<!-- source-hash: 1494455045ec4b5f2aaa07d0a74b11b9a6467635076d914c533c396831ed22af -->
# Party Wall Surveyor in Haslemere, Surrey: Agreements, Notices and Awards

In Haslemere, trace proposed dormer or chimney work through adjoining roof rooms and check the access available through a passage off the High Street.

Party Wall Notices from £195 plus VAT per notice · Schedules of Condition & Party Wall Awards

### Roof rooms in the Shepherds Hill cottages

The appraisal records late 17th and 18th-century terraced cottages on Shepherds Hill in a vernacular of brick and stonework below and hanging tiles above, often with semi-circular or pointed ends. Petworth Road and Lower Street are mainly terraces, High Street buildings are often separated by passageways, and dormers on many buildings provide rooms in the roof space. Over 50 buildings survive from before the 18th century, some of them partly concealed by later building.

For an alteration to a cottage dormer, ask where the opening, the supporting timber and the adjoining roof meet. Mark both roof slopes on the design section. A dormer supported within one roof can involve different work from raising a wall between houses or cutting into its masonry for a new beam. Check the operations under section 2 of the Party Wall etc. Act 1996 and the party structure notice procedure in section 3. The roofline shown in the conservation appraisal cannot answer how this dormer is supported.

Dormers providing accommodation in the roof space are among the Haslemere appraisal’s architectural details.

Explain any fixed linings, stored contents or access restriction already known.

A first inspection may reach a furnished roof room while eaves and the upper section of a shared wall remain behind linings. For a schedule of condition, record the room entrance, angle of the ceiling and nearest window before close views of any existing mark. If records show that the adjoining dwelling also has a dormer or altered chimney, identify the relevant room on that side, subject to access. State exactly what could be seen and whether material supplied from an earlier project shows more of the junction.

### Choosing an inspection route off the High Street

Accesses and passageways between High Street buildings are described in the appraisal’s frontage analysis. Its presence on a townscape plan does not establish that the surveyor can enter the rear space through it.

State the access already agreed and the person responsible for unresolved arrangements.

To plan a rear extension, show the whole passage, the gate opening and the rear projections to either side. Separate an agreed inspection route from any need to bring equipment or building materials through it. For section 1, locate the proposed new wall against the line of junction. A wall built up to the legal boundary raises different questions from one intended to stand astride it. Check the available title and measured information before treating the passage's visible edge as that boundary.

Section 6 requires the proposed excavation to be assessed in relation to the adjacent building or structure. Give the depth and position of any trench, the available levels for the adjoining foundation and the shortest separation. If the dig turns around the end of the kitchen, the critical point might be a back corner that cannot be seen from the street. Include a section through that corner and identify any remaining uncertainty for the engineer.

### Locate the component in repair records

The Shepherds Hill cottage description records brick-and-stone lower walls with hanging tiles on the upper parts. A record for the upper covering does not establish that the masonry below was repaired at the same time.

Keep a reported patch repair distinct from a wider replacement.

For a neighbour's pre-works photographs, start the sequence with both sides of the junction in view where that is possible. Then identify each close view with the wall face and height. If tile hanging stops above a past stone repair, distinguish the visible change of finish from the reason for the original repair. A brief written account from an occupier can be added with its date without treating it as an observation made by the surveyor.

According to the appraisal, the railway reached Haslemere in 1859 and the main period of development came in the late 19th and early 20th centuries. Edwardian low-density houses rose on the hills around the centre while small cottages were built in Bridge Road, and the upper parts of Museum Hill and Shepherds Hill gained large houses with fine views.

The town contains buildings of different sizes and histories within a relatively short distance. Match any planning decision, listed building consent and building control records to the site and works being considered. Waverley Borough Council adopted the town-centre appraisal in 2014. An appraisal describes local character, while a party wall award deals with the relevant work between owners. Keep any landlord's permission with the private property documents and check a revision to the notified work before the contractor acts on it.

### If the dormer or opening is next to your rooms

Send the notice and the drawings you received, together with the delivery date. Identify the room under the relevant roof slope or beside the proposed opening and any earlier change on your side. Our [guidance for adjoining owners](/services/party-wall-surveyor-for-adjoining-owners) explains how to respond. If the proposed access is via a passage controlled by someone else, supply the practical information you hold about arranging the visit.

### Haslemere, Surrey party wall questions

Local evidence

- [Waverley Borough Council: Haslemere Town Centre Conservation Area Appraisal (adopted October 2014)](https://www.waverley.gov.uk/Portals/0/Documents/services/planning-and-building/heritage-and-trees/Heritage/Haslemere%20Town%20Centre%20Conservation%20Area%20Appraisal.pdf?ver=-aBicPeNkPjJTUMQe0cUlw%3d%3d)
- [Waverley Borough Council: Conservation Areas](https://www.waverley.gov.uk/services/planning-and-building/heritage-trees-and-design/conservation-areas)
- [Haslemere Town Centre Conservation Area Appraisal, adopted October 2014](https://www.waverley.gov.uk/Portals/0/Documents/services/planning-and-building/heritage-and-trees/Heritage/Haslemere%20Town%20Centre%20Conservation%20Area%20Appraisal.pdf?ver=-aBicPeNkPjJTUMQe0cUlw%3d%3d#page=6)
- [Party Wall etc. Act 1996](https://www.legislation.gov.uk/ukpga/1996/40/contents)
- [GOV.UK guidance on party walls and building work](https://www.gov.uk/party-walls-building-works)
Content updated: November 2026.

### Other Haslemere, Surrey surveying services

- [Level 3 Building Survey](/areas/haslemere-level-3-building-survey)
- [Schedules of Condition](/areas/haslemere-schedules-of-condition)
- [Measured Surveys and Lease Plans](/areas/haslemere-measured-surveys-lease-plans)
- [Licence to Alter](/areas/haslemere-licence-to-alter)
- [Building Defect Investigations](/areas/haslemere-building-pathology)
- [Building Condition Surveys](/areas/haslemere-condition-surveys)
- [Section 20 Major Works](/areas/haslemere-section-20-major-works)
- [RICS Home Surveys](/areas/haslemere-home-surveys)
- [Snagging Surveys](/areas/haslemere-snagging-surveys)
[Party wall surveying service](/services/party-wall-matters) · [Haslemere, Surrey area guide](/areas/haslemere)

### Need party wall matters in Haslemere, Surrey? Call 020 7101 4590.

If notices lead on to building work, [Hampstead Renovations](https://www.hampsteadrenovations.co.uk/party-wall-refurbishment-london/), our sister company, can quote for it, never as a condition of our advice. [How we manage conflicts of interest](/about/conflicts-of-interest).

---

Hampstead Chartered Surveyors & Building Consultancy — RICS Regulated Firm No. 923064
020 7101 4590 · enquiries@hampsteadcharteredsurveyors.co.uk
Unit 3, Palace Court, 250 Finchley Road, London NW3 6DN

Source: https://www.hampsteadcharteredsurveyors.co.uk/areas/haslemere-party-wall
