<!-- source-hash: 479c7c1263ef43246923a2af95627400c692652b2baf4784e38c03b866a8f146 -->
# Party Wall Surveyor in Sunbury-on-Thames, Surrey: Agreements, Notices and Awards

From Lower Sunbury’s riverside villas to the cottage pairs off Church Street, check which roof, return or garden wall is affected by a neighbour’s plans.

Party Wall Notices from £195 plus VAT per notice · Schedules of Condition & Party Wall Awards

### Small houses near the church, larger houses along the water

Spelthorne's January 2025 appraisal of the Lower Sunbury Conservation Area dates most of its historic structures to the 18th and 19th centuries, with substantial Georgian villas predominating along the riverside and French Street. The historic core around Church Street and Green Street mixes larger houses with pairs or terraces of smaller two-storey cottages and has a higher proportion of late Victorian dwellings, with large bay windows and steeply pitched roofs. On central Thames Street, buildings of two and three storeys cluster together, most abutting the road or set only slightly back, with modest houses beside Victorian shopfronts, historic pubs and a late 19th-century bank.

On a tightly built cottage plot, establish whether a new rear wall will be at the line of junction under section 1 of the Party Wall etc. Act 1996. A separate question arises if the proposal includes an opening in an existing party structure. The engineer should show the bearing, the masonry to be removed and the means of supporting adjoining floors. Section 2 provides rights for specified work to party structures and a party structure notice is served under section 3 where applicable.

Behind a larger riverside frontage, the nearest adjoining building can be an extension or outbuilding. Draw the whole excavation relative to that structure and show any change in depth on a section. For section 6 the relevant distances and foundation depths matter. A map showing that both plots front the water cannot establish those dimensions, soil conditions or whether a particular adjoining room has experienced water entry.

### Which roof section will be open?

The appraisal records pitched, hipped and parapet roof forms with clay tiles and slate. If the property contains more than one roof section, identify which part a reported renewal covers. A single phrase such as roof repaired may leave the upper, rear or extension sections unexplained.

Supply specifications and work photographs where available, noting the covering and junction included. Separate records for the main house from those for a later addition. A finished covering can show an external surface without providing evidence about the concealed arrangement or another roof behind the frontage.

At a roof adjoining another house, ask the designer to distinguish removal of coverings from cutting into or raising the wall between the houses. Mark where it will be necessary to lift a flashing or disturb the edge of the neighbouring roof. State what will protect the joint during the works. If the method needs access across another roof or yard, set out the intended duration and purpose so it can be discussed with the proper parties.

Explain any separate occupation, shared door or gate that controls entry beyond the street frontage.

Confirm the controlling party and access arrangement before relying on that route for inspection.

### A schedule for a bay, repaired opening or garden wall

The historic-core section records late-Victorian groups with large bay windows and steep roofs.

Provide available drawings for openings, extensions and altered accommodation, retaining their dates and stated scope. Mark where the plan differs from the layout at the property. A record for work at a rear room should not be taken as evidence about the bay or the earlier front wall unless it describes that component.

For a condition visit, give the surveyor an overall view of the bay and a key to its individual windows or faces. Record the exterior, the adjacent internal finishes and any existing patches that are visible from an agreed position. Note whether the observation was made at ground level or from an upper window. A report that an earlier repair covered all the windows should be retained as the resident's account unless a document identifies the work.

A brick garden wall beside a planned trench may have pre-existing weathering or repairs. Locate the stretch by gate, pier or change in height. Avoid giving a cause for an open joint on a photograph alone. If earlier pictures of repair work exist, mark their dates and position and retain them separately. Access agreed for photography does not by itself cover dismantling a panel or setting up construction equipment on the adjoining land.

### Local planning decisions and private rights

The Lower Sunbury Conservation Area was first designated in 1969, with boundary revisions in 1992, and the appraisal says planning permission will usually be required to demolish buildings or structures wholly or substantially, including walls, gate piers and chimneys.

Check the relevant site and proposed works with Spelthorne Borough Council, including any heritage decision. The drawings approved for planning may show a similar roof line with different structural support from the engineer's final detail. Building control, any obligations under a lease and rights of access each have a separate role. The party wall award cannot authorise all of those matters. Put a change to the trench or shared roof junction back to the surveyor with both drawing revisions identified.

### A notice for works behind Thames Street

An owner reached through another building can mark their entrance and rooms on a copy of the incoming drawing. Record the date of receipt and keep all notices and enclosures together. Our [guidance for an adjoining owner](/services/party-wall-surveyor-for-adjoining-owners) explains response choices and surveyor appointments, including what to prepare before a condition inspection.

### Sunbury, Surrey party wall questions

Local evidence

- [Spelthorne Borough Council, Lower Sunbury Conservation Area Appraisal, January 2025](https://www.spelthorne.gov.uk/sites/default/files/migration/media/27477/Lower-Sunbury-Conservation-Area-Appraisal/pdf/LowerSunbury_CAA_28January2025_Copy.pdf)
- [Spelthorne Borough Council, Spelthorne Design Code, November 2025](https://www.spelthorne.gov.uk/sites/default/files/2026-03/Spelthorne%20Design%20Code%202.pdf)
- [Spelthorne Borough Council, Trees, conservation areas and listed buildings information](https://www.spelthorne.gov.uk/page/1212/trees-conservation-areas-and-listed-buildings-information)
- [Lower Sunbury Conservation Area Appraisal, January 2025](https://www.spelthorne.gov.uk/sites/default/files/migration/media/27477/Lower-Sunbury-Conservation-Area-Appraisal/pdf/LowerSunbury_CAA_28January2025_Copy.pdf#page=12)
- [Party Wall etc. Act 1996](https://www.legislation.gov.uk/ukpga/1996/40/contents)
- [GOV.UK guidance on party walls and building work](https://www.gov.uk/party-walls-building-works)
Content updated: November 2026.

### Other Sunbury, Surrey surveying services

- [Level 3 Building Survey](/areas/sunbury-on-thames-level-3-building-survey)
- [Schedules of Condition](/areas/sunbury-on-thames-schedules-of-condition)
- [Measured Surveys and Lease Plans](/areas/sunbury-on-thames-measured-surveys-lease-plans)
- [Licence to Alter](/areas/sunbury-on-thames-licence-to-alter)
- [Building Defect Investigations](/areas/sunbury-on-thames-building-pathology)
- [Building Condition Surveys](/areas/sunbury-on-thames-condition-surveys)
- [Section 20 Major Works](/areas/sunbury-on-thames-section-20-major-works)
- [RICS Home Surveys](/areas/sunbury-on-thames-home-surveys)
- [Snagging Surveys](/areas/sunbury-on-thames-snagging-surveys)
[Party wall surveying service](/services/party-wall-matters) · [Sunbury, Surrey area guide](/areas/sunbury-on-thames)

### Need party wall matters in Sunbury, Surrey? Call 020 7101 4590.

If notices lead on to building work, [Hampstead Renovations](https://www.hampsteadrenovations.co.uk/party-wall-refurbishment-london/), our sister company, can quote for it, never as a condition of our advice. [How we manage conflicts of interest](/about/conflicts-of-interest).

---

Hampstead Chartered Surveyors & Building Consultancy — RICS Regulated Firm No. 923064
020 7101 4590 · enquiries@hampsteadcharteredsurveyors.co.uk
Unit 3, Palace Court, 250 Finchley Road, London NW3 6DN

Source: https://www.hampsteadcharteredsurveyors.co.uk/areas/sunbury-on-thames-party-wall
