Party Wall Surveyor in Barons Court: Agreements, Notices and Awards

Party wall advice for Barons Court roof works, basement flats and work near a shared entrance. Identify the level affected on both sides of Vereker Road.

Party Wall Notices from £195 plus VAT per notice · Schedules of Condition & Party Wall Awards

Party Wall Act 1996RICS Regulated

A new roof above a concealed parapet

Hammersmith and Fulham's Barons Court Conservation Area Character Profile, approved on 14 December 1998 as supplementary planning guidance and updated after boundary amendments in 2004 and 2005, is the main source here. It describes building groups, never the condition of one particular home. The profile describes the terraces east of Vereker Road as noticeably grander than much of the locality. They are four storeys, or three storeys with semi-basements, and in most of them a strong balustraded parapet cornice hides the roof. Development moved westwards, and beyond Vereker Road the stucco gave way to plainer red brick terraces, generally of three storeys, some with basement flats or dormer windows in the roofs.

For a new loft, mark the structural work on a section through the adjoining roof. At what height would the builder form beam pockets, would the parapet be raised, and would the neighbour’s flashing have to come out before it can be reinstated? A drawing from the pavement will show the proposed skyline. The neighbours need a drawing at right angles to the shared wall to understand what happens at the junction while the roof is open.

Relevant work to a party structure is considered under section 2 of the Party Wall etc. Act 1996. A party structure notice for that work is served under section 3. Ask the designer to distinguish cutting into the wall from simply placing a finish against it. Identify existing chimneys, roof valleys or shared outlets at the precise point affected. For a roof spanning more than one flat, find out which interests the work concerns and who can provide access to the void.

From the front steps to the proposed excavation

The profile also records a row of three-storey houses with semi-basements on Beaumont Crescent built as part of an 1899 development, and Challoner Mansions, a four-storey mansion block with a semi-basement, built in red brick in 1898-1899.

The term “semi-basement” does not give a reliable founding level. Draw the front area, the floor behind it and the adjacent structure to a common datum. Dimension the nearest point of the proposed excavation and show any places where the dig is deeper, such as a lift pit or a drainage run if included. Section 6 has both distance and depth tests. A contractor who has measured the gap across the side passage has answered only part of that question.

At a garden return, make clear whether a proposed wall would be at the line of junction or fixed into an existing wall. Section 1 can apply to the new wall. Existing supporting structures may involve other provisions. If the planning drawings omit a neighbour’s side addition, supply a location photograph and ask for a revised plan. A diagram of the correct properties can save time otherwise spent discussing the wrong face of the building.

Identify existing finishes before the work starts

A local condition schedule might cover a cornice in a top-floor flat and the face of a parapet outside it. Ask the occupier to identify the room beneath the proposed beam bearing. Give the surveyor the roof access contact and the drawing that locates the junction from above. A close-up of a fine line in decorative plaster needs something in the wider view to place it, such as a bay, door opening or chimney breast.

At a lower entrance, identify the sill, steps and edge of the front area. Record which surfaces are visible behind a railing and which disappear behind lining, stored items or joinery. Photograph recent patch repairs as they appear on the inspection date. Keep any earlier contractor photographs separately labelled. An agreed description of the surfaces gives both owners a better starting point for a later comparison and avoids treating a concealed part as inspected.

When council boundaries and the works boundary differ

The profile dates the conservation area's designation to 10 April 1989 and records that in July 2004 properties in St Andrews Road and Greyhound Road were transferred to the adjoining Queen's Club Gardens conservation area. The council's web page links a separate, up-to-date boundary map; check the address against it.

The council record is useful for understanding the building and which design has permission. For party wall purposes, attach the structural drawing that shows the physical work at the meeting of the two properties. Record revisions and identify who authorised access. Freeholder permission under a lease, the building control process and planning consent remain separate from a surveyor’s award. If a scaffolding proposal uses a balcony belonging to a different flat, resolve that particular access question before the scaffold arrives.

A neighbour has sent a drawing of the whole terrace

Mark your flat and the part of the terrace that actually adjoins the proposed work. Send the notice as received, including every drawing, and the date on which it reached you. The adjoining-owner service explains what can happen next. If your concern is a concealed valley or a previously repaired ceiling, say so at the outset and ask for it to be identified in the condition inspection arrangements.

Barons Court party wall questions

What should I send for proposed work at Challoner Mansions?

Identify the flat, floor, entrance and adjacent rooms. Add the lease plan, the structural detail for the change and the management contact for common parts. Give the surveyor an opportunity to identify any further owners or spaces to consider.

Does a balcony offer automatic access to inspect the parapet above?

Establish who can authorise entry and how a safe inspection could be arranged. A balcony that looks suitable from the street may belong to another dwelling, have limited access or provide an incomplete view.

Why retain a roof drawing after the builder changes the detail?

Keep the issue referred to in the party wall documents so the surveyor can compare the change. A revision to a flashing, bearing or temporary support can alter the operations beside the neighbour even when the overall roof shape looks much the same.

Get in Touch

Need party wall matters in Barons Court? Call 020 7101 4590.

Request a Consultation

Barons Court Party Wall Notice & Award Enquiry (Notices from £195 plus VAT per notice)

We use these details to respond to your enquiry. Read our Privacy Policy.