# Party Wall Surveyor in Shalford, Surrey: Agreements, Notices and Awards

On a Shalford station-side terrace or a detached Dagden Road plot, the first party wall drawing needs the nearest structure and the route to its affected face.

Party Wall Notices from £195 plus VAT per notice · Schedules of Condition & Party Wall Awards

### Where a terrace meets commercial premises

Guildford Borough Council's 2014 study records different building relationships around the station and on the roads towards Shalford Common.

On the A281 and Shalford Lane, the 2014 study mapped two-storey terraced housing alongside commercial buildings and the churchyard, with woodland following the Wey to the west. Around Station Road, Weald Close, Mitchell's Close, Atherton Close and Pound Place it noted commercial, terraced and semi-detached buildings on small plots. In a terrace or beside a commercial neighbour, ask which chimneys, gutters and boundary walls are shared, who maintains them, and whether party wall notices were served for earlier building work.

For an opening between two ground-floor rooms, trace the separating structure into the unit above and the premises behind it. Ask the engineer where a new beam rests and whether its installation needs a cut into a wall used by the neighbouring property. Where work falls under section 2 of the Party Wall etc. Act 1996, the party structure notice procedure is under section 3. A floor dividing separately owned premises can also be a party structure. Identifying the occupier of the next shop does not by itself identify the person entitled to statutory notice.

Supply a current plan showing the dwelling, separate units and any common approach.

Arrange access to relevant common components where applicable and explain which spaces are controlled by others. Questions concerning title, permitted use or legal responsibility require their own documentary enquiries; a continuous street frontage cannot settle them.

### Excavating beside a detached house

The study placed two-storey detached houses on Dagden Road in medium to small gardens, while south of Shalford Common, on Chinthurst Lane and Kings Road, it recorded low-density, two-storey detached houses in large gardens, alongside a community hall. A density map cannot show whether a roof room or a big rear wing is original, so gather the drawings and completion certificates for each extension or conversion.

A new side room at a detached home can narrow a passage and require a new foundation close to the next house. Show the line of junction and the actual wall for section 1 if the wall is to be built there. On a second section or an enlarged detail, plot the nearest adjoining structure against the proposed excavation for section 6. Identify the relevant dimensions from the edge and base of the dig, the source of any adjoining footing information and where a lower drainage cut might run. A label stating the overall garden width cannot answer these questions.

If a wall steps as it passes a garage or old return, show that step on the plan and link each section to it. A general footing detail may repeat around a proposed extension although the conditions alongside differ. One part may face the side passage while another abuts a neighbouring structure. Ask the designer which construction method and temporary supports are intended along each part.

### A schedule beside the station and on larger plots

Keep an account of boundary repair distinct from internal refurbishment and from a proposed change that was never carried out.

Describe the practical route to the back and sides, retaining restrictions imposed by narrow spaces or control by others. Separate visible defects and repair questions from ownership and access rights.

For a schedule of condition, take an overview revealing which side of the dividing wall faces the proposed operation. Add the closest room and opening to the plan, then record visible marks or previous repairs with dates and photographs. Explain which rooms or yard surfaces could be seen only from a distance. Keep the neighbour's description of an earlier leak or repointing separate from the condition visible on the inspection day. A photograph made when an old chimney was opened can help with orientation if it identifies the exact flue and level.

For a large plot the gate closest to the garage may belong to a different occupier from the person who meets the surveyor at the house. Confirm the inspection route and time in advance. Any proposed later use of that drive for building work needs separate consideration. Include details of what the contractor wants to move through the space and for how long if this is part of the design brief.

### Evidence from watercourses and from the council file

Guildford's January 2016 flood risk technical report says the Tillingbourne joins the Wey near Shalford, and that the Law Brook runs through Shalford Common before meeting the Tillingbourne a little upstream of that confluence.

A valley-wide document can provide useful context for a designer preparing an excavation. It cannot identify the groundwater at the dig, the depth of the neighbouring footing or the cause of cracking in one wall. Obtain engineering information appropriate to the project. Check Guildford's current planning and conservation records by address and keep any building regulations material and private consents with the drawings they relate to. A party wall award deals with statutory works and does not settle a neighbour's title dispute or provide planning permission.

### An adjoining owner with an entrance off another road

Keep a copy of the notice and the date it arrived. Show your access, floor and rooms closest to the work on a separate plan, particularly where the drawing shows only the ground-floor use along the road. Our [adjoining owners’ notice advice](/services/party-wall-surveyor-for-adjoining-owners) explains how to reply and how to clarify proposed works before an inspection. Identify any time when the relevant section of the passage can be opened.

### Shalford, Surrey party wall questions

Local evidence

- [Guildford Borough Council, Green Belt and Countryside Study Volume IV, prepared by Pegasus Planning Group, April 2014 (Shalford, Stages 1 to 3)](https://www.guildford.gov.uk/media/16828/Volume-IV/pdf/Vol_IV_17_04_2014.pdf?m=1470836686013)
- [Guildford Borough Council, Level 1 Strategic Flood Risk Assessment, Volume 2 Technical Report, January 2016](https://www.guildford.gov.uk/media/20761/Guildford-Borough-SFRA-Volume-2-Technical-Report/pdf/Guildford_Borough_SFRA_Volume_2_Technical_Report.pdf)
- [Guildford Borough Council, Conservation areas](https://www.guildford.gov.uk/conservation?ccp=true)
- [Guildford Green Belt and Countryside Study Volume IV, 2014, Shalford Stage 1](https://www.guildford.gov.uk/media/16828/Volume-IV/pdf/Vol_IV_17_04_2014.pdf?m=1470836686013#page=123)
- [Party Wall etc. Act 1996](https://www.legislation.gov.uk/ukpga/1996/40/contents)
- [GOV.UK guidance on party walls and building work](https://www.gov.uk/party-walls-building-works)
Content updated: November 2026.

### Other Shalford, Surrey surveying services

- [Level 3 Building Survey](/areas/shalford-level-3-building-survey)
- [Schedules of Condition](/areas/shalford-schedules-of-condition)
- [Measured Surveys and Lease Plans](/areas/shalford-measured-surveys-lease-plans)
- [Licence to Alter](/areas/shalford-licence-to-alter)
- [Building Defect Investigations](/areas/shalford-building-pathology)
- [Building Condition Surveys](/areas/shalford-condition-surveys)
- [Section 20 Major Works](/areas/shalford-section-20-major-works)
- [RICS Home Surveys](/areas/shalford-home-surveys)
- [Snagging Surveys](/areas/shalford-snagging-surveys)
[Party wall surveying service](/services/party-wall-matters) · [Shalford, Surrey area guide](/areas/shalford)

### Need party wall matters in Shalford, Surrey? Call 020 7101 4590.

If notices lead on to building work, [Hampstead Renovations](https://www.hampsteadrenovations.co.uk/party-wall-refurbishment-london/), our sister company, can quote for it, never as a condition of our advice. [How we manage conflicts of interest](/about/conflicts-of-interest).

---

Hampstead Chartered Surveyors & Building Consultancy — RICS Regulated Firm No. 923064
020 7101 4590 · enquiries@hampsteadcharteredsurveyors.co.uk
Unit 3, Palace Court, 250 Finchley Road, London NW3 6DN

Source: https://www.hampsteadcharteredsurveyors.co.uk/areas/shalford-party-wall