Lease plan
For leaseholders, landlords and conveyancers who need a drawing of the instructed extent. Identify the floors, unit, retained parts and any associated areas; the legal adviser confirms the demise and rights.
For leaseholders, landlords and conveyancers who need a drawing of the instructed extent. Identify the floors, unit, retained parts and any associated areas; the legal adviser confirms the demise and rights.
For owners, occupiers, architects and project advisers who need existing floor plans. Selected elevations, sections, heights, levels, openings and stairs are included where specified in the brief.
For a defined area-measurement purpose alongside measured drawings. Confirm the intended use and adopted measurement basis. GIA, NIA and IPMS are different bases, not interchangeable labels for one total.
The appointment states whether we prepare from adequate existing records, undertake a fresh measured visit, or combine both. The client supplies the relevant legal instructions and the conveyancer checks the proposed demise, retained parts and rights. Physical occupation alone does not establish entitlement.
For the relevant application, the plan is prepared with HM Land Registry Practice Guide 40 supplement 2 in view: appropriate scale and orientation, location context, clear extent markings, a legible legend and identification of each floor. Separately instructed parking, gardens and storage are identified; overlapping or vertical extents may need additional views.
Drawing checks are followed by client and conveyancer review of the proposed extent, agreed amendments and final issue. The plan and deed description must agree. Registration remains subject to the application and HM Land Registry’s decision; preparation to guidance is not an acceptance guarantee.
Tell us the recipient’s format and version requirements. We confirm the editable CAD deliverable in the quotation; DWG/DXF, point clouds and Revit/BIM are not interchangeable or automatically supplied. Topographical, utility and scanning work needs an express scope and identified responsibility.
Agree the surveyed extent, required detail and accuracy for the intended use before measurement. Scale is a presentation choice, not a guarantee of geometric accuracy. The survey method, control, coordinate grid or datum should suit the instruction; equipment alone does not establish a tolerance.
Inaccessible rooms, concealed construction and inferred features are identified. When supplied drawings form the base, their source and verification status are stated; the drawing must not imply a new measured visit occurred. An “as-built” record does not certify concealed work, workmanship, regulatory compliance or conformity with a design.
Agree why an area figure is needed and document the basis used. RICS currently identifies the seventh Code of Measuring Practice edition as a draft, with the sixth edition and/or IPMS: All Buildings used as appropriate pending final publication. The second edition of RICS Property Measurement is archived and reference-only. Area rules and geometric survey accuracy address different questions.
A useful drawing issue identifies its purpose, property, extent and revision. Check that the floor names, units, associated areas and legend match the agreed brief, and that source-record and access limitations remain visible.
For a lease plan, send the proposed extent to the conveyancer before final issue. For measured drawings, ask the recipient to check that the agreed views, detail and file format meet the instruction. This explanation is a review checklist, not a specimen client drawing or evidence of a completed registration.
Read the guide to existing drawings, lease plans and what to send for a quotation.
These documentary sources describe specific settings at their publication dates. Use the examples to frame questions about the actual property; they do not establish its current layout, access, legal rights or condition.
Westminster's 2006 Pimlico Conservation Area Audit describes a deliberate hierarchy of terraces. On the three squares, Belgrave Road and St George's Drive, houses are generally four to five storeys over basement in cream painted stucco. On the narrower streets behind, more modest terraces are generally three storeys above basement and usually yellow stock brick with stucco ground floors and detailing, though some, such as those in Cumberland Street, are entirely stucco faced.
The 2006 audit explains that local builders took on small stretches of terrace individually, and records places where the design changes abruptly in the middle of one, so mark on a plan which parts the sale includes. Westminster's early-1990s Pimlico Design Guide says most buildings in the conservation area were built with projecting extensions at the rear.
If the property includes the lower floors described here, list basement rooms, lightwells, steps and entrances separately. Agree floor labels and whether a section is needed to explain overlapping extents. Identify locked or inaccessible spaces before quoting; an inferred outline must be identified as such.
For the terraces, courts or rear spaces described in the research, identify the main building and any separately instructed garden, store, parking or outbuilding. Provide an annotated plan showing what you want included, then ask the conveyancer to check rights, exclusions and legal extent.
Where the building has been altered, supply the earlier plans and identify any later subdivision or extension. Agree which dimensions require fresh measurement. A record-based drawing states its source and verification limits; it must not imply that all the premises were newly surveyed.
The descriptions are retained from the maintained local research. Supply current plans and alteration records; confirm the appointed extent and access at the property.
Request a quotation for the drawings you need. The written quotation sets out the agreed extent, outputs, access and total fee including VAT before you instruct.
A lease-plan quotation is not the price of a complete measured building survey. For a licence-to-alter drawing brief, agree exactly which existing plans, elevations or sections are included. Proposed alteration design, technical review and submission services need their own defined scope; a “CAD pack” does not describe a universal package.
Tell us your desired date. Attendance, draft issue, client and conveyancer review, amendments and final issue are agreed separately; an enquiry does not reserve a survey date.
The appointment identifies intended recipients, permitted reliance and limitations. Changed briefs, later alterations or newly accessible areas may require further work. Where appointments can be coordinated, scope, access and fees are agreed; combined visits and third-party coordination are not automatically included.
A lease plan depicts an instructed extent for a legal document or transaction. Measured drawings record existing geometry for an agreed purpose. Tell us what the recipient needs; choose “not sure” if the requirement is unclear.
Sometimes, if the records are suitable for the purpose, sufficiently current and permitted to be used. We review their source, extent and verification limits before agreeing whether fresh measurement is needed. A record-based plan is identified as such.
No automatic requirement is assumed. Explain the transaction and ask the conveyancer what is needed. Existing documents may suffice; changed layout, unclear extent or recipient requirements may call for further work.
The client and conveyancer confirm the legal demise, retained parts, rights and agreement with the deed. Survey and drawing checks do not establish legal entitlement. HM Land Registry decides the application; no registration or future-reuse guarantee is given.
Identify restrictions before the visit. The drawing records inaccessible areas and any inferred features with their limitations. A return visit, new access or extra drawing work requires agreement; an unseen room is not silently treated as measured.
The quotation names the PDF and any editable drawing format and version, views, extent and revision process. A floor-area schedule is optional and names its adopted measurement basis. Point clouds, Revit/BIM and specialist survey outputs need explicit agreement.
Request a quotation for the drawings you need. The written quotation sets out the agreed extent, outputs, access and total fee including VAT before you instruct. Tell us your desired date. Attendance, draft issue, client and conveyancer review, amendments and final issue are agreed separately; an enquiry does not reserve a survey date. The quotation defines the amendment allowance and any further work.
If the property includes the lower floors described here, list basement rooms, lightwells, steps and entrances separately. Agree floor labels and whether a section is needed to explain overlapping extents. Identify locked or inaccessible spaces before quoting; an inferred outline must be identified as such.
For the terraces, courts or rear spaces described in the research, identify the main building and any separately instructed garden, store, parking or outbuilding. Provide an annotated plan showing what you want included, then ask the conveyancer to check rights, exclusions and legal extent.
Start with the property and intended use. Additional details are optional; “please advise” works when you are unsure.
The applicable guidance and recipient requirements are checked for the individual instruction. HCS regulation details and the surveying team.