For work in Chertsey’s narrow Guildford Street plots, locate the upper entrance, back lane and closest adjoining building on one plan before serving notice.

Party Wall Notices from £195 plus VAT per notice · Schedules of Condition & Party Wall Awards

Party Wall Act 1996RICS Regulated

Which entrance belongs to the part affected?

Runnymede's Chertsey Conservation Area Appraisal of January 2020 describes Guildford Street as the main commercial street, its buildings hard against the pavement on narrow frontages that survive from the town's medieval origins; upper-floor offices and homes are reached by doors beside the shopfronts or from the rear. London Street is mainly residential, with lower-status terraced houses on narrow pavements towards its western end, while Windsor Street has larger plots and many five- or six-bay buildings, most of them once large private houses and many now in office use.

Request the unit plan and available conversion or common-work records. Confirm whether roof spaces and other relevant areas can be viewed through the unit or need separate access. Arrange the appropriate contacts rather than assuming that the residential keys also allow entry through separately occupied parts below.

For an opening between adjoining ground-floor units, mark the wall, the floor above and all new bearings. If part of the work cuts into a party structure, the section 2 rights in the Party Wall etc. Act 1996 and the notice under section 3 are relevant. An elevation showing two matching shopfronts cannot settle whether the upper floor extends over the line between the shop doors. Give the surveyor the affected ownership and occupancy information as well as the structural detail.

Where work near a stair or access door changes the route into a home, show how the contractor intends to maintain safe access or what temporary provision is proposed. Document the practical arrangement separately from the right to carry out the work. Permission to enter and compare the walls for a schedule is different from permission to use an adjoining shop to put up props.

Locate the far end of a Guildford Street plot

The Chertsey appraisal describes narrow Guildford Street frontages with long plots and secondary lanes branching away from the principal streets. Identify any rear rooms, separate unit or outbuilding expected within the proposed appointment.

Confirm who can provide entry to rear and side areas, including locked or separately occupied spaces.

A proposed workshop or kitchen extension may be nearer the building reached from a side lane than the house with the next street number. Section 6 looks at the distance and depth of the excavation in relation to adjoining buildings or structures. Show that actual neighbouring building on the engineer's plan, including any return. Section 1 separately addresses a new wall at the line of junction. Record the proposed wall position and the excavation outline with dimensions rather than using one thick line to stand for both.

If an old lane gives the building owner access partway along the rear wall, identify the gate beyond which the site cannot presently be entered. The building position seen from there can be measured; an unseen foundation level should be shown as unknown until suitable evidence is available. If deeper pads are added to the scheme, update the section and ask what changes in the statutory assessment.

Brick parapets, rendered fronts and the baseline record

In the conservation area, brick is the predominant material, generally red with some yellow or buff, and render is common, sometimes applied to the front elevation only. Most roofs are slate or clay tile, some hidden behind brick parapets.

The window account distinguishes sashes, casements and bays, with gabled and square-headed dormers also recorded. A general description of new windows may cover only frames while leaving surrounds, dormer cheeks or adjacent roof work outside its scope.

For a dormer beside a party wall, a record of a new window frame does not establish what lies behind the cheek beside the neighbour's roof. Ask for the work specification and planned weathering, and identify the adjacent upper room or void. A schedule should record the accessible ceilings, visible junction and the limitations of a roof-level view. An annotated photograph with the parapet, opening and direction identified is easier to use for comparison than a cropped detail of a crack.

If exterior refurbishment is reported, locate the work by elevation and finish. A fresh front surface should not stand for the history of the remaining walls or concealed fabric.

Drawings for a different purpose

Runnymede Borough Council's conservation appraisal describes the central streets and sets their development in context. Find the current planning and heritage decisions for the individual address. Planning approval, the building regulations process and any consent under a lease do different jobs from the party wall procedure. Keep the date and revision of the plan that accompanied a notice, the final design and any award. Ask the surveyor to review a later change to an opening or foundation before anyone assumes the original documents cover it.

A notice that names only the downstairs business

If you own the upper home, mark the stair, your rooms and any area that projects over the works. Keep the original notice, all enclosures and when you received them. Our guidance for adjoining owners explains the responses available and the information needed if a surveyor is appointed. Tell the inspector whether entry is from the front door or from the rear lane.

Chertsey, Surrey party wall questions

Can a proposal at the back of a London Street terrace affect a property on another road?

Yes, depending on the work and arrangement of plots. Trace the actual adjoining structures and owners on the site plan rather than relying on the order of postal numbers.

Which drawing should show a planned cut into an upper wall?

Use an engineer's detail through the proposed cut, its bearing and adjacent floor or roof, identified against the current layout. The planning elevation may not show the depth of the intervention.

How should the neighbour describe a mark below a rendered parapet?

Identify the face, level, direction and date of the observation, and keep an overall view with any close photographs. If the roof side was not visible, state that limit rather than assigning a cause.

Get in Touch

Need party wall matters in Chertsey, Surrey? Call 020 7101 4590.

Request a Consultation

Chertsey, Surrey Party Wall Notice & Award Enquiry (Notices from £195 plus VAT per notice)

We use these details to respond to your enquiry. Read our Privacy Policy.