Party Wall Notice Checker

Four quick questions: does your project need a party wall notice, and which one?

RICS RegulatedLondonChartered Surveyors
Party Wall Tool

Do I need to serve a party wall notice?

Loft conversions, extensions, chimney breast removals and basements in London commonly engage the Party Wall etc. Act 1996. This free checker walks the same statutory questions our surveyors ask — shared structures, boundary walls and the 3/6-metre excavation rules — and tells you which notice applies and how much lead time it needs. It runs entirely in your browser and asks for no personal details.

1. Will you cut into, raise, underpin, thicken, repair or demolish a wall or structure shared with a neighbour — for example inserting steel beams, removing a chimney breast or underpinning a party wall?
2. Will you build a new wall or building up to, or astride, the boundary line with a neighbour where there is currently no wall?
3. Will you excavate (foundations, basement, drainage) within 3 metres of a neighbouring building or structure and deeper than its foundations?
4. Will you excavate within 6 metres of a neighbouring building where a line drawn down at 45 degrees from the bottom of its foundations would meet your excavation — typical for basements and piled foundations?

Indicative only — not legal advice. Whether the Act applies depends on the specific works, drawings and boundary position; we confirm the notice strategy before anything is served. Read the Party Wall etc. Act 1996 and the Government explanatory booklet.

Notice Periods

The three notice types at a glance

From the Party Wall etc. Act 1996 — confirmed for your project before serving
NoticeCoversMinimum notice
Party Structure Notice (s2)Cutting in, raising, underpinning, thickening, repair or demolition of a shared structure2 months
Line of Junction Notice (s1)A new wall or building up to or astride the boundary1 month
Three/Six-Metre Notice (s6)Excavation within 3 metres deeper than neighbouring foundations, or within 6 metres under the 45-degree rule1 month

For notices concerning work to an existing party structure or excavation, no written consent within 14 days means a dispute is deemed to have arisen. For a new wall astride the boundary, written consent is required; without it within 14 days, the wall must be built wholly on the building owner’s land. Disagreements about Section 1 work follow the Act’s dispute procedure. Free downloadable letters: our party wall notice templates page.

Get It Served Right

Want the notices handled for you?

Send your drawings and the neighbouring addresses and we will confirm which notices apply, prepare them and serve them correctly.

Prefer to talk it through first? Call 020 7101 4590.

FAQs

Common questions about party wall notices

Is this checker legal advice?

No. It is an indicative guide to sections 1, 2 and 6 of the Party Wall etc. Act 1996. Whether the Act applies depends on the specific works, drawings and boundary position, and we confirm the notice strategy before anything is served.

What happens after a notice is served?

For notices concerning work to an existing party structure or excavation, no written consent within 14 days means a dispute is deemed to have arisen. For a new wall astride the boundary, written consent is required; without it within 14 days, the wall must be built wholly on the building owner’s land. Disagreements about Section 1 work follow the Act’s dispute procedure.

Can I serve the notices myself?

Yes. Building owners can serve their own notices, and the Government explanatory booklet includes example letters. A defective notice can invalidate the process, so many owners ask a surveyor to prepare and serve them.

How far in advance should I serve notice?

A section 2 party structure notice needs at least 2 months before the notifiable works start; section 1 and section 6 notices need at least 1 month. Serving early protects the programme.