Party Wall Surveyor in Colliers Wood: Agreements, Notices and Awards

Different generations of Wandle Bank cottages and terraces sit close together. Check the rear wall, roof and adjoining structure before serving notice.

Party Wall Notices from £195 plus VAT per notice · Schedules of Condition & Party Wall Awards

SW19Party Wall Act 1996RICS Regulated

Compare the Wandle Bank groups before drawing the rear works

Merton's February 2007 post-consultation draft appraisal for the Colliers Wood sub-area of the Wandle Valley Conservation Area records surviving early to mid 19th century millworker cottages in Wandle Bank, two storeys high in yellow stock brick with hipped slate roofs. It notes that some cottages have had their slate roofs replaced with less appropriate concrete pantiles and that many have been extended to the rear.

The draft records Wandle Terrace at 1–7 Wandle Bank as rebuilt in 1977 following an earlier late-nineteenth-century group. It describes yellow brick and a gabled roof with concrete tiles, and separately identifies 1990s houses at 1a–1d. These dates prevent the appearance of a small terrace being used as proof that all its fabric is Victorian.

When proposing to extend one house, identify the original return and every later projection beside it. Draw the present building on both sides where accessible. The dividing wall between the original cottages might continue as a different form of structure behind them, or the modern return may stand independently of the neighbour. Show where the new work would cut, raise, abut or stop short of the existing masonry. The historic description explains why differences are worth checking but cannot resolve the detail at one garden.

For specified works to a party structure, section 2 of the Party Wall etc. Act 1996 identifies rights and section 3 provides for the party structure notice. A proposal for a new wall on the line of junction is considered under section 1. Put both details on the works plan where relevant. If the builder wants to remove an existing roof and weather an exposed neighbouring wall, identify the affected surface and temporary protection as well as the finished junction.

Where old and new residential structures meet

The same draft says the former mill building was converted to residential use during the 1990s, and that a late 19th century Italianate building on a former laundry site was divided into flats in 1981.

At a junction between a conversion and modern flats, the most useful starting drawing often shows the level of the separating floor and the external face of the earlier building. Mark the permanent works and the position of temporary props. The person able to provide building management drawings may not control entry to the room on the opposite side, so arrange both records and access. Check which owner or leaseholder holds the affected interest before settling the recipients for notice.

The excavation provisions in section 6 turn on the proposed dig, its depth and the adjoining structure. Show the nearest building or structural return, not simply the boundary or river. Put any existing basement, drain chamber or previous underpinning detail on the section if there is property-specific evidence for it. Where foundation depth is unknown, say so. The presence of the Wandle is not a foundation investigation and supplies no measurement for testing the works.

A pre-works record at the High Street

The draft describes 4–8 Merton High Street as partly timber-framed, with rendered brick at the front and weatherboarding behind. It records an asymmetric mansard concealed by a parapet, upper-floor residential conversion in the 1990s and replacement of the roof while retaining its form.

For alterations beside such a frontage, organise photographs by which part of the building they depict. Use a general view of the return before close photographs of a change from render to weatherboarding, or of an existing mark on a ceiling below the roof. Note whether the view is at eye level, across a yard or from the street. Appearance cannot establish the condition of concealed timber. Record when access prevents an observation, especially if a later question may concern the same junction.

If an inspector reaches the rear only through a neighbouring shop, office or flat, identify who can open the premises and what times are practical. A separate construction access request should show where any equipment or boarding would stand and how the occupier’s route would be kept clear. Passing through a property for a schedule visit does not itself agree a future working area.

Which Merton document answers which question?

Merton's Character Study, adopted in June 2021, says the town centre remained a small riverside hamlet until the late 19th century, but by 1914 the area was densely developed, with the tube station opening in 1926. It lists attractive Victorian and Edwardian terraces among the area's key features, and for the neighbouring Haydons Road area it describes Victorian two storey terraced houses alongside cul-de-sacs and town houses.

Merton's 2007 post-consultation draft gives particular historical examples. Check the council's current planning and designation record for the exact building, then identify any permission or building control information for the work actually proposed. Landlord or other private consent may also be needed. Keep the decision and dated drawings alongside a notice or party wall award. If a planning change moves the rear wall or alters the depth of the dig, flag it before relying on the earlier works description.

If you own the adjoining cottage or flat

Keep the notice, every drawing and the date you received them. Identify a rear room, converted roof or separate access that appears missing on the plan. Read our guide for adjoining owners for the reply options and appointment process. Give the inspector enough information to distinguish the older building from the newer rear range when arranging a visit.

Colliers Wood party wall questions

Both frontages are in yellow brick. Can the neighbour's roof drawings be used for mine?

They can help identify points to check. Establish when the actual group was built or rebuilt, obtain drawings for the property and verify the current junction before specifying how it should be altered.

Which wall matters for a footing proposed by the river?

Identify the nearest adjoining building or structure and the relationship between the excavation and its foundations. A landscape feature or garden boundary on its own cannot answer that question.

What if the only pre-works photo shows the entire High Street elevation?

Retain it as an overview. Agree closer photographs of the accessible side and rooms relevant to the work, an annotated plan and a record of any areas that could not be seen.

Get in Touch

Need party wall matters in Colliers Wood? Call 020 7101 4590.

Request a Consultation

Colliers Wood Party Wall Notice & Award Enquiry (Notices from £195 plus VAT per notice)

We use these details to respond to your enquiry. Read our Privacy Policy.