A Stoneleigh Chalet may already have rooms in its roof or an extended rear kitchen. Draw the two halves of the pair as they stand before preparing notices.

Party Wall Notices from £195 plus VAT per notice · Schedules of Condition & Party Wall Awards

### A proposed dormer beside an earlier loft conversion

ONS figures for 2021 quoted in the plan put semi-detached housing at over 75% of the stock across Stoneleigh and Auriol, followed by detached housing at around 13%. Many properties of the period were built in a style that became known as the Stoneleigh Chalet. The council's Environmental Character Study describes the Stoneleigh Park Estate as mainly two-storey semi-detached houses, with hipped and gable roofs the most common and exposed brickwork combined with render, the render usually on the first floor.

According to the plan, most building work since the estate was finished has been extensions, and an increasing number of homes have been extended into the roof space, to the back and to the side. On the Stoneleigh Park Estate the character study finds that additions mostly take the form of loft extensions with dormer windows, frequently in sympathetic materials but often giving the houses a bulky appearance.

Show the existing roof junction as well as the new dormer and floor supports. If the adjoining house already has rooms in the roof, mark their position and which voids are still accessible. A new beam cut into a party wall or a proposal to raise that wall can fall within section 2 of the Party Wall etc. Act 1996. The party structure notice for relevant work is under section 3. The fact that both halves were built on one estate does not establish that they retain the same roof construction today.

Mark the remaining voids and access hatches, explaining stored items or fixed linings that limit a view.

Ask the engineer to identify the junction that will be open during construction, how temporary protection will be provided and which neighbouring surfaces would need access. A planning view showing how the dormer looks from the garden cannot by itself specify the intended support or the position of temporary work.

### New foundations past the former kitchen wall

The estate character sheet records long garden runs behind the residential streets and low front boundary walls.

Show how each structure is reached and whether an extension, gate or separate occupation restricts the route.

A rear addition drawn from the line of the original pair may come alongside a previously extended room at the neighbouring house. Put that room on the measured plan and identify the foundation nearest the planned excavation. Section 6 uses specific distance and depth tests. Give the engineer's proposed strip and pad depths and show the evidence supporting any dimension for the adjacent footings. Section 1 concerns a new wall at the line of junction. Where a wall stands back on one owner’s plot, the excavation still needs its own assessment.

If the neighbour’s former side entrance has become an enclosed passage, distinguish that space from the main house. Note where it can be reached and whether its wall or roof conceals parts that might otherwise have been photographed. For a schedule of condition, take a view identifying the passage, the rooms adjoining it, the height and position of earlier repairs and the surfaces actually visible.

### The condition of a bay or upper-floor finish

For the area around Stoneleigh Park Road it notes pebbledash, tile hanging between the front ground-floor and first-floor windows on a large proportion of the semis, and predominantly bay windows on both floors.

A description of frontage refurbishment may concern surface decoration, replacement render or masonry work with different extents.

Retain the distinction between exposed brick and the rendered section. Evidence for one should not be taken as evidence about the concealed wall behind the other, even if the completed elevation looks consistent.

Photograph the bay from a recognisable angle and number its faces against a sketch. A repair described as work to windows may involve a sash or glazing rather than the complete bay support. Keep any specification with a date and stated extent. Where a previous occupier supplied photographs taken during earlier repairs, preserve that source separately from the new record and note views now restricted by a roof lining or a later addition.

### A shop or flat on Broadway

The Broadway character sheet describes three-storey parade buildings with purpose-built upper flats above ground-floor shops. Explain any separate occupation affecting access to the rear, common stairs or relevant roof spaces.

Ask the managing party which roof sections, walls and rainwater systems serve the flat, with descriptions of completed or proposed work. A works account covering the wider parade may need clarification before it can explain the fabric around this unit.

For a structural opening at shop level, identify the unit above and whether the proposed support or temporary work reaches a separating wall or floor. Check the lease and establish which owners need notices. Epsom and Ewell Borough Council's planning record and any building control approval are separate from private consents and the party wall agreement or award. Retain the versions of drawings used for each. If the structural support changes after planning, send the precise revision to the surveyor.

### If another householder proposes changing their half

Mark your roof room, the rear addition or the position of the earlier side passage on a copy of the incoming plans. Keep the dated notice and original drawings, and identify the correct practical route for a condition visit. The [adjoining-owner guide](/services/party-wall-surveyor-for-adjoining-owners) explains your options for replying and what a surveyor will need to know.

### Stoneleigh, Surrey party wall questions

Local evidence

- [Stoneleigh and Auriol Neighbourhood Plan 2025-2039, made 10 March 2026](https://www.epsom-ewell.gov.uk/sites/default/files/SANF%20plan%20made_.pdf)
- [Epsom and Ewell Borough Council, Environmental Character Study (character area summary sheets 3, 5 and 5A)](https://www.epsom-ewell.gov.uk/sites/default/files/documents/residents/planning/planning-policy/CharacterAreaSummarySheets.pdf)
- [Stoneleigh and Auriol Neighbourhood Plan, council-hosted made plan](https://www.epsom-ewell.gov.uk/sites/default/files/SANF%20plan%20made_.pdf#page=27)
- [Epsom and Ewell Environmental Character Study: Stoneleigh Park Estate 5 and Broadway 5A](https://www.epsom-ewell.gov.uk/sites/default/files/documents/residents/planning/planning-policy/CharacterAreaSummarySheets.pdf#page=6)
- [Party Wall etc. Act 1996](https://www.legislation.gov.uk/ukpga/1996/40/contents)
- [GOV.UK guidance on party walls and building work](https://www.gov.uk/party-walls-building-works)
Content updated: November 2026.

### Other Stoneleigh, Surrey surveying services

- [Level 3 Building Survey](/areas/stoneleigh-level-3-building-survey)
- [Schedules of Condition](/areas/stoneleigh-schedules-of-condition)
- [Measured Surveys and Lease Plans](/areas/stoneleigh-measured-surveys-lease-plans)
- [Licence to Alter](/areas/stoneleigh-licence-to-alter)
- [Building Defect Investigations](/areas/stoneleigh-building-pathology)
- [Building Condition Surveys](/areas/stoneleigh-condition-surveys)
- [Section 20 Major Works](/areas/stoneleigh-section-20-major-works)
- [RICS Home Surveys](/areas/stoneleigh-home-surveys)
- [Snagging Surveys](/areas/stoneleigh-snagging-surveys)
[Party wall surveying service](/services/party-wall-matters) · [Stoneleigh, Surrey area guide](/areas/stoneleigh)

### Need party wall matters in Stoneleigh, Surrey? Call 020 7101 4590.

If notices lead on to building work, [Hampstead Renovations](https://www.hampsteadrenovations.co.uk/party-wall-refurbishment-london/), our sister company, can quote for it, never as a condition of our advice. [How we manage conflicts of interest](/about/conflicts-of-interest).

---

Hampstead Chartered Surveyors & Building Consultancy — RICS Regulated Firm No. 923064
020 7101 4590 · enquiries@hampsteadcharteredsurveyors.co.uk
Unit 3, Palace Court, 250 Finchley Road, London NW3 6DN

Source: https://www.hampsteadcharteredsurveyors.co.uk/areas/stoneleigh-party-wall