Party Wall Surveyor in Potters Bar: Agreements, Notices and Awards

On The Royds a room in the roof may be original, enlarged or newly created. Distinguish those stages before a Potters Bar beam, dormer or garage extension.

Party Wall Notices from £195 plus VAT per notice · Schedules of Condition & Party Wall Awards

Party Wall Act 1996RICS Regulated

Which part of the roof already contains a room?

The 2014 appraisal of The Royds Estate, designated in June 2000, says the estate was built in the early 1930s and is predominantly bungalows of a number of different types, from semi-detached and detached bungalows to detached semi-bungalows with two or three rooms upstairs. Typical features it lists include brick quoins, tall brick chimney stacks, peg-tile roofs and, historically, timber windows with stained glass leaded lights in some panes. It records that many of the bungalows have seen extensive alteration for more space, through box dormer extensions, squaring off originally pitched roofs to form gable ends and extensions over garages, and many timber windows replaced with uPVC.

If the property has rooms within its roof, mark the stair, accessible hatches and any spaces concealed behind cupboards.

Before inspection, identify any ceiling staining or other concern by room and location. Supply records for roof alterations or repairs where available, noting whether they relate to the entire covering or only one section. The surveyor should report the accessible evidence and limitations.

For an enlargement to an occupied roof, draw the original slope, the space already adapted and the proposed steel or masonry work. A note saying “loft conversion” does not establish whether the new work reaches a party structure. Locate the separating wall, show how the new supports enter it, if at all, and identify the adjoining room at the same height. Under section 2 of the Party Wall etc. Act 1996, specified work to the party structure follows the section 3 notice procedure. Working above a neighbour's ceiling may raise different access questions from a beam positioned beside an existing loft bedroom.

If a shared stack is involved, show the portions to be removed, the support for the parts remaining and the weathering at each roof. Ask the contractor to explain what happens to the exposed junction if work stops between demolition and completion. A photograph of the tall stack from street level will record its position without establishing its internal support or who uses the flues.

Compare a winged house with its later addition

Hertsmere's 2010 proposal to designate Darkes Lane West traces it to the Potters Bar Garden Estate of the early twentieth century; permission for The Avenue was granted in 1903, and building continued onto Mountway during the later 1920s and 1930s. It found all but four of the original pre-war houses surviving, with some in-fill housing added to vacant plots from the 1950s onwards, and noted that some of its winged-houses had been added to over time.

For an enlarged house, place the earlier and current floor plans side by side. This helps direct attention to the relevant interfaces without presuming that the alteration is unsatisfactory.

Where an extension meets the main house, ask for access to the adjoining rooms and external junctions.

For a new wall along a garden edge, mark whether the designer intends to build to or astride the line of junction. The section 1 assessment depends on the proposal at that particular line. Where the plan shows an existing garden wall changing to a garage wall, identify both and show precisely where the proposed new structure begins. The neighbour should be able to see from the drawing which wall will remain and which will be removed or incorporated.

An extension across an earlier garage can also require a deeper pad or strip at its rear corner. Check the section 6 excavation tests in relation to the nearest part of the adjoining building, including a garage or return behind the neighbouring bungalow. Draw the limit and depth of the excavation and the adjoining foundation information. Distinguish the underside of the footing from the floor level visible through a door and mark the date and source of any earlier foundation drawing.

A condition schedule for an occupied roof

If the work will take place at roof height, identify the neighbouring upper bedroom or void and the roof surface directly above. Include a general view of the relevant slope before images of individual tile repairs or existing stains. Locate each ceiling in the plan and record whether its edges were hidden by cupboards or a sloping lining. If access to the eaves requires use of another room, agree the arrangements before the visit. Reaching one bedroom via a permanent staircase does not make every part of that roof visible.

Hertsmere records for a bungalow alteration

The Royds appraisal records features including bay windows, chimney stacks and decorative gable details. The appraisal supplies historic context; it does not decide an application or identify the repair needed at your address.

Check the current mapped area and address with Hertsmere Borough Council. Keep decisions on an alteration to the dormer, any building control documentation and private consent required by a lease or title separately identified. An award under the Act can deal with the particular statutory works but does not replace those processes. If the construction design extends the cut into the party wall beyond the work anticipated in a planning set, tell the surveyor which detail changed before instructing the builder.

An adjoining owner's view from The Royds or the Garden Estate

If the neighbour's plan assumes an empty roof when you have an upstairs room, mark the room and access on a copy and explain which part was originally built or later altered if known. Send the notice and its date of arrival. The adjoining owners’ guidance explains response options and which property records or photographs to share when arranging the condition visit.

Potters Bar party wall questions

Does a box dormer prove that all the upper rooms are recent?

The Royds had bungalow types with upper rooms from the start. Compare the original plan with any later dormer, staircase and roof alterations at the particular dwelling.

Can the builder use a drawing from the next bungalow in the pair?

It can illustrate a principle. The structural design and notice assessment need to identify this party wall, this adjoining room and the actual position of each proposed bearing or cut.

What records help if my garage roof was replaced independently?

Supply the scope, date and any images of the junction. Identify whether the work concerned only the garage covering, the main roof or their connection so later observations can be compared.

Get in Touch

Need party wall matters in Potters Bar? Call 020 7101 4590.

Request a Consultation