<!-- source-hash: 42f957527d5fd49f5b6c4c006f606384e7bef0528bfe887f2a6e37116ddee820 -->
# Party Wall Surveyor in Hemel Hempstead: Agreements, Notices and Awards

For Hemel Hempstead work, distinguish the older rear wing, New Town estate house and Apsley flat before identifying the owner or structure affected.

Party Wall Notices from £195 plus VAT per notice · Schedules of Condition & Party Wall Awards

### A single Old Town address can contain two periods of construction

The National Heritage List entry for 99 High Street records an eighteenth-century red-brick front with a parapet and an earlier timber-framed back wing. That single building illustrates why the outward date of a frontage cannot safely be applied to an entire Old Town property. It is not evidence that other High Street houses contain the same frame.

Can the roof spaces be entered safely, and are changes in floor level or wall thickness explained in existing records? If a room has recently been lined or refurbished, identify the work and ask what was exposed at the time. The inspection should distinguish visible evidence from information supplied about concealed construction.

When an owner wants to widen the junction between the front rooms and a rear wing, find the actual supporting wall on the current plan. A structural drawing should trace the load to each proposed bearing. If the wall is a party structure, the surveyor checks the precise operation under section 2 of the Party Wall etc. Act 1996 and the section 3 notice procedure. A drawing with a label for each building period helps distinguish the cut being proposed from fabric that the engineer intends to retain.

For a condition record, label the rooms by reference to the street and rear wing. Identify any earlier patch or irregularity on a fixed wall or ceiling, taking a general photograph before the detail. Note if the neighbouring owner has photographs of the junction while it was open. Keep their description and date alongside the new visible record so a reader can tell which evidence predates the project.

### Draw the actual New Town house and its later addition

The 2023 study dates the first neighbourhoods from Adeyfield, the largest and the first completed in 1950, through Bennetts End, Chaulden and Warners End to Highfield in 1959, with Gadebridge expanded in 1958. It says a variety of architectural designs and construction materials was used for the new houses and flats, and an eighth neighbourhood was constructed at Woodhall Farm in 1974.

For an older Boxmoor house, identify any altered chimney, rear addition or converted roof. For a later estate house, ask for the original construction information if available and a record of subsequent changes. A familiar-looking brick exterior does not answer every question about what lies behind it.

The 2023 study was commissioned by Dacorum Borough Council. It gives a history of neighbourhood development, while the structural detail for a side extension must come from the building in question. If a neighbour has a former garage used as a habitable room now, put its footprint and relationship to the excavation on the section. Section 6 depends on statutory distances and excavation levels compared with the neighbouring building or structure. Identify how a foundation depth has been established and mark the deepest part of the dig.

If the owner proposes a boundary wall, set out its relation to the line of junction for section 1. A uniform estate frontage cannot determine the legal line between two particular plots. Mark the existing dividing fence or masonry separately and describe its proposed treatment. A job can require both assessment of the wall position and separate excavation notices.

### Identify the apartment at Apsley

The county plan records residential redevelopment of the former Dickinsons factory site beside the canal at Apsley. That is historical development context, not a statement that every Apsley flat is a factory conversion or that its shared structure has been inspected. Establish the exact building and whether the flat is in retained fabric or a later building before settling the brief.

Ask for the lease plan, available conversion drawings and management records. Which roofs and external walls serve the flat, and who can give access to communal spaces?

In a block, a separating floor can matter as much as a wall. Locate the relevant room, occupied part above or below, and any communal passage needed for inspection. A proposed bearing, floor alteration or cut at this level should be assessed using the actual block drawings. If management can open a service cupboard, establish separately whether the owner entitled to the neighbouring flat has agreed access to the rooms being recorded.

Keep the current planning permission and building control documents with their drawing schedules. Any applicable lease permission also has its own scope. A party wall award is one part of the project record and cannot establish an unrelated permission. If the engineer changes the method of support on finding older fabric, tell the surveyor and keep the superseded and replacement details clearly identifiable.

### When a neighbour receives the papers

If the notice names the block or estate but the drawing stops short of your home, send the surveyor a marked plan, service date and any enclosure you received. Our [adjoining owners' service](/services/party-wall-surveyor-for-adjoining-owners) explains the options when responding. Tell the surveyor which stair, side door or access arrangement applies to the affected part and whether you hold earlier drawings of the division.

### Hemel Hempstead party wall questions

Local evidence

- [Hemel Garden Communities, Hemel Hempstead New Town Historic Context Study (CBA for Dacorum Borough Council, May 2023)](https://www.stalbans.gov.uk/sites/default/files/attachments/Planning%20Policy/HGC/HGC%2006.02%20-%20Hemel%20Hempstead%20Historic%20Study%20Report%20(2023).pdf)
- [Hertfordshire County Council, Hemel Hempstead Urban Transport Plan (January 2009), paragraphs 3.11 to 3.18](https://www.hertfordshire.gov.uk/media-library/documents/highways/urban-transport-plans/hemel-hempstead/hemel-hempstead-urban-transport-plan.pdf)
- [Historic England: 99 High Street, list entry 1078094 (archived copy)](https://web.archive.org/web/20260216070458id_/https://historicengland.org.uk/listing/the-list/list-entry/1078094)
- [Hemel Hempstead Urban Transport Plan, paragraphs 3.11–3.14 and 3.18, printed pages 17–18 (PDF 24–25); historical neighbourhood descriptions only](https://www.hertfordshire.gov.uk/media-library/documents/highways/urban-transport-plans/hemel-hempstead/hemel-hempstead-urban-transport-plan.pdf#page=24)
- [Party Wall etc. Act 1996](https://www.legislation.gov.uk/ukpga/1996/40/contents)
- [GOV.UK guidance on party walls and building work](https://www.gov.uk/party-walls-building-works)
Content updated: November 2026.

### Other Hemel Hempstead surveying services

- [Level 3 Building Survey](/areas/hemel-hempstead-level-3-building-survey)
- [Schedules of Condition](/areas/hemel-hempstead-schedules-of-condition)
- [Measured Surveys and Lease Plans](/areas/hemel-hempstead-measured-surveys-lease-plans)
- [Licence to Alter](/areas/hemel-hempstead-licence-to-alter)
- [Building Defect Investigations](/areas/hemel-hempstead-building-pathology)
- [Building Condition Surveys](/areas/hemel-hempstead-condition-surveys)
- [Section 20 Major Works](/areas/hemel-hempstead-section-20-major-works)
- [Contract Administration](/areas/hemel-hempstead-contract-administration)
- [RICS Home Surveys](/areas/hemel-hempstead-home-surveys)
- [Snagging Surveys](/areas/hemel-hempstead-snagging-surveys)
[Party wall surveying service](/services/party-wall-matters) · [Hemel Hempstead area guide](/areas/hemel-hempstead)

### Need party wall matters in Hemel Hempstead? Call 020 7101 4590.

If notices lead on to building work, [Hampstead Renovations](https://www.hampsteadrenovations.co.uk/party-wall-refurbishment-london/), our sister company, can quote for it, never as a condition of our advice. [How we manage conflicts of interest](/about/conflicts-of-interest).

---

Hampstead Chartered Surveyors & Building Consultancy — RICS Regulated Firm No. 923064
020 7101 4590 · enquiries@hampsteadcharteredsurveyors.co.uk
Unit 3, Palace Court, 250 Finchley Road, London NW3 6DN

Source: https://www.hampsteadcharteredsurveyors.co.uk/areas/hemel-hempstead-party-wall
