Behind the Myddleton Road shopfront
Haringey publishes a study of conservation and regeneration on Myddleton Road. Its account explains why the building behind a shop display can be a more useful starting point than the shape of the current frontage.
The study says that from the 1950s through to 1974 private firms replaced some of the larger Victorian houses, then in disrepair, with blocks of flats for multiple occupancy. On Myddleton Road it describes shop units at first contained within a largely residential format, until by the early 1900s a number of ground-floor shop units extended into the street, doing away with the narrow fenced gardens. A street's age therefore says little about a given block, and a flat above a shop may sit over a later front extension. Ask for the block's build date and maintenance records, the approvals history of the shopfront and upper floors, and which roof areas can be reached.
If a shop is to be opened into the premises beside it, show where the original front wall stood and where the newer frontage begins. Record what sits above the opening at both positions. A steel inserted into a dividing wall, or masonry removed beneath an upper flat, raises questions about support during the work and about ownership. A lease drawing prepared to identify commercial floor space may leave the structural relationship unresolved.
Draw the house that stands there now
The study records about twenty large houses, gardens and summerhouses built by 1859 in Clarence Road, Truro Road, Nightingale Road and Commerce Road, some still standing as large semi-detached villas, with a smaller terrace house format adopted with the coming of the railway. Bowes Park station was built in 1880.
For changes to one of the larger homes, locate the old and new staircases, shared chimneys and any division into flats before deciding which part of the Party Wall etc. Act 1996 to consider. A party floor between flats can matter as much as the wall between street numbers. Section 2 concerns rights to carry out specified work to party structures. The corresponding party structure notice is under section 3. The documents should describe the particular opening, bearing or removal and the arrangement above it.
For a terrace extension beside a smaller plot, the work might instead involve a new wall at the line of junction under section 1, excavation under section 6, or both. Show the neighbour’s original rear wall and any later extension. Ask the engineer to explain what is known about the base of its foundation and how the proposed excavation compares. A single distance to the boundary is insufficient to make the section 6 assessment.
Where proposed digging meets existing infrastructure
The Myddleton Road study notes the New River tunnel at Bowes Park, built between 1852 and 1859 and Grade II listed in 1974, with green public and semi-private land above it near Myddleton Road.
A tunnel noted in a neighbourhood history is a reason to check the records for a particular proposal. It does not establish a structure’s distance, depth or legal relationship to the works. If the designer believes a utility or other infrastructure lies nearby, ask for the source of its position and the contact handling the relevant permissions. Keep those enquiries distinct from the assessment of neighbouring buildings. Send the party wall surveyor the dimensioned project drawings and identify any part of the design still awaiting specialist input.
Ask the planning authority about current permissions or designations for the address. Keep the planning drawings, structural details and building control records identified by date. If a landlord’s consent is needed, retain the approved documents under the lease as a separate record. An award under the Act cannot provide these other permissions.
A condition record above occupied premises
For work below a home, agree a time with the person who can let the surveyor into the relevant rooms upstairs. The shopkeeper may be able to open a stockroom but have no means of reaching the upper landing. If the proposed works change a support near the original frontage, locate the corresponding floor and ceiling in both premises. Use window bays, stair position and the line of the original wall to identify the photographs. Those references remain recognisable if a display or shelving unit is moved.
Document signs of earlier patching or decoration. If an occupier remembers when a crack first appeared, record that as their account with its date. A schedule of condition shows what could be seen on the visit. If the plaster is later stripped, keep any new observation distinct from the original record. Arrange a route for either owner to bring an unexpected finding to the appointed surveyor while its position is still clear.
Receiving notice in a remade building
A resident in a replacement block on a street of older houses may find the neighbour’s plan still shows the former footprint. Send a marked copy with the original notice and record of receipt. Our adjoining-owner guidance sets out response options. Identify the flat entrance, any shared outside space and the part of the block nearest the work. Give access contacts only for the places where they can actually arrange entry.
Bowes Park party wall questions
Would a drawing for replacing the shopfront also cover an opening in the dividing wall?
It may show the appearance of the new frontage without locating the loadbearing work behind it. Ask for the opening size, supports, location relative to the flat above and details of any intended work to a party structure.
What should the neighbour of a side extension check first?
Locate your own house and any rear additions on the plan. Note where the new wall will stand and how far the digging extends. If a level is shown for your foundations, ask its basis.
Can the two households share a pre-works record?
The inspection scope can identify rooms on each side and the people able to provide access. Confirm who will receive the record and what it will cover before inspection, including any common stair or rear roof that matters to the work.