From £1,250 plus VAT — landlord & tenant RICS schedules of dilapidations and claim negotiation

SW8Landlord & TenantRICS Regulated

Identify the Nine Elms unit within the wider district

Wandsworth describes Nine Elms as a regeneration area extending from Battersea along the river towards Vauxhall and Lambeth, with distinct sites including the power station, embassy and market. That broad geography does not establish one landlord, a common lease or uniform operating arrangements. Start a dilapidations instruction with the specific premises, building and responsible parties. Read the lease plan, supplemental agreements and any condition schedule, locating the occupied floors and external elements. A unit within a larger development may have particular common-part and service provisions; the district name cannot determine whether a tenant repairs the facade, roof or equipment beyond the identified demise.

Gather the tenant fit-out and alteration documents, including licences, layout drawings, service information and photographs from entry. Distinguish the landlord's original provision from later tenant additions before preparing a reinstatement list. The requested removal of partitions, equipment or signs should identify the relevant obligation and any notice requirement, with legal advice where terms are disputed. Record the making good around penetrations or fixings rather than price removal alone. Where a development-wide drawing does not show the particular unit's executed arrangement, obtain better evidence. Neither a shared building identity nor a general fit-out manual proves which components the departing tenant installed or must remove.

Local evidence: Wandsworth: About Nine Elms, locations and regeneration context.

Distinguish historic Nine Elms fabric descriptions from present condition

Historic England's Battersea Power Station entry describes a steel frame with brick cladding and metal-framed windows. It also includes observations explicitly dated 2005, including missing roofs and items then in storage. Those dated statements must not be presented as current defects. Where an instruction concerns retained industrial fabric, use the relevant record to frame questions and inspect the actual component in its present state. For another Nine Elms building, establish its own construction rather than import the power station specification. A claim for cladding, windows or structure should explain the alleged breach, evidence and proposed remedy at the leased premises, including the scope of any further investigation.

Keep the lease stage and inspection dates visible. An interim review concerns obligations during the term; a terminal schedule addresses handover; an inspection after departure can establish what remains following tenant works. Record those changes against stable item references. For a fitted commercial unit, identify the particular mechanical and electrical systems included and the maintenance or commissioning information available. Avoid a single plant-replacement figure unsupported by equipment details. RICS guidance provides a professional framework for the schedule and response, distinguishing contractual responsibility from the technical evidence for treatment and cost. A building's industrial heritage or newer presentation is not itself proof that a particular installation is defective or serviceable.

Local evidence: Historic England: Battersea Power Station, listed entry 1357620; RICS: Dilapidations in England and Wales.

Examine the landlord’s specific Nine Elms fit-out intentions

A landlord may describe a future layout or replacement fit-out, but its effect on the claim requires the actual drawings, instructions and timing. Identify which tenant additions would be removed and which base-building components would be retained. Do not infer an incoming occupier, redevelopment programme or permitted use from the wider regeneration area. Different Nine Elms sites have their own property and decision records. Compare the evidenced proposal with each repair and reinstatement item, identifying unresolved design or permission matters. If a contractor's quote includes the landlord's upgraded specification, separate that work before treating the total as evidence of the financial consequence of the tenant's alleged breach.

Section 18(1) limits damages for breach of a repairing covenant by the resulting diminution in the value of the reversion. It also addresses demolition or structural alterations at or shortly after lease termination that would make the relevant repairs valueless. This is not an automatic cap on every category of a dilapidations claim. Obtain the appropriate legal and valuation assessment for the facts. Supersession should be considered against the landlord's evidenced intentions and the particular work claimed; a repair-cost total is not, by itself, proof of the loss to be demanded.

Local evidence: Wandsworth: About Nine Elms, locations and regeneration context; Landlord and Tenant Act 1927, section 18; Civil Procedure Rules: Dilapidations Protocol.

Support Nine Elms delivery and building-management assumptions

Wandsworth's Nine Elms page locates Northern Line stations on Battersea Park Road and Wandsworth Road and describes wider transport improvements. Passenger connections explain district access for people, but they do not establish a contractor's unloading position or route through a particular building. Obtain the current management requirements, loading arrangements, lift limits and route to the unit. Identify protection of common areas and any temporary occupation needing separate agreement. A delivery quotation to the neighbourhood is not an estimate of handling to the repair workface. Make unresolved bookings or permissions visible before relying on a hire period or an assumed sequence of works in the cost schedule.

Explain labour, quantities, equipment duration and waste removal for the stated operation, with the supporting quotation or invoice. Allocate costs shared across several repairs and distinguish access also required for the landlord's new fit-out. Where the tenant disputes the method, consider its alternative against the same physical and management constraints. The terminal dilapidations protocol requires a substantiated demand for loss, which may differ from a contractor's initial total. Retain dated condition records, lease references, fit-out licences and landlord-intention evidence beside itemised responses, so the parties can identify whether a remaining difference concerns responsibility, reinstatement extent, practical access or the amount properly claimed.

Local evidence: Wandsworth: About Nine Elms, locations and regeneration context; Civil Procedure Rules: Dilapidations Protocol.

Nine Elms lease-end questions

Does the Nine Elms regeneration area have one standard handover obligation?

No. Identify the particular premises and executed lease, with any supplemental agreements or fit-out licences. The wider district includes distinct sites, and its geography does not allocate repair, reinstatement or common-part responsibility for an individual commercial unit.

Can a dated power-station description support a current condition allegation?

It can provide historical context, but dated observations are not evidence of today's condition. Inspect the actual component and identify the present findings. Do not transfer either historic defects or the power station's construction to another Nine Elms property.

What if the landlord plans an entirely new tenant fit-out?

Obtain the actual scheme and distinguish components to be removed from those retained. Compare it with each repair and reinstatement item, using legal and valuation advice where relevant. A general fit-out intention does not automatically resolve every handover obligation or loss.

Do the new transport links establish an inexpensive repair delivery route?

No. Passenger transport and contractor handling are different questions. Confirm the unit's loading, lift, management and permission requirements, then cost the actual route, protection and duration. The estimate should disclose any unresolved booking or access assumption.

Related guidance: London dilapidations advice; lease condition records; licence to alter.

Nine Elms Schedule of Dilapidations Enquiry (From £1,250 plus VAT)

Content updated: October 2026.

Get in Touch

Need dilapidations in Nine Elms? Call 020 7101 4590.

Request a Consultation