This page is for a buyer or owner still deciding which of our surveys fits a Finchley property. If the home is older, altered or awkward in plan, the Finchley Level 3 guide is the detailed route.
Level 3 inspections are always made by Savas Bulduk MRICS himself. The report arrives within about 5 working days of the visit, and going through it by phone with Savas is included in the fee. Get a quote for a Level 3 inspection, or write with the address and your question if you cannot tell which service applies, and we will recommend one.
What each survey is for
A detailed assessment before purchase
Level 3 is the survey to commission when your questions concern construction: how the building is made, what has gone wrong and which repairs come first. RICS ties it to large, older or run-down properties, unusual or altered buildings and major works planned after purchase. Around Finchley that might be a Victorian cottage, an Arts and Crafts semi, or a flat in a block of the 1930s.
A conventional home in reasonable condition
A Level 2 Home Survey suits familiar construction in fair condition with a simple layout. Judge the whole building rather than one room: a new bathroom or an up-to-date gas certificate says nothing about the roof, the walls or the structure.
An existing defect or a commercial instruction
When a stain, crack or leak in a home you own keeps coming back, building pathology is the place to start; say which room, when it appears and what has been tried. For a shop, office or investment block, ask about technical due diligence, while the building surveying service guide maps what else is on offer.
Agreeing the scope
Before the visit, the appointment records which parts will be inspected, what the report will contain and what cannot be reached. Valuation, approval of hidden work, repair design and legal rights fall outside a condition survey, which is why every report lists its limitations.
Local questions that help choose the service
Is the property in one of the small conservation areas?
Barnet's 2013 appraisal calls Finchley Garden Village entirely residential, with 51 properties, and its undated Glenhill Close appraisal says that area covers about 1.1 hectares and comprises 66 flats. Barnet's appraisals date the designation of Finchley Garden Village to November 1978 and of Finchley Church End to July 1979. Areas that small may leave a neighbouring street outside them, so the council's boundary map, not a postcode, decides whether conservation rules touch the address. The Finchley area guide lists the other local services.
Is it a cottage, a pair or a flat?
The Garden Village appraisal says two basic house types formed the basis of the layout, with variety introduced by detailing each pair differently. A pair can therefore look alike yet differ in bays, windows or extensions, so say which half is for sale. For a flat, state its floor, its entrance and what it shares. The Glenhill Close appraisal describes very generous communal lawns and verges with established shrubs, hedges and mature trees around its blocks, so shared grounds and tree management belong in the brief.
Have windows, roofs or rainwater goods been changed?
The same Garden Village appraisal says most houses still have their original clay-tile roof coverings, that rainwater goods were originally cast iron painted black, and that many houses have lost their original leaded lights. Barnet's 2011 Church End appraisal lists replacement of windows, doors and roofing materials, and removal of front boundary walls and fences, among alterations outside planning control. Ask when any such work was done, by whom and with what paperwork; a history of change points towards Level 3.
Might a lower room or groundwater be a factor?
The Garden Village appraisal says the land falls from east to west with the Dollis Brook at the bottom of the valley. Basements, the 2008 North London flood assessment observes, can be flooded from several different sources, rivers, tides, surface water, sewers or groundwater, depending on where they are. Barnet's Church End appraisal calls the local soil heavy, poorly drained clay, a general description to set beside any history of cracking or damp at the address. Mention any cellar or lower room, and whether the house sits low on a slope, when you enquire, and ask Barnet what basement policy applies now.
See the work and the reporting format
No case study from Finchley has been published. A comparable one is our Kentish Town NW5 Level 3 survey, which dealt with a mid-Victorian terrace of robust traditional construction. The page turns on its butterfly roof and the gutters between slopes, along with chimneys, stucco and boundary walls. Longstanding cracking beside the shared rear chimney breast was judged in context, with a seasonal monitoring period advised and a coordinated programme of external maintenance.
A redacted Level 3 report on a West Kensington period flat is available as a sample: its Section 2 summary leads into a Section 13 schedule of actions, and the redactions mean you see form and order, not findings about your own property.
Surveyor, fee and appointment
Before you instruct, you can read about the surveyor, Savas Bulduk, on his profile page and check the firm's standing on the RICS regulation page.
Level 3 is priced at £950–£2,000 plus VAT. Start with the Finchley calculator for a rough figure, then ask for a fixed quotation through the Level 3 quote link. Other services are scoped individually, so describe the job before choosing.
To price the work we ask for the listing, a plan, the probable age, any loft room, dormer or extension, your timetable and the seller's contact. On the day, roofs and high-level areas are checked by drone where conditions and flying rules allow, and a budget-minded buyer can ask for rough repair-cost estimates too.
Choosing a service: common questions
Does a mortgage valuation do the same job as a survey?
No. According to RICS, the lender's valuation protects the lender rather than you and is less detailed than a survey. To have defects, repairs and upkeep explained, commission a survey and tell us the decision you face.
The seller has paperwork for the building work. Is Level 2 then enough?
Not automatically. A certificate proves one job was signed off, not that the rest of the building is sound. A home that has been extended, altered or divided, or one you plan to rework, may still call for Level 3, so send the papers with the address.
Which service fits damp that keeps returning in a flat I own?
A defect enquiry through building pathology is the natural first step. Name the affected rooms, note whether the damp follows the weather and list earlier repairs, and the investigation can aim at cause and next action rather than produce a purchase report.
Level 2 or Level 3 for a flat in a 1930s block?
It turns on the block and the flat. A well-kept flat of conventional construction, little altered, may suit Level 2. Steel windows, shared flat roofs, dormers added later or planned works favour Level 3. Tell us the layout and what the lease makes shared.
How do I commission a survey of premises that are not a home?
Use technical due diligence and describe the intended use, the tenure and the transaction. The scope is tailored to that building and decision, and its fee sits outside the Level 3 range for homes. We confirm instruction and fee before you appoint.
Last updated: .
Sources
Barnet: Finchley Church End Conservation Area Character Appraisal and Management Proposals, 31 August 2011, Barnet: Finchley Garden Village Conservation Area Character Appraisal and Management Proposals, 26 September 2013, Barnet: Glenhill Close Conservation Area Character Appraisal Statement, undated, North London Strategic Flood Risk Assessment, August 2008, prepared for the North London Waste Plan and RICS: house surveys, the costs, types and benefits of an RICS Home Survey frame the service choices and the questions to answer first.