the views obtained and any further information needed about inaccessible areas; the architectural date is not evidence of the age or condition of the present covering.

For work between the semi-detached pairs, establish where the proposed roof alteration stops. Will the contractor cut a flashing into the shared upstand, raise the dividing wall or carry a separate roof on a new structure? Ask for an enlarged junction detail showing both roof surfaces, how water will drain while the joint is open and how it will shed water on completion. Relevant operations to a party structure under section 2 of the Party Wall etc. Act 1996 are notified under section 3. A plan labelled “renew flat roof” cannot settle that question on its own.

The reinforced-concrete house identified on Heath Drive is a specific example. A similar silhouette on the adjoining street does not establish the same method of construction. When the proposed fixings depend on concealed material, ask the designer which records, drawings or observations support the detail and what check is needed before the first fixing is made. Record a change of detail clearly if it changes the interaction with an adjoining owner.

### Exhibition cottages and rear extensions

In the northern character area, the plan says the 1910-11 houses were largely designed either as large detached Class I houses, mostly along Heath Drive, Reed Pond Walk and Parkway, or as more modest Class II cottages, principally in Meadway and Risebridge Road. It describes painted render and handmade brick, and roofs predominantly in clay tiles that often feature dormers.

Consider the rear wall and footing separately from the treatment of the roof. A new wall on the line of junction requires the section 1 position to be considered. If work is entirely within one garden, excavation near the neighbour's cottage can still require assessment under section 6. Show the distances and levels at the closest rear addition. If a foundation trench returns around a projecting feature, provide a section there as well as through the middle of the proposed extension. Avoid relying on an exhibition plan to identify a footing rebuilt decades later.

### An inspection at the junction of roof and parapet

Locate roof terraces, external stairs and enclosed additions on the plan, and establish the available access to each. If finishes obscure the structure, keep that uncertainty explicit. A condition inspection of accessible parts cannot certify the construction of hidden components from style alone.

A pre-works schedule can distinguish a repair to the upper face of a parapet from a stain on the plaster immediately below. Photograph each with a location on the roof or room plan and retain a wider view showing the junction. If the owner has photographs before a recent re-covering, label them with their origin and date. They help describe earlier work but are separate from visible condition on the inspection day. Ask who can open the hatch and any rooms giving a safe view of the adjoining roof.

### Where the neighbouring property is over a shop

The June 2025 draft identifies interwar shops with flats or offices above near Balgores Lane and Crossways, and an earlier mixed-use range on Hare Hall Lane with upper flats. These buildings present different access and ownership questions from a detached exhibition house. The parade’s appearance does not define the extent of an individual flat.

Take the address of the particular flat and a floor plan for its entrance, rear rooms and relevant common parts. The party wall surveyor needs to distinguish the person able to unlock the space from the owner entitled to respond to statutory notices. Agree which areas can be recorded before works and state any exclusions. A user of the commercial premises below may offer access to a yard without being able to grant access to the roof.

Keep Havering’s conservation and planning records for the particular address with any separate building control material and private consent. An accessible council elevation records external appearance and may omit the revised support or temporary roof detail used on site. Check that any award refers to the appropriate construction issue and that a site change is communicated before it takes effect.

### An adjoining owner’s roof evidence

If the new work approaches your roof joint, send the notice and provide the position of any previous leak or recover. A dated photograph from a past repair may help identify a hidden junction. See our [adjoining-owner advice on party wall notices](/services/party-wall-surveyor-for-adjoining-owners) for reply and appointment options. Tell the surveyor which roof area can be seen safely and who can arrange entry.

### Gidea Park party wall questions

Local evidence

- [London Borough of Havering and Purcell, Gidea Park Conservation Area Appraisal and Management Plan, July 2025](https://www.havering.gov.uk/downloads/file/7386/gidea-park-conservation-area-appraisal-and-management-plan)
- [London Borough of Havering, Conservation Area Appraisals consultation and adoption update, September 2025](https://consultation.havering.gov.uk/planning/conservation-area-appraisals/)
- [Havering: Gidea Park Conservation Area draft appraisal, June 2025](https://consultation.havering.gov.uk/planning/conservation-area-appraisals/supporting_documents/GideaPark_CAAMP_DRAFT_05June2025.pdf#page=41)
- [Historic England: 64 Heath Drive, list entry 1257402 (archived copy)](https://web.archive.org/web/20260111185626id_/https://historicengland.org.uk/listing/the-list/list-entry/1257402)
- [Party Wall etc. Act 1996](https://www.legislation.gov.uk/ukpga/1996/40/contents)
- [GOV.UK guidance on party walls and building work](https://www.gov.uk/party-walls-building-works)
Content updated: November 2026.

### Other Gidea Park surveying services

- [Level 3 Building Survey](/areas/gidea-park-level-3-building-survey)
- [Schedules of Condition](/areas/gidea-park-schedules-of-condition)
- [Measured Surveys and Lease Plans](/areas/gidea-park-measured-surveys-lease-plans)
- [Licence to Alter](/areas/gidea-park-licence-to-alter)
- [Building Defect Investigations](/areas/gidea-park-building-pathology)
- [Building Condition Surveys](/areas/gidea-park-condition-surveys)
- [Section 20 Major Works](/areas/gidea-park-section-20-major-works)
- [Contract Administration](/areas/gidea-park-contract-administration)
- [RICS Home Surveys](/areas/gidea-park-home-surveys)
- [Snagging Surveys](/areas/gidea-park-snagging-surveys)
[Party wall surveying service](/services/party-wall-matters) · [Gidea Park area guide](/areas/gidea-park)

### Need party wall matters in Gidea Park? Call 020 7101 4590.

If notices lead on to building work, [Hampstead Renovations](https://www.hampsteadrenovations.co.uk/party-wall-refurbishment-london/), our sister company, can quote for it, never as a condition of our advice. [How we manage conflicts of interest](/about/conflicts-of-interest).

---

Hampstead Chartered Surveyors & Building Consultancy — RICS Regulated Firm No. 923064
020 7101 4590 · enquiries@hampsteadcharteredsurveyors.co.uk
Unit 3, Palace Court, 250 Finchley Road, London NW3 6DN

Source: https://www.hampsteadcharteredsurveyors.co.uk/areas/gidea-park-party-wall