Discuss fire and facade advice
Share the building type, height, tenure and any existing reports so we can identify the right next step.
Prefer to talk it through first? Call 020 7101 4590.
Cladding remediation London, CSS and BSF support
Cladding remediation London instructions usually combine unsafe cladding evidence, leaseholder pressure, funding criteria, specification, tender control, contract administration and works monitoring.
Our RICS regulated cladding remediation consultants advise managing agents, freeholders, leaseholders, RMCs and housing providers on the route from PAS 9980 / FRAEW evidence to a fundable and deliverable remediation scope. We coordinate fire engineers and facade specialists where required, while keeping the client-side advisory role separate from the contractor.
Where a London block may qualify for the Cladding Safety Scheme, CSS, or Building Safety Fund, BSF, we help assemble and interpret the evidence behind the application: FRAEW findings, intrusive investigation records, options appraisal, specifications, tender returns, cost evidence and monitoring reports. No funding approval is guaranteed; the decision sits with the relevant scheme or public body.
We are independent advisers, not the cladding contractor. We provide independent cladding remediation advisory, specification, procurement, contract administration and monitoring support. We do not present this service as contractor-led cladding replacement. Where contractors, fire engineers or specialist facade designers are required, we help clients define and manage that route clearly and at arm's length.
What to send, and what you receive
Share a few building details and we will confirm the right assessment or survey scope and a fee before you instruct.
What to send before we quote
- The building address and postcode
- Height or number of storeys, if known
- Tenure and how the building is used
- Any existing fire risk assessment or fire reports
- Drawings or previous external wall information
What you receive
- A written assessment, survey or review suited to the instruction
- Findings and recommended next steps
- A clear scope of what was and was not assessed
Some work can need specialist input (for example opening-up, laboratory analysis or a fire engineer); we set out where this applies and coordinate it where instructed. Ask what the report would include.
When to instruct cladding remediation consultants
Clients usually come to us with an external wall problem and a decision to make, not the service name. These are the typical triggers.
- You have unsafe or uncertain cladding on a residential block.
- A FRAEW / PAS 9980 report recommends further investigation or remediation.
- You need to understand remediation options before tendering.
- You need technical evidence for Cladding Safety Scheme or Building Safety Fund routes.
- Leaseholders, lenders or residents are asking for clarity.
- Previous reports are unclear or conflicting.
- You need a scope of works, tender documents or contractor evaluation.
- Remediation works need independent monitoring during delivery.
What this service covers
London remediation schemes often involve occupied blocks, leaseholder pressure, lender queries, funding criteria and limited original construction records.
Cladding remediation consultancy
Support can cover the full route from initial risk concern to investigation, specification, procurement, works monitoring and stakeholder reporting.
Initial review and document audit
We review FRAEW, PAS 9980, EWS1, drawings, O&M manuals, fire strategy documents, previous surveys and known evidence gaps.
Intrusive investigations and material identification
Where required, intrusive opening-up can help identify cladding, insulation, sheathing, cavity barriers and hidden external wall interfaces.
Options appraisal
Advice can compare management measures, targeted remediation, replacement, fire engineering input and procurement routes.
Scope, specification and tender support
We can develop remedial work scopes, support tender documentation and help clients evaluate contractor returns.
Contract administration and monitoring
Clerk of works style monitoring, contract administration and resident reporting can support delivery quality and accountability.
CSS and BSF funding advisory
Where appropriate, we assist with technical evidence, application support and coordination for Cladding Safety Scheme or Building Safety Fund processes.
London building safety context
The priority is a credible evidence route that supports proportionate remediation and avoids unsupported assumptions about the external wall system.
Two statutory thresholds organise cladding remediation in England: 11 metres or five storeys, where the Building Safety Act 2022’s Part 5 leaseholder protections and Schedule 8 cost protections can apply (section 117), and 18 metres or seven storeys with two or more residential units, where the section 65 higher-risk regime begins. Funding eligibility and the costs that can be passed to leaseholders both turn in part on that positioning; the PAS 9980:2026 appraisal supplies the risk evidence.
Our advice is evidence-led and written for serious property decision-makers. Where legal advice, specialist fire engineering input or statutory role appointments are required, those matters are identified clearly rather than implied.
Cladding remediation on London blocks rarely starts from a clean sheet: there is usually a FRAEW or fire risk appraisal flagging the external wall, an anxious group of leaseholders, and a funding route that will only pay for work that is properly evidenced and procured. Our role is client-side and independent of any contractor or product: we review the investigation findings, appraise remediation options against the actual risk and the building's construction, develop a specification that can be tendered fairly, and support procurement, contract administration and monitoring through delivery. Across the capital that means working with mixed freehold and RMC ownership, occupied buildings, access and party wall constraints, and the documentation demands of the Cladding Safety Scheme or Building Safety Fund. Keeping the advice separate from delivery protects leaseholders funding the works and gives the responsible person a defensible, evidenced basis for the scope and its cost.
Outputs and next steps
Remediation strategy
Clear phased route covering investigation, evidence, funding, scope, procurement and delivery controls.
Technical specification
Remedial works scope and specification suitable for tendering and cost planning.
Stakeholder reporting
Resident, freeholder, managing-agent and housing-association reporting that explains risks and next steps.
Site monitoring
Independent monitoring of remedial works quality, progress and emerging technical issues.
How cladding remediation support works
Initial building and document review
We review the building, its height and construction and the concern raised.
FRAEW / PAS 9980 / EWS1 / O&M evidence review
We review prior appraisals, fire strategy, EWS1 history and operation and maintenance information.
Gap analysis and investigation route
We identify what is missing and the proportionate route to a reliable evidence base.
Intrusive opening-up or specialist input where required
We scope and coordinate intrusive investigation or specialist input where the evidence requires it.
Options appraisal
We compare management measures, targeted remediation and replacement against risk, cost and disruption.
Remedial scope and specification
We develop a clear, measurable scope and specification suitable for competitive tendering.
Tender preparation and contractor evaluation
We prepare tender documentation and evaluate contractor returns objectively on the client's behalf.
Contract administration and monitoring
We administer the contract and monitor works quality and progress independently of the contractor.
Resident and stakeholder reporting
We provide clear reporting for leaseholders, freeholders, managing agents and funders.
Completion, defects and handover review
We oversee practical completion, manage defects and support handover and the golden thread record.
What we do — and what we do not do
Our role is to provide RICS regulated building consultancy: independent cladding remediation advisory, specification, procurement and monitoring support. We do not carry out the cladding works ourselves and we do not present this service as contractor-led cladding replacement.
Where formal FRAEW sign-off, fire engineering opinion, facade engineering design, statutory fire risk assessment or legal advice is required, we identify that clearly, confirm appointment scope, competence and professional indemnity insurance, and coordinate with competent specialists where appropriate. EWS1 remains a separate lender and valuation-facing process and is not a life-safety certificate.
Cladding Safety Scheme and Building Safety Fund support
Cladding remediation is often funded through the Cladding Safety Scheme or Building Safety Fund. We help clients assemble, interpret and coordinate the technical evidence those routes rely on.
We do not guarantee funding approval. Eligibility and acceptance are determined by the scheme and the relevant body, not by us. Our role is to make the technical evidence robust and well organised so the funding route is properly supported.
- Technical evidence gathering
- Report coordination
- Remediation scope
- Pre-tender advice
- Application evidence support
- Project monitoring after funding approval
A representative cladding remediation route for a London residential block
The following London inspection and reporting workflow breakdown shows how our RICS surveyors scope, inspect and report on real properties across London; see our published London surveying case studies for completed project records.
- Typical client: A managing agent acting for a freeholder
- Typical building: An occupied residential block with external wall concerns
- Typical issue: External wall uncertainty following a previous fire safety review
- Typical instruction: Review existing FRAEW / EWS1 / O&M evidence and advise on the remediation route
- What the client typically receives: An evidence gap review, an intrusive investigation scope, remediation options and a tender route
- How it is typically used: A clearer route for funding evidence, resident communication and contractor procurement
- Related services: FRAEW / PAS 9980, Cladding Safety Scheme / BSF, Building Safety Act Consultants
Related fire safety and facade services
FRAEW & PAS 9980 London
FRAEW and PAS 9980 external wall fire risk appraisal support in London for managing agents, freeholders, housing associations and residential blocks.
View FRAEW & PAS 9980 LondonCladding Safety Scheme & Building Safety Fund London
Cladding Safety Scheme and Building Safety Fund advisory support in London for funding evidence, technical reports and remediation project coordination.
View Cladding Safety Scheme & Building Safety Fund LondonBuilding Safety Act Consultants London
Building Safety Act compliance support in London for higher-risk residential buildings, accountable persons, safety cases and golden thread information.
View Building Safety Act Consultants LondonHigh-Rise Structural Surveys
Structural condition evidence for residential blocks and higher-risk buildings.
View ServiceSafety Case Report Support London
Safety case report support in London for higher-risk buildings, golden thread information, building safety evidence and technical gap analysis.
View Safety Case Report Support LondonFire Safety & Facade Consultants London
RICS regulated fire safety and facade consultants in London for FRAEW, cladding, compartmentation, fire doors and Building Safety Act support.
View Fire Safety & Facade Consultants LondonFacade Investigations London
Facade investigations and external wall surveys in London for water ingress, cladding defects, curtain walling, fixings and building envelope issues.
View Facade Investigations LondonFire Compartmentation Surveys London
Fire compartmentation surveys in London for residential blocks, schools, hospitals, universities, offices and housing associations.
View Fire Compartmentation Surveys LondonPassive Fire Protection Surveys London
Passive fire protection surveys in London covering compartmentation, fire stopping, cavity barriers, risers, service penetrations and remedial schedules.
View Passive Fire Protection Surveys LondonFire Door Inspections London
Fire door inspections in London for flats, communal doors, schools, universities, NHS buildings, care homes and commercial property.
View Fire Door Inspections LondonSection 20 & Major Works Consultancy
Leaseholder consultation, specification and project controls for major residential block works.
View Section 20 & Major Works ConsultancyEWS1 Form & External Wall Advice
EWS1 advice and external wall system review in London for flats, leaseholders and managing agents. EWS1 is lender and valuation facing, not a life-safety certificate, and is separate from cladding remediation.
View EWS1 Form & External Wall AdviceArchitectural Design & Planning London
Parent London service page for this instruction type.
View Architectural Design & Planning LondonSector support for London property teams
Managing agents fire safety
Fire safety, facade, EWS1 and cladding advisory for residential block portfolios.
View Managing agents fire safetyHousing associations building safety
Building safety, cladding remediation and passive fire protection support for social housing.
View Housing associations building safetySchools fire safety consultants
Compartmentation, fire door and estate fire safety survey support for schools and academy trusts.
View Schools fire safety consultantsUniversities fire safety consultants
Fire safety and facade survey support for universities and student accommodation.
View Universities fire safety consultantsNHS and healthcare fire safety
Fire door, compartmentation and building safety advisory for healthcare estates.
View NHS and healthcare fire safetyCommercial property fire safety
Fire safety and facade survey advice for offices, mixed-use and commercial landlords.
View Commercial property fire safetyCladding remediation support across priority London areas
Cladding remediation in Croydon
CR0 — remediation scoping and oversight for post-2010 towers and town-centre blocks.
View Cladding remediation in CroydonCladding remediation in Poplar
E14 — remediation scoping and oversight for high-rise residential stock across E14.
View Cladding remediation in PoplarCladding remediation in Stratford
E15 — remediation scoping and oversight for East Village and post-Olympic residential blocks.
View Cladding remediation in StratfordCladding remediation in Wandsworth
SW18 — remediation scoping and oversight for riverside blocks and mansion stock.
View Cladding remediation in WandsworthCladding remediation in Woolwich
SE18 — remediation scoping and oversight for Royal Arsenal riverside blocks.
View Cladding remediation in WoolwichCladding remediation in Canary Wharf
E14 — remediation scoping and oversight for dockside towers and apartment blocks.
View Cladding remediation in Canary WharfCladding remediation in Lambeth
SE11 — remediation scoping and oversight for riverside towers and estate blocks.
View Cladding remediation in LambethCladding remediation in Swiss Cottage
NW3 — remediation scoping and oversight for post-war towers and mansion blocks.
View Cladding remediation in Swiss CottageCladding remediation in Battersea
SW11 — remediation scoping and oversight for riverside blocks and mansion stock.
View Cladding remediation in BatterseaCladding remediation in Paddington
W2 — remediation scoping and oversight for basin-side blocks and period stock.
View Cladding remediation in PaddingtonCladding remediation in Westminster
SW1 — remediation scoping and oversight for mansion blocks and estate stock.
View Cladding remediation in WestminsterCladding remediation in Hammersmith
W6 — remediation scoping and oversight for riverside blocks and conversions.
View Cladding remediation in HammersmithRelated fire safety and facade guidance
PAS 9980 and FRAEW explained
How external wall fire risk is appraised, and what the outcome informs.
Read the guideEWS1 certificates
How EWS1 relates to flats, mortgages and external walls.
View EWS1 certificatesFire door inspections
What clients should expect from fire door surveys and reports.
View Fire door inspectionsBuilding Safety Act guide
A practical guide to the Building Safety Act context.
View Building Safety Act guideCladding Safety Scheme
Application process notes for eligible buildings.
View Cladding Safety SchemeLondon Cladding Remediation Progress 2026
Current programme context, delivery risks and practical next steps for building owners.
Read the updateWhat affects the fee?
Cladding remediation support is scoped to the building and the stage you are at, so the fee reflects the scope of involvement rather than a fixed rate. The main factors are:
- The height of the building and the access required
- The cladding systems involved and the extent of remediation
- The investigation and assessment evidence already available
- Whether the instruction is advice only or support through the works
- Whether funding application support is required
- The procurement route and the level of works monitoring expected
- The programme and any funding or regulatory deadlines
- Whether leaseholder communication or Section 20 / major works coordination is required
We confirm a written scope and fee before you instruct, so the cost is clear before any commitment.
Not sure which assessment your building needs? Send the building information and we'll identify the right next step.
Send building informationPrimary guidance we work to
The official guidance behind cladding remediation funding evidence and leaseholder protections.
- Cladding Safety Scheme overview (GOV.UK) — Homes England's guidance on the scheme that meets the cost of addressing life safety fire risks associated with cladding on eligible residential buildings in England
- Building Safety Fund: information for leaseholders and residents (GOV.UK) — Government information for leaseholders and residents in buildings in the Building Safety Fund
- Building Safety Act 2022 — higher-risk building duties and the leaseholder protection provisions
- BSI PAS 9980:2026 overview — the code of practice for fire risk appraisal of external wall construction and cladding of existing blocks of flats
Cladding Remediation Consultants London FAQs
Do you physically replace cladding?
No. This service is independent consultancy, not contractor-led cladding replacement. We support investigation, options appraisal, specification, procurement, contract administration and monitoring, and we appoint and oversee the remediation contractor on the client's behalf. We do not carry out the works ourselves. Keeping the adviser and the contractor separate protects the client commercially and keeps our advice objective.
What does a cladding remediation consultant do?
A cladding remediation consultant takes a building from an external wall concern to a controlled, evidenced remediation. That means reviewing existing FRAEW, EWS1 and construction evidence, scoping any further investigation, appraising remediation options, writing the remedial specification, running a fair tender, evaluating contractors, administering the contract and monitoring the works independently. The aim is a defensible route the client, leaseholders, lenders and funders can rely on.
When is cladding remediation needed?
Remediation is typically considered where a FRAEW or other competent assessment identifies an unacceptable external wall fire risk that cannot be managed by interim measures alone, or where cladding, insulation, cavity barriers or balconies are found to be unsafe or non-compliant. The trigger is usually a risk-based assessment plus building safety, funding or sale and lending pressure. We help establish whether remediation is genuinely required and what is proportionate before any works are committed.
Who normally instructs cladding remediation consultants?
Managing agents, freeholders, resident management companies, right to manage companies, housing associations, local authorities and developers commonly instruct this work. Managing agents often instruct on behalf of, or alongside, the freeholder. We make the basis of appointment clear so the advice can be relied on by the building owner, leaseholders, lenders and funders.
Can you help prepare a remediation specification?
Yes. We develop a clear, measurable remedial scope and specification based on the evidence, suitable for competitive tendering and cost planning. A well-defined specification is the single biggest control on cost, programme and quality, and it gives leaseholders and funders confidence that the works are proportionate and properly defined rather than open-ended.
Can you manage tendering for cladding remediation works?
Yes. We prepare tender documentation, identify a suitable contractor pool, manage the tender process and evaluate returns objectively on price, quality, programme and methodology, then provide a clear recommendation. Running procurement independently of the contractor helps demonstrate to leaseholders and funders that contractor selection was fair and evidence-based.
Do you provide contract administration during remediation?
Yes. We can act as independent contract administrator through delivery, managing instructions, valuations, variations, programme and quality, and reporting to the client and stakeholders. Acting independently means the contract is administered fairly between the parties and the client's commercial position is protected, rather than the works being contractor-controlled.
Can you coordinate with fire engineers or facade specialists?
Yes. Where formal FRAEW sign-off, fire engineering opinion or specialist facade engineering design is required, we identify that clearly, confirm competence and insurance, and coordinate competent specialists rather than implying that input is covered by us. We integrate their input into the remediation route so the client has one coherent, properly attributed evidence base.
Can you help explain remediation plans to leaseholders?
Yes. Cladding remediation is as much a communication challenge as a technical one. We provide plain-English summaries and stakeholder reporting for leaseholders, resident management companies, freeholders and funders, explaining the risk, the options, the programme and the cost basis so non-technical stakeholders can engage with confidence.
Can you help after a B2 EWS1 outcome?
Yes. A B2 EWS1 outcome indicates an external wall system that requires remediation. We can review the underlying evidence, commission or scope further investigation where required, appraise remediation options and set out a route through specification, procurement and funding. EWS1 itself is a lender and valuation-facing process, not a life-safety certificate, and we keep that distinction clear.
Can this support CSS or BSF funding?
Yes, where a building is eligible. We help assemble, interpret and coordinate the technical evidence that Cladding Safety Scheme or Building Safety Fund routes rely on, including report coordination, remediation scope and pre-tender advice, and project monitoring after funding approval. Eligibility and acceptance are determined by the scheme and the relevant body, not by us.
Do you guarantee CSS or BSF funding?
No. We do not guarantee funding approval. Our role is to help clients assemble, interpret and coordinate technical evidence where appropriate so a funding route is properly supported. The funding decision rests entirely with the Cladding Safety Scheme or Building Safety Fund and the relevant body, against their own eligibility criteria.
Need independent cladding remediation advice for a London block? Call 020 7101 4590.
Enquire about Cladding Remediation
Tell us briefly about the building and what you need. Your enquiry goes directly to our chartered surveying team.
We respond to enquiries within one working day.
Prefer to talk it through first? Call 020 7101 4590 or email enquiries@hampsteadcharteredsurveyors.co.uk.
Cladding remediation consultants in Central London
Regional guidance for Central London building stock, client decisions and delivery constraints.
Cladding remediation consultants in Central London
Cladding remediation turns a defined external-wall risk and evidence base into proportionate design, procurement and delivery. Central London schemes must coordinate life safety with occupied homes, facade interfaces, access, neighbouring uses and planning or heritage constraints.
View Cladding remediation consultants Central London guidanceDedicated Central London service guides
Compare 59 dedicated service guides and 16 core neighbourhoods.
View the Central London hubCladding Remediation Consultants London for Residential Blocks & Building Owners: Deliverables & Transparent Fee Matrix
Every cladding remediation consultants london for residential blocks & building owners instruction is confirmed by a fixed written fee proposal once the property address, tenure and scope are reviewed. Starting fees begin from £2,250 plus VAT; all fee guides below are exclusive of VAT (plus VAT).
| Scope / Property Band | Deliverables & Technical Scope | Typical Turnaround | Transparent Fee Guide (Excl. VAT) |
|---|---|---|---|
| Band A — Standard / Single-Property Cladding Remediation Consultants London for Residential Blocks & Building Owners | Pre-instruction document review, targeted site inspection or desktop appraisal, and structured RICS-aligned report. | 3–5 working days from inspection | From £2,250 plus VAT (external wall remediation feasibility, PAS 9980 alignment & scope brief) |
| Band B — Comprehensive Cladding Remediation Consultants London for Residential Blocks & Building Owners Instruction | Full site inspection, photographic defect/evidence schedule, regulatory analysis and prioritised cost/action plan. | 5–8 working days from site access | From £4,250 plus VAT (cladding remediation tender pack, facade specification & JCT procurement) |
| Band C — Complex, Heritage or Multi-Unit Cladding Remediation Consultants London for Residential Blocks & Building Owners | Listed-building, higher-risk, multi-unit or portfolio instruction with senior director review and adviser coordination. | 7–12 working days (or agreed milestone) | From £6,950 plus VAT (full contract administration, clerk-of-works & Gateway 2/3 sign-off support) |