Party Wall Surveyor in Merton: Agreements, Notices and Awards

A projecting party wall on Merton Hall Road is visible from the roofline. A dividing floor above Merton High Street may be hidden. Trace the alteration.

Party Wall Notices from £195 plus VAT per notice · Schedules of Condition & Party Wall Awards

Party Wall Act 1996RICS Regulated

Where the dividing wall projects through the roof

The Merton Hall Road conservation area was designated in April 1987, and the council approved its character appraisal in November 2005. That appraisal says the majority of the buildings built in the period 1884 to 1911 are very richly detailed, listing party walls that project through the roof planes, ornate timber porches, moulded bricks, panels of glazed tiles, octagonal turrets at corner buildings and Dutch gables. It records widespread use of yellow London stock bricks, often with red brick detailing, and roofs of both slate and clay tiles.

If a householder wishes to add a roof room, show the present height of the wall projecting through the roof and what will change. Will the designer raise it, cut a bearing into it or weather a new roof against it? In each case identify the construction operation before deciding whether the Party Wall etc. Act 1996 applies. Specified work under section 2 is addressed through the party structure notice under section 3. A drawing of the proposed roof silhouette may omit the depth of a beam pocket, temporary support or the means of keeping the neighbour's roof dry.

Where a glazed panel or moulded brick detail lies near a proposed access point, identify it on a photograph. Ask where scaffold or temporary works would stand and whether some protection is needed before materials are moved. The architect may want conservation information, the surveyor may need a condition record and the engineer may need a structural detail. Label which drawing or photograph answers each question instead of assuming a single street elevation covers them all.

Rear space behind a shopping parade

For South Wimbledon, the 2021 study picks out the "Battles" roads of Victorian and Edwardian terraces and "Old Merton Park" as distinct neighbourhoods behind the main roads. On Merton High Street it describes buildings that are typically late Victorian or Edwardian three-storey shopping parades, with shops at ground level and offices or homes above, and says many shopfronts have been poorly converted to homes. Over a shop or behind a former shopfront, ask who maintains the main roof and rear walls, and for the conversion approvals.

For a proposed opening below a separately owned flat, locate the support beneath the upper rooms. A floor separating premises can itself be a party structure. A changed shop layout may also leave a pier or wall at a different position from the one on the title plan. Show the proposed and existing support, the unit above or beside it and the intended temporary works. Identify the relevant owners and who can open the common entrance for an agreed schedule.

The same street address can describe a whole house, a floor within it or a separate building behind it.

In planning a new rear wall, establish whether it would meet the line of junction for the purposes of section 1. Identify any existing yard wall or extension that the new work might enclose. For the excavation question under section 6, show the distance to the nearest adjoining structure, its foundation information and the intended depth of cutting. A rear stair or basement behind the shop may be closer than the wall apparent on the shopfront plan. Identify any uncertainty about the depth and ask the designer how it will be resolved.

The copy of the drawing used for the condition visit

Gather the approved elevation, the engineer's section and the current ground-floor plan.

Arrange them by date so that a later alteration is not mistaken for the work shown in an earlier application. Note any discrepancy between the current floor plan and the documents supplied.

During the scope discussion, identify the physical questions: where an earlier wall was removed, how a roof room is reached, or which extension has experienced staining.

For a schedule at an upper flat or roof junction, connect the room number to the plan and the photographed wall. Start with the view including a door, stack or window, then record visible marks, earlier patches and material differences. A resident may describe a leak which was repaired before the visit. Ask for any earlier photographs with their date and source and retain that account alongside the visible record. An existing patch is an observation. Its cause may remain uncertain.

The council file and separate permissions

Merton’s local appraisals and basement guidance help explain what information may be needed for planning. Check designations and the property's actual decision record. A planning permission does not settle how adjoining premises are owned, how a party structure notice is to be given or which lease permissions the work requires. Keep the building control documents and any landlord's licence with their own drawings. Give the surveyor access to the current design if a construction revision takes a new bearing in a wall or changes the depth of the dig.

When the notice describes an entire parade or block

A Merton adjoining owner can mark their floor, entrance and the relevant separating structure on a copy of the plan. Keep track of the date the notice and drawings reached you and ask which section through your unit describes the work. Our guidance for adjoining owners receiving papers explains how to reply and what to supply if a part of the building is missing.

Merton party wall questions

What if a new roof only meets the part of the party wall above the tiles?

Ask for the weathering and fixing detail and the intended treatment of the wall. The surveyor needs the actual operation and affected masonry, even if no change is visible from the street.

Can a commercial tenant provide all the access needed above its shop?

Identify the separate dwellings, common parts and the parties controlling them. A tenant may arrange entry to the shop while being unable to grant access to an upper room or shared roof.

Why keep two versions of the engineer’s foundation drawing?

They can show exactly what changed after a notice or agreement. Record the current issue and have the surveyor consider whether the revised depth or location affects earlier arrangements.

Get in Touch

Need party wall matters in Merton? Call 020 7101 4590.

Request a Consultation

Merton Party Wall Notice & Award Enquiry (Notices from £195 plus VAT per notice)

We use these details to respond to your enquiry. Read our Privacy Policy.