Starting with the opening in a railway-era semi
The village design statement, compiled by local people and approved by Tandridge District Council as Supplementary Planning Guidance, traces today's village to the merging of two small medieval settlements, the Old Town beside the church and Plaistow Street, in the late nineteenth century.
The statement says the oldest buildings survive from the Middle Ages and are timber framed, usually with tiled roofs, though the framing has often been covered by tile hanging with brickwork to the ground floor walls. The High Street developed from the middle of the 19th century in brick with slate roofs, often in two-tone yellow and red brickwork, and the late 19th-century railway brought speculative building: artisan dwellings, usually semi-detached, and plots laid out for individual purchasers.
For a larger kitchen or a new beam below the first floor, identify the original dividing wall and where the engineer proposes to place each bearing. A paired arrangement on the street does not identify the current support on either side. Check the proposed cut against the rights set out in section 2 of the Party Wall etc. Act 1996. Where there is qualifying party structure work, the notice procedure is in section 3. Draw any retained chimney and adjoining floor rather than labelling the whole building “existing”.
Arrange available drawings and work descriptions chronologically, locating each addition, changed opening or altered room.
Describe access to original and altered roof spaces and to the connections between phases.
If the designer proposes a different support when an earlier opening is uncovered, send the revised arrangement to the surveyor. Record the date, which party structure it now touches and whether it requires temporary support or working space on the adjoining side. Keep a copy of the section already sent with the notice so the changes can be assessed.
What can be seen where the frontage is open?
The boundaries section describes low brick walls and railings alongside open-plan arrangements such as College Close. A repeated wall line or absence of enclosure is a visual feature, not a record of ownership or the boundary of the proposed inspection.
List external features expected within the instruction and supply available records for repairs or changes to the frontage. Keep work to a surface or entrance separate from the history of adjacent walls and structures.
A new wall at the line of junction must be drawn against the boundary evidence so section 1 can be assessed. An existing low wall may remain, or the contractor may intend to remove and rebuild it. State which, and identify whether the wall forms part of a building, separates two gardens or stands wholly within one plot. The answer affects the operation the surveyor is being asked to consider.
For a proposed foundation, draw the excavation separately from the completed wall. Mark the neighbour's closest building or structure and its relevant foundation level. The section 6 comparison requires the actual depth and separation. If the excavation steps past a garage or rear extension, add a section through the part that approaches this structure, including any deeper pad. State whether dimensions refer to the finished wall or the edge of the excavation.
A record for different colours of brickwork
The materials account describes dark brick with red detailing, while the High Street account includes brick buildings with slate roofs. A contrast in colour may be part of the design rather than evidence that one area was recently rebuilt.
Request dated descriptions, specifications and photographs for reported work, identifying the elevation, roof slope or detail concerned. Keep repointing, surface decoration and replacement coverings separate from alterations to underlying construction. A broadly worded refurbishment account should not be treated as proof that every wall or roof component received the same work.
For a pre-works condition schedule, locate the relevant window, level and room on both the plan and the first image. The wider view should show which wall contains a particular joint or repair before the close photograph records its surface. Where a timber frame is covered by hanging tiles or brick, describe the accessible finish and the extent of the inspection. An older photograph of the frame can be attributed to the owner or contractor who supplied it.
Discuss who can arrange a view of the side or rear junction and whether a gate gives access only to one part. A decision to allow a condition inspection does not extend to carrying materials across a neighbour's garden throughout the project. Record any such separate requirement, where it would take place and for how long.
Use the decision for the address being altered
Tandridge District Council approved the village design statement as supplementary planning guidance. The statement describes local buildings and how their surroundings developed. Check the planning position for the precise works, the building regulations process and any private rights separately from a party wall award. If a request to preserve a frontage changes the position of a post or footing, provide the revised drawing to the surveyor before that part of the scheme proceeds.
If the drawing supplied to you omits an addition
Return a marked copy showing the addition, identify when you received the notice and keep all its enclosures. Our advice for adjoining owners explains the available ways to reply. If the upper room or former chimney on your side has been altered, supply any records that locate the work and state which surfaces can be seen now.
Lingfield, Surrey party wall questions
Does a strip of contrasting brick mean the wall has been rebuilt?
The village statement records contrasting brick detail as a feature of some buildings. Check the repair record and the construction at the particular location before deciding whether a coloured band is a later intervention.
What if the front gardens have no dividing fence?
Establish the boundary from the applicable evidence before setting out a new wall. Use a measured plan that identifies the intended masonry and any excavation independently of the open appearance.
Can scaffolding be placed in the side passage under the inspection arrangements?
Explain the construction requirement separately, including footprint, timing and effect on access. An agreement to inspect the wall has a different scope.