Party Wall Surveyor in Godstone, Surrey: Agreements, Notices and Awards

A Salisbury Road terrace, a Priory bungalow and a William Way flat need different drawings when new structure meets an adjoining Godstone property.

Party Wall Notices from £195 plus VAT per notice · Schedules of Condition & Party Wall Awards

Party Wall Act 1996RICS Regulated

Locate the beam above the Salisbury Road rooms

Outside the historic core, the same guidance describes Victorian semi-detached and terraced houses along Salisbury Road, often with contrasting red and gault brick headers or corners, and mostly 20th-century development in the rest of North Godstone, including a former council estate of mainly semi-detached brick houses. In the village centre, some two-storey buildings have rooms in the roof and dormer windows, and one close outside the conservation area mixes cross-gabled bungalows with habitable upper floor rooms and two-storey houses. South Godstone is mainly 20th-century terraced, semi-detached and detached housing.

On a terrace, an engineer proposing to knock two rooms together needs to show where the ends of the new beam will bear. Identify the wall shared with the adjoining home, the internal wall to be removed and any support already installed after an earlier alteration. The cut for a bearing can raise a different question from demolishing an internal partition. Test the specific work against section 2 of the Party Wall etc. Act 1996 and serve a section 3 party structure notice where appropriate.

Collect available plans for removed walls and enlarged rooms, retaining their dates and the parts of the house to which they refer. A document covering an earlier alteration should not be treated as the record for a later opening simply because both affect the same room.

Take a site sketch into both homes if access is agreed. Mark the relevant chimney breast, room division and window on each floor rather than continuing the first home's arrangement through the boundary by assumption. The neighbour may have a different opening or a later support. Ask the engineer to identify areas where that information affects the method for supporting the retained masonry.

Rooms in the roof and sections of different height

Ask for the drawings associated with any roof-room conversion, dormer or changed stair arrangement. Compare them with the current plan, noting any difference in openings or circulation. A later extension may belong to a separate phase, so keep its documentation distinct from the original upper accommodation and from more recent roof-covering repairs.

Arrange access to relevant hatches and rooms and describe fixed linings that prevent a view behind the finished surface.

In a cross-gabled bungalow with an upper room, identify which roof slopes surround the room and where the ceiling changes from level to sloping. A pre-works visit should locate existing cracks or repairs relative to these fixed features. Include a wider photograph that identifies the room before the close view of a ceiling joint. If a wall is lined and there is no way into its eaves, say where inspection stopped. A photo taken from a hatch is evidence from that viewpoint.

Godstone's neighbourhood design work describes the older village fabric as well as its twentieth-century residential streets.

The design guidance prepared in October 2023 for Godstone's neighbourhood plan, then in draft, finds most of the village centre inside the conservation area, with a built character informed by listed buildings and local materials: oak framing, clay tiles, brickwork, locally sourced Hearthstone, tile hanging and black timber framing exposed on white render. In Church Town it describes mostly large detached buildings, many from the 18th century.

Request dated descriptions of wall repairs, replacement joinery and any changes to openings. Place each record beside the elevation it concerns.

A side addition approaching a different structure

For a side extension beside an adjoining garage or outbuilding, put the nearest face of that structure on the excavation section. Section 6 looks at the depth and separation of the proposed dig. A tape dimension from the new room to the neighbouring house could miss the closer structure. Identify the deepest trench or pad and say how the adjoining foundation information was obtained. If the footing steps, show the dimension at the critical part.

Section 1 concerns a wall built at the line of junction. The instruction should distinguish that intended line and wall from a proposal to alter a wall which already divides two properties. Keep copies of the plans and title information supplied. If the position is disputed, tell the surveyor instead of assuming an old fence or wall face provides a definitive line.

Before booking access or starting on site

In a William Way apartment, record the flat number and floor along with the entrance serving the unit. Which room lies above the work and who can admit the inspector to the common stair are practical questions early in an appointment. Tandridge District Council holds the planning and conservation records relevant to a particular address. File planning permission, building control documentation and any private landlord's consent alongside, but separately from, the party wall notice or award.

If a drawing changes after an opening-up inspection, label the revised support clearly and let the appointed surveyor review its relationship to the work already notified. Agree the access route for a condition visit independently of any proposed construction use of adjoining land.

If your house or flat is next door

Send the notice, delivery date and any record showing the wall since an old chimney or internal partition was removed. Our guide to adjoining-owner appointments explains response options. Identify which room, roof space or shared entrance is affected, and mention restrictions on reaching it before a visit is arranged.

Godstone, Surrey party wall questions

Is a plan of the ground floor enough for a roof alteration in a bungalow?

Show the upper room, any remaining void, the dividing wall and the point where the new support bears. A change of roof shape can leave the critical connection outside the room shown on the floor plan.

What should the schedule say about different finishes to the same wall?

Record the finish and visible condition separately on each accessible side, with photographs tied to the location. Identify any concealed section and retain previous repair records as dated background.

Get in Touch

Need party wall matters in Godstone, Surrey? Call 020 7101 4590.