Party Wall Surveyor in Addlestone, Surrey: Agreements, Notices and Awards

In Addlestone, a beam over two Station Road shops and a footing beside a suburban semi pose different questions. Identify the wall and who occupies each side.

Party Wall Notices from £195 plus VAT per notice · Schedules of Condition & Party Wall Awards

Party Wall Act 1996RICS Regulated

Map what runs over the shop

The council guide records narrow Station Road shop units, some combined into larger premises within two- and three-storey terraces. A repeated exterior frontage does not establish the present internal divisions or demonstrate that the upper floors belong to one unit.

Request the current floor plan and available records for changes to openings, internal divisions and access.

Take a proposed connection between two retail units. Mark the opening on the ground-floor plan and follow its line up through every floor. The wall supporting accommodation above may be in a different position from the present counter or partition. For the Party Wall etc. Act 1996, establish whether the design cuts into a party structure, a question under section 2, with a party structure notice served under section 3 for relevant work. A description of the job as a shop fit-out gives the surveyor very little to assess.

Explain access to the relevant roof spaces and shared external components, including areas controlled by another occupier. Current legal use, ownership and repair responsibility require their own enquiries and cannot be inferred from the historical description of combined shops.

An existing opening needs a measurement as well as a photograph. If the work would widen it or change the support at one end, mark what the contractor will remove and where the replacement bears. Draw temporary supports, including any that need to stand in someone else's premises. The person who controls the shop keys may have no authority to agree access to the flat upstairs.

Working near a separate building

The guide describes five-storey redevelopment between Station Road and Garfield Road, combining residential accommodation with other uses and parking structures. Identify the particular flat and the enclosing building.

For a new lift pit or extension near a block, identify the footprint and depth of the proposed excavation relative to the nearest neighbouring building or structure. The engineer needs to state what is known about its foundations and how that information was obtained. Test section 6 against the dimensions. An open corner of a parking deck can be closer to the work than a line drawn to the main residential entrance. Identify it by structure and level.

An apparently continuous frontage does not reveal separate entrances, shared approaches or the current boundary behind the building.

Locate additions, outside walls and separate structures on the current plan and attach available records to each reported change. A repair document for one frontage should not be extended to rear components or adjoining buildings that it does not expressly cover.

A return wall behind a suburban pair

Addlestone is one of the borough's three main towns in the council's flood assessment, and for housing in the main settlements the SPD's 'formal suburban (town)' type covers homes built from the late Victorian to the early post-war period, generally before 1970, in terraces or semi-detached pairs on small or average plots. These are borough-wide traits in the SPD.

If one owner extends the kitchen towards the side boundary, ask where the existing flank wall ends, where the new wall would sit and how far its excavation extends. Section 1 concerns a new wall at the line of junction. It is a separate enquiry from one about cutting pockets for beams into a shared wall. A floor plan prepared for the kitchen supplier is unlikely to show the difference at foundation level.

Gather dated drawings and repair records for the individual dwelling, locating altered openings, extensions and replaced coverings. Distinguish visible brick, render or other finish from the construction behind it.

For a schedule of condition, a view along the neighbour's back wall may be as valuable as a close photograph of an existing mark. Include the junction between the original house and any later return. Note which face the camera shows, photograph finishes under consistent light where possible and describe obstructions. A shelf hiding a joint is a limitation on the record. Its presence says nothing about whether a crack continues behind it.

Council documents and private arrangements

Runnymede designated the Caxton Avenue Conservation Area on 1 October 2023, after consulting on an area at Caxton Avenue and Coombelands Lane. Its appraisal records that the road and verges of Caxton Avenue passed to a residents' company in 2001, and that restrictive covenants on the homes were still in force when it was published, so ask your solicitor about both.

Keep the planning file from Runnymede Borough Council separate from the engineer's construction issue. Building control may have its own submission. An award records matters within the Act and cannot give a private right of way over a verge, vary a covenant or authorise every change to an approved scheme. If the design changes after a notice has gone out, give the surveyor both versions with the revised wall or excavation clearly identified.

When the neighbouring property is yours

For a Station Road notice, tell the surveyor which floor is affected and which entrance serves it. Keep the envelope, drawings and date received. Our guidance for adjoining owners explains the response and appointment options. For a house, mark the nearest part of any rear addition on a copy if the designer's existing plan omits it.

Addlestone, Surrey party wall questions

What if a unit number on a notice covers two old shopfronts?

Show both frontages, the present entrance and the rooms you occupy on a plan. The surveyor can then check the affected structure and ownership before relying on the description in the notice.

Can photographs from a previous roof repair stand in for a condition schedule?

They can help date a visible change. Keep the originals and identify the roof slope and photographer. A current inspection records the surfaces accessible immediately before these particular works.

Should a drawing show the trench as well as the proposed kitchen wall?

Yes. The excavation may extend beyond the finished wall or include deeper pads. Ask for both outlines and a levelled section showing their relationship to the nearest neighbouring structure.

Get in Touch

Need party wall matters in Addlestone, Surrey? Call 020 7101 4590.

Request a Consultation

Addlestone, Surrey Party Wall Notice & Award Enquiry (Notices from £195 plus VAT per notice)