Condition and repair decisions in Borehamwood
The sources below describe particular buildings and parts of the area at their publication dates. Use them to shape the inspection brief and repair questions; they do not establish your property’s current condition or designation.
The draft codes place the small historic core at Drayton Road, Furzehill Road and Mildred Avenue, where properties are typically two storeys with gabled or hipped roofs, light render and brick walls and tiled roofs, and they note that numerous properties have undergone extensions.
Around the edges of the town, the draft codes describe extensive post-war semi-detached and terraced local authority housing, generally two storeys of brick under tiled roofs, along wide, tree-lined streets with front gardens and large rear gardens.
Roofs and high-level details
For the roofs or upper-level features identified in the documentary descriptions, agree safe viewing positions and access before the visit. Separate an observed defect from an element that could not be inspected, and identify any further access needed before a repair scope or cost allowance can be reliable.
Materials and repair choices
Where these materials survive at the property, provide records of replacements, repointing and earlier repairs. The condition report considers the visible fabric and suitable next steps within the brief; check the address-specific heritage controls before specifying changes to protected details.
Altered and retained elements
Where the building has been altered, distinguish original and later elements on the available drawings. Changes in layout or fabric can affect access and repair interfaces; missing records and concealed connections remain matters to confirm rather than evidence of compliance or a particular defect.
Local research and sources
- Elstree & Borehamwood Neighbourhood Plan, Appendix A: Design Codes and Guidance, pre-submission draft (AECOM, November 2025)
- Hertsmere Borough Council, Conservation areas in Hertsmere
- Hertsmere Borough Council, Planning and Design Guide (supplementary planning documents)
These documentary descriptions were retained from the maintained local research. Supply current plans, later alteration records and repair history where available; the survey reports the actual accessible condition on its own date.
Inspection extent and access
Agree whether the inspection covers the whole building, external envelope, common parts, specified rooms, selected elements or a defined sample. Record the client, property boundary, purpose, documents and inspection date. A whole-building brief does not imply access to every flat, roof void, facade junction, service installation or concealed component.
The usual inspection is visual and non-intrusive. Opening-up, testing, specialist access and further investigation require separate agreement. Damp marks, cracks or damaged finishes are observations; their appearance alone does not establish a single cause.
- Arrange permissions and access with owners, occupiers and managing agents, including roofs, secure areas, plant and individual units where included.
- Record inaccessible areas, the effect of each restriction and appropriate next steps. Uninspected elements remain unknown; absence of visible evidence is not confirmation that concealed fabric is sound.
- General visual observations of services do not include electrical or gas testing, structural calculations, asbestos surveys, fire-risk assessments, external-wall appraisals or an exhaustive compliance audit.
What the condition report contains
The written report supports the agreed decision at the inspection date. It identifies the building and accessible areas, records observations by element or location with photographs where appropriate, and explains defect significance, repair priorities and further investigations within the brief.
- Building description, agreed extent and inspection date.
- Condition findings and supported technical explanations, distinguishing observation, documentary information and professional opinion.
- Repair and further-investigation priorities, relevant maintenance considerations and practical next steps.
- Access limitations, assumptions and unresolved matters, with cost advice and discussion arrangements where agreed.
Condition and urgency are different: an element’s state does not by itself determine when work must happen. Where the agreed report uses ratings, its own legend explains them. An uninspected item remains visibly unknown. This bespoke appointment has no universal RICS numbered or traffic-light scale and is not automatically a Level 1, 2 or 3 Home Survey.
Repair priorities and cost advice
Indicative repair allowances are included only where expressly agreed in the written appointment. A detailed cost plan, contractor quotation and forward maintenance programme are separate scopes.
Where an allowance is commissioned, its basis and date, assumptions and uncertainty must be clear, including relevant treatment of access, preliminaries, professional fees, contingencies, inflation and VAT. It is a budget allowance, not a contractor quotation, tender price or detailed cost plan. Reliable pricing may require quantities, opening-up or specialist input.
The condition report can inform future maintenance planning. A costed five-to-ten-year programme, tender documents and an ongoing asset register are not included automatically; a planned maintenance programme has its own scope.
Starting fee and the written quotation
£850 professional fee + £170 VAT at 20%.
The published starting appointment is for a single residential house, flat or small commercial unit, with the accessible building or elements agreed in writing. It includes a visual, non-intrusive inspection and a written condition report with repair and further-investigation priorities within that brief.
The written quotation confirms whether the starting fee applies to your property. Size, inspected extent, access, documents, reporting detail and agreed discussion arrangements affect the final fee. It is not a fixed whole-block, estate or multi-building price.
The quote must identify any agreed repair cost advice. A forward maintenance programme has a separate scope and fee.
Blocks, mixed-use assets, complex access and multi-building programmes are quoted individually. A desktop document review does not substitute for the physical inspection in this offer. Inspection availability, report timing and follow-up discussion arrangements are agreed for the actual instruction.
A published example with a defined scope
West Hampstead external condition appraisal: an example from West Hampstead, not a project claim for Borehamwood. The appraisal concerns external fabric; flat interiors were outside the scope and the separate maintenance programme remains a draft.
Read the related block-repairs appraisal
The available redacted PDF is the Block repairs technical appraisal, West Hampstead NW6. It compares external-works options and cost control and expressly does not repeat the diagnosis in the separate External Condition Report. It is a related appraisal, not the complete original condition report or a universal starting-fee sample.
The issued appraisal is published with the client’s permission. Client identifiers, signatures and commercial figures are redacted and the original photographs are withheld. The findings apply to that property only. Its budget figures use their stated September 2026 basis; they are not current quotations for another building.
This is a direct download of the published 14-page appraisal. It does not request or promise automatic delivery of another report.
From the first brief to your report
- Brief: explain the decision, property, client role, known concerns, existing information and desired date.
- Written scope and quote: confirm the inspected elements, exclusions, cost advice, report use, VAT-inclusive fee and any follow-up discussion.
- Access: agree occupancy arrangements, permissions, safe access and any sampling or restrictions before the visit.
- Inspection: assess the accessible agreed elements on the recorded date and distinguish findings from matters requiring confirmation.
- Report and discussion: receive the identified report issue with priorities and limitations, then discuss the findings under the agreed arrangements.
The report is a standalone appointment. Further investigation, a maintenance programme, specifications, tendering and contract administration can be considered separately if they support your next decision.
Choose the appointment that fits the need
- Schedule of condition: A factual condition record for an agreed boundary and purpose.
- Specific defect investigation: Closer investigation of a particular concern; a general condition record is not a prerequisite.
- Planned maintenance programme: A forward plan of work and expenditure, separately scoped.
- Home survey advice: An appropriate residential survey for the property and client’s requirements. Level 3 can serve a buyer or owner; it is not restricted to purchasers.
- Commercial technical due diligence: Acquisition advice where that transaction is the actual instruction.
- Stock condition programme: Consistent component data across multiple assets.
- Housing-association condition programme: A separately defined portfolio and asset-management brief.
- RICS Level 1 Condition Report: The separate formal Home Survey product; not another label for this bespoke service.
Technical repair advice does not decide lease liability, service-charge recovery or a legal dispute. Relevant lease and document review and competent legal advice may be needed. A dated record alone does not establish historical damage causation.
For subsequent works, consider a separate specification and tendering brief or contract administration appointment.
Practical questions
What decision can a building condition survey help with?
It assesses the agreed building or elements at a stated date, with condition findings, repair priorities and technical advice within the brief. Owners, managing agents, freeholders and occupiers can use it to decide what needs repair or further investigation.
How does this differ from a schedule of condition or planned maintenance programme?
A schedule of condition is a factual record for a defined purpose. This survey includes technical repair and further-investigation priorities within the brief. A planned maintenance programme is a separate forward plan of work and expenditure. This service is not automatically a formal RICS Level 1 Condition Report.
What can be inspected in a flat, block or commercial building?
The appointment can cover agreed rooms, common parts, external fabric, a building or a defined sample. A whole-building description does not imply every flat, roof void, service installation or concealed junction is accessible. The report records what was actually inspected and the restrictions.
Are repair priorities and cost allowances included?
Repair and further-investigation priorities form part of the agreed condition report. Indicative repair allowances are included only where expressly agreed in the written appointment. A detailed cost plan, contractor quotation and forward maintenance programme are separate scopes. Any allowance states its basis, date and relevant assumptions, including VAT and access where material.
What happens if the roof or some units cannot be accessed?
The report records the restriction, its effect and appropriate next steps. An uninspected element remains unknown. Specialist access, opening-up, testing or a return visit need separate agreement; the starting fee does not automatically include them.
Does the report determine who pays for repairs?
It provides technical condition and repair advice. It does not determine lease liability, service-charge recovery, legal fault or historical damage causation. Relevant documents and competent legal advice may be required.
Can it be used for acquisition, tendering or service-charge decisions?
Agree the intended decision, recipients and reliance before appointment. An acquisition may need a suitable Home Survey or commercial technical due diligence scope. Tender documents, detailed cost planning and service-charge or legal advice are separate. Circulating the report does not create unrestricted third-party reliance.
What follow-up is available and what affects the fee or reporting programme?
From £1,020 including VAT: £850 professional fee + £170 VAT at 20%. The starting appointment is for a single house, flat or small commercial unit within an agreed extent. Size, access, documents and reporting detail affect the quote. Inspection availability, report timing and follow-up discussion arrangements are agreed for the actual instruction. Further investigation, maintenance planning and project services are separately agreed.
What should I include in a Borehamwood enquiry?
For the roofs or upper-level features identified in the documentary descriptions, agree safe viewing positions and access before the visit. Separate an observed defect from an element that could not be inspected, and identify any further access needed before a repair scope or cost allowance can be reliable. Give the address, client role and decision the report needs to support.
Request a building condition survey quote
A short initial brief is enough. Describe the property and decision in your own words; the additional questions are optional.
Professional guidance and related reading
The PPM standard helps distinguish present condition assessment from future maintenance planning. The TDD standard concerns that separately scoped service. Neither turns every condition survey into a complete PPM or TDD instruction.
- RICS: planned preventative maintenance (a separate forward-planning service)
- RICS: technical due diligence of commercial property
- HSE: arranging an asbestos survey
Home-purchase building-survey checklist and commercial acquisition/TDD guidance explain those separate decisions; they are not the complete specification for this service.