# Party Wall Surveyor in Snaresbrook: Agreements, Notices and Awards

Snaresbrook combines individually designed houses on The Drive with several generations of flats. Locate adjoining rooms and structures on the notice drawings.

Party Wall Notices from £195 plus VAT per notice · Schedules of Condition & Party Wall Awards

### A scheme beside a projecting wing

Redbridge’s scheme describes late-Victorian, Edwardian and interwar detached houses on The Drive, with varied designs including turrets, tile hanging, half-timbering and decorative ridge tiles. This is a range of recorded features, not a specification that applies to every house in the road.

Request records of recovering, window replacement or repairs to decorative details. If an upper room sits within a projecting roof feature, locate it on the plan and explain whether any surrounding void can be reached.

The design of a side extension might reach a two-storey projection on a neighbouring house well before it reaches the main flank. Show that actual relationship on the section for the Party Wall etc. Act 1996. For an excavation, section 6 uses its distance from an adjoining building or structure and the relevant foundation levels. Draw the cut at the closest part of the wing and state whether the projecting structure bears on masonry below, is supported on posts, or has a concealed arrangement that needs checking by the engineer.

Where the new flank wall would be at the line of junction, identify its footing and face on the plan for section 1. Distinguish the approved footprint from the temporary width of excavation and the space needed to carry out the works. The adjoining owner may be concerned about access in the garden even where the finished wall stands entirely on the building owner's side. Give the surveyor information on the proposed route and working space so these matters can be addressed distinctly.

### A schedule for a roof with several features

The 1993 document records substantial front and rear gardens around the individually designed houses on The Drive. That historical setting is useful for understanding the study area, but it cannot establish the current extent of a plot or the sequence of later additions.

A large garden is not proof of ownership of every boundary feature or of drainage arrangements below ground. Keep those legal and documentary questions distinct from the accessible inspection, and identify any specific concern so the proposed scope addresses it rather than assuming an unobstructed view of all elevations.

Before materials are delivered, ask the adjoining owner which room offers a safe view of the roof or projection. Connect each view to a location on the plan. Take an image of the roof shape or elevation before the close detail of tile hanging, a repaired valley or a mark at the wall junction. A general view from the road can locate a turret but is unlikely to record the face overlooking a side passage. Note access limits rather than extending the schedule to parts hidden from view.

For work inside the roof, mark where any new support would enter a qualifying party structure. A relevant right under section 2 needs the section 3 party structure notice procedure considered. Explain whether masonry will be raised, cut or rebuilt and identify the work visible or audible from the adjoining unit. When the design changes from independent supports to a cut into an existing separating wall, tell the surveyor before the contractor proceeds with that altered detail.

### Where houses give way to flats

The remainder of the area, the scheme says, consists of houses and flats of various periods and styles, from the thirties style of Hermitage Court with its contemporary walls and gates to the Eagle Lodge sheltered flats of the 1980s.

An alteration in one of these blocks may concern the floor between dwellings, a shared wall, or a structure entirely within one person's premises. Give the exact flat number and level, obtain the applicable lease plan, and draw a section that identifies the unit above and below. The building manager may know the entrance and common route for an inspection while an individual resident controls the room itself. Make access arrangements by part and retain any restrictions in the schedule. A terrace viewed from outside the block may be demised, shared or simply inaccessible on the day.

### Address checks along The Drive

For The Drive, the scheme wanted side extensions, infill buildings and further front-garden parking kept to a minimum. Redbridge's online list of Article 4 Directions includes The Drive, Snaresbrook, and the council explains that such directions remove some development rights over alterations such as new porches, replacement windows and doors, replacement roof coverings and exterior painting. Find out from the council whether it covers the address and whether earlier changes were approved.

Use the precise current direction and its map to determine which external changes call for planning permission. Keep that decision, building regulations documentation and any landlord’s or estate permission with the approved issue for each. A party wall award addresses the statutory relationship arising from the described works. It cannot grant a replacement window planning permission or give a contractor general use of the neighbouring driveway. Mark any change between the council drawing and the proposed construction detail before notices are prepared.

### A response from beside the side garden

If the proposed foundation runs close to a later wing which is missing from the plan, mark the position, attach any available drawing and state when the notice reached you. Our [adjoining-owner advice on party wall matters](/services/party-wall-surveyor-for-adjoining-owners) sets out the response choices and surveyor's role. Agree a visit while the wall and approach are visible and identify any opening controlled by a different occupier.

### Snaresbrook party wall questions

Local evidence

- [London Borough of Redbridge, Snaresbrook Conservation Area Enhancement Scheme (adopted 22 September 1993)](https://www.redbridge.gov.uk/media/rc4mvs3v/snaresbrook-enhancement-scheme.pdf)
- [London Borough of Redbridge, protected buildings and conservation areas](https://www.redbridge.gov.uk/planning-and-building/planning/protected-buildings-and-conservation-areas/)
- [Redbridge: Snaresbrook Conservation Area Enhancement Scheme, adopted 22 September 1993](https://www.redbridge.gov.uk/media/rc4mvs3v/snaresbrook-enhancement-scheme.pdf#page=4)
- [Party Wall etc. Act 1996](https://www.legislation.gov.uk/ukpga/1996/40/contents)
- [GOV.UK guidance on party walls and building work](https://www.gov.uk/party-walls-building-works)
Content updated: November 2026.

### Other Snaresbrook surveying services

- [Level 3 Building Survey](/areas/snaresbrook-level-3-building-survey)
- [Schedules of Condition](/areas/snaresbrook-schedules-of-condition)
- [Measured Surveys and Lease Plans](/areas/snaresbrook-measured-surveys-lease-plans)
- [Licence to Alter](/areas/snaresbrook-licence-to-alter)
- [Building Defect Investigations](/areas/snaresbrook-building-pathology)
- [Building Condition Surveys](/areas/snaresbrook-condition-surveys)
- [Section 20 Major Works](/areas/snaresbrook-section-20-major-works)
- [Contract Administration](/areas/snaresbrook-contract-administration)
- [RICS Home Surveys](/areas/snaresbrook-home-surveys)
- [Snagging Surveys](/areas/snaresbrook-snagging-surveys)
[Party wall surveying service](/services/party-wall-matters) · [Snaresbrook area guide](/areas/snaresbrook)

### Need party wall matters in Snaresbrook? Call 020 7101 4590.

If notices lead on to building work, [Hampstead Renovations](https://www.hampsteadrenovations.co.uk/party-wall-refurbishment-london/), our sister company, can quote for it, never as a condition of our advice. [How we manage conflicts of interest](/about/conflicts-of-interest).

---

Hampstead Chartered Surveyors & Building Consultancy — RICS Regulated Firm No. 923064
020 7101 4590 · enquiries@hampsteadcharteredsurveyors.co.uk
Unit 3, Palace Court, 250 Finchley Road, London NW3 6DN

Source: https://www.hampsteadcharteredsurveyors.co.uk/areas/snaresbrook-party-wall