<!-- source-hash: 31801c2ca2f64543575b28ef6a1e13205adec5a1c5de8afe4a9879cbd6501be7 -->
# Party Wall Surveyor in Manor Park: Agreements, Notices and Awards

A continuous eaves line near Durham Road can hide very different rear extensions. Locate each footing, cut and roof junction on the Manor Park notice plan.

Party Wall Notices from £195 plus VAT per notice · Schedules of Condition & Party Wall Awards

### Follow the eaves around the return

Newham designated the Durham Road Conservation Area in 1984, and the 2024 study places it next to Manor Park station. The appraisal the council approved in December 2006 calls the estate a speculative suburb laid out by Cameron Corbett in the 1880s, of two-storey terraced houses sharing a common eaves and building line; a single canted ground-floor bay is the most common form, though some earlier terraces are flat fronted. All the houses are of brick, with Welsh slate as the original roof covering, and the bay roofs are either flat with a parapet and asphalt or hipped in slate. Ask when the main roof and the bay roofs were last re-covered, and whether a bay has been rebuilt.

For a rear dormer, the first Party Wall etc. Act 1996 question is what will happen at the dividing masonry. Does the builder intend to raise it, cut pockets for beams or fix a new flashing into it? Section 2 covers specified work to a party structure, with a party structure notice under section 3. Identify each cut and how the neighbouring roof is protected while it is exposed. A front elevation showing a continuous line of houses is unlikely to explain these operations at the rear.

Identify where the former outside wall stood, which roof covers the added rooms and how the new layout connects to the stairs and any cellar. This is a way to prepare the inspection, not a suggestion that those alterations exist at every house in the area.

Ask for access to the garden, side passage if present and any remaining roof void. If a leak or crack prompted earlier repairs, supply the history rather than only a photograph of the completed finish.

Ask the engineer to locate each beam and the wall or post that carries its other end. Some room alterations shorten an unsupported span by using a new post, and a post may itself need new foundations. The footing drawing can therefore be as relevant to a loft or opening enquiry as the steel schedule. If the design later uses the party wall instead of a post, send the revised detail back to the surveyor.

### Drawing the extension closest to the excavation

For a new wall at the junction of two gardens, section 1 requires consideration separate from section 6 excavation. Show the intended wall and foundation in relation to the boundary, then show each excavation and its distance and depth relative to the nearest adjoining structure. A deep drain run can lie closer to the neighbour's return than the foundations around the main extension. If there is a cellar, state whose it is, its extent and how its floor and footings were identified. A level for the cellar floor is not a foundation measurement.

Newham’s character studies cover a wider neighbourhood than the Durham Road estate. Tell the surveyor whether the adjoining building is a terrace, a later infill or part of an apartment block. The same depth of excavation can raise different questions when the neighbour’s closest structure changes. A proposed section should identify what is there now rather than projecting an original house outline past a later addition.

### When one side opens from a shop

The 2024 study describes Romford Road as a continuous string of shops and food and drink outlets forming a high street, and pictures historic terraced housing with a ground-floor convenience store on Church Road. Where a flat sits over a shop, check in the lease who maintains the roof, rear wall and shared entrance.

Who can provide access to the rear, and are there roof areas outside the flat’s direct control? Obtain management correspondence relating to visible concerns and distinguish reports about the building from reports about the flat alone.

For a change below accommodation, the relevant party structure can include a floor between separate owners. Give the location of the flat and its staircase as well as the shopfront. Mark the rooms above the proposed support, identify the parties who hold the relevant interests, and ask who can arrange any pre-works inspection. A visit to the retail space alone will not record the plasterwork or floor inside the adjoining dwelling.

### Connecting a photograph to the correct roof

For a schedule of condition of the bay and main roofs, label each by the room and elevation below it and identify the viewpoint. Take a wider picture first, then photograph the visible parapet, slate or flashing at issue and record any existing repairs. Keep earlier photographs of a bay replacement with their original date. An upper window may offer a view down to the roof while preventing examination of the junction facing away. Make that limitation explicit.

Check the exact address on Newham’s planning register and current conservation maps. A decision on a proposed change to a bay or roof, building control and any consent under a lease are separate from an award under the Act. Ask the designer to distinguish an illustration of the street from the issue on which the contractor will rely. Preserve earlier revisions if they describe work already notified to the neighbour.

### If the works are beside your Manor Park home

Mark your actual rear return or access to the upstairs flat on a copy and keep the original documents and date of delivery. Our [adjoining-owner guidance on notices](/services/party-wall-surveyor-for-adjoining-owners) explains response and appointment choices. If an inspection needs to happen before a shop opens or when an upper room can be accessed, give the surveyor that information in good time.

### Manor Park party wall questions

Local evidence

- [London Borough of Newham, Newham Characterisation Study 2024, chapter 8, neighbourhood 16 (Manor Park and Little Ilford)](https://www.newham.gov.uk/downloads/file/9437/eb018-newham-characterisation-study-ch08-vision-neighbourhood-principles-2024-part-3-)
- [London Borough of Newham, Newham Character Study (December 2017)](https://www.newham.gov.uk/downloads/file/899/newhamcharacterstudy2018)
- [London Borough of Newham, Durham Road Conservation Area Character Appraisal and Management Proposals (approved December 2006)](https://www.newham.gov.uk/downloads/file/13/durham-road-conservation-area-appraisal-and-management-plan)
- [Newham Characterisation Study 2024, Chapter 8: Vision and neighbourhood principles, part 3](https://www.newham.gov.uk/downloads/file/9437/eb018-newham-characterisation-study-ch08-vision-neighbourhood-principles-2024-part-3-#page=23)
- [Party Wall etc. Act 1996](https://www.legislation.gov.uk/ukpga/1996/40/contents)
- [GOV.UK guidance on party walls and building work](https://www.gov.uk/party-walls-building-works)
Content updated: November 2026.

### Other Manor Park surveying services

- [Level 3 Building Survey](/areas/manor-park-level-3-building-survey)
- [Schedules of Condition](/areas/manor-park-schedules-of-condition)
- [Measured Surveys and Lease Plans](/areas/manor-park-measured-surveys-lease-plans)
- [Licence to Alter](/areas/manor-park-licence-to-alter)
- [Building Defect Investigations](/areas/manor-park-building-pathology)
- [Building Condition Surveys](/areas/manor-park-condition-surveys)
- [Section 20 Major Works](/areas/manor-park-section-20-major-works)
- [Contract Administration](/areas/manor-park-contract-administration)
- [RICS Home Surveys](/areas/manor-park-home-surveys)
- [Snagging Surveys](/areas/manor-park-snagging-surveys)
[Party wall surveying service](/services/party-wall-matters) · [Manor Park area guide](/areas/manor-park)

### Need party wall matters in Manor Park? Call 020 7101 4590.

If notices lead on to building work, [Hampstead Renovations](https://www.hampsteadrenovations.co.uk/party-wall-refurbishment-london/), our sister company, can quote for it, never as a condition of our advice. [How we manage conflicts of interest](/about/conflicts-of-interest).

---

Hampstead Chartered Surveyors & Building Consultancy — RICS Regulated Firm No. 923064
020 7101 4590 · enquiries@hampsteadcharteredsurveyors.co.uk
Unit 3, Palace Court, 250 Finchley Road, London NW3 6DN

Source: https://www.hampsteadcharteredsurveyors.co.uk/areas/manor-park-party-wall
