From Survey to Completed Works

A survey identifies evidence, risk and priorities. What happens next remains your choice, with separate appointments for professional advice and contractor delivery.

Client choice preservedSeparate appointmentsNo self-certification
After The Report

Choose the route that fits the building and the decision

Not every defect needs immediate construction work, and a professional report does not oblige you to appoint HCS or any named contractor.

The appropriate next step depends on urgency, risk, ownership, consents, available information, budget and whether independent professional control is required. The three routes below explain what HCS may do and where the roles must be separated.

Three Routes

What can happen after a survey

Each route starts from the same report, but the appointment, responsibility and independence position are different.

1. Monitor and plan

Some matters can be monitored, maintained or planned into a later programme. HCS may recommend records, risk controls, a review trigger or a later inspection rather than immediate work. Urgent safety or weatherproofing advice remains clearly identified.

2. HCS consultant and external contractor

HCS can be separately appointed to turn findings into a scope or specification, support procurement and, where appropriate, administer or monitor a building contract carried out by a contractor independent of HCS.

3. Ask HCS to quote as contractor

For a suitable fit-out, light refurbishment or defined minor-works scope, you may invite HCS to provide a separate works quotation. This is optional. The professional role is reviewed and HCS does not independently approve its own work.

Decision Guide

How the role separation works in practice

HCS role comparison after a survey
SituationHCS professional adviserHCS contractorPermitted approach
HCS survey followed by an external contractorYesNoHCS may specify, tender and administer subject to the written scope and conflicts check.
HCS survey followed by an HCS works quotationPrevious survey only; role reviewedYesSeparate works appointment. An independent professional monitors or certifies if required.
HCS contract administrationYesNoThe contractor must be independent of HCS.
HCS delivering the worksNo independent certifying roleYesA third party is appointed for independent administration, monitoring or certification where needed.
HCS acting for an adjoining ownerYesNo on the relevant building owner's worksHCS declines the contractor role for that work.
HCS expert or safety-critical evidenceYesNo connected remediation interestThe conclusion remains free of an HCS works-delivery opportunity on the same matter.
Route 2

Independent consultant support with an external contractor

Before procurement

  • Confirm priorities, constraints and information gaps
  • Obtain specialist design or investigation where needed
  • Prepare a proportionate scope or specification
  • Identify planning, landlord, party-wall and statutory requirements
  • Agree the procurement and contract route

During and after the work

  • Answer technical tender queries within the appointment
  • Administer an external contractor's building contract where appointed
  • Record instructions, valuations and changes
  • Address practical completion and outstanding items
  • Manage defects-period procedures under the contract

This route is staffed by the practice’s project and contract professionals — contract administrators and employer’s agents working under JCT and NEC forms, with clerks of works for site inspection — described on our people page.

Route 3

A separate HCS works quotation

The contractor route is considered only after the scope, role conflict and required independent appointments are understood.

A works quotation sets out the proposed contractor scope, assumptions, exclusions, price basis, programme and pre-start requirements. Professional services already carried out do not become contractor certification, and HCS does not represent that its RICS-regulated professional status independently certifies contractor workmanship.

Depending on the works, the client may also need designers, statutory approvals, landlord consent, a Licence to Alter, party-wall procedures, CDM appointments, asbestos information or other specialist input. Those items are identified rather than assumed to be included.

Several of those items are professional services the practice itself provides under separate appointments — principal designer duties, party-wall procedures and licence-to-alter support among them — always subject to the role-separation red lines in our conflicts policy.

Refurbishment & Building Works

FAQs

Questions after a survey

Does an HCS survey require me to use HCS for the works?

No. The survey and any works appointment are separate. You may monitor the issue, appoint HCS as professional consultant with an external contractor, ask HCS to quote as contractor for a suitable scope, or obtain quotations from other contractors.

Can HCS administer work carried out by HCS?

No. Where HCS is contractor, HCS does not act as the independent contract administrator, employer's agent, clerk of works, certifier or expert witness for those works. A separate professional must be appointed where independent monitoring or certification is required.

What happens to an earlier survey appointment if HCS is asked to quote?

The roles and records are reviewed before a works quotation is accepted. The professional appointment is closed or restructured as necessary, and the contractor scope, terms, price basis, programme, exclusions and change procedure are recorded under a separate works contract.

Can HCS help obtain quotations from external contractors?

Yes, where separately appointed and appropriate. HCS can develop a scope or specification, support a tender process and administer an external contractor's building contract, subject to the agreed professional role and conflicts check.