Is the work to the connecting building or the original cottage?
Welwyn Hatfield Borough Council's conservation-area appraisal describes how the 1932 cottages at Barley Croft Green, originally detached buildings with steep pantiled roofs, became linked in many cases by garage extensions.
Ask for the plans and work history for the link, including any changes to openings in the original side wall. The inspection brief should distinguish the main roof from the lower addition and explain how each can be viewed. A continuous frontage need not represent a single construction phase.
Check which wall will receive a new beam if you plan to convert a low link into a room or add a storey above it. It may be an original side wall, a wall between adjoining garages, or a new independent support. Record who owns or uses the structure at the relevant position. Assess any proposed cut or raising of a party structure against the rights in section 2 of the Party Wall etc. Act 1996 and the section 3 notice procedure. A current section showing the level change between house and link is more useful than a frontal image of the row.
If the adjoining owner plans to keep a garage roof, show how its abutment and rainwater drainage would be treated during and after the work. For the schedule of condition, mark the face inside the garage and the corresponding wall or room inside the principal house. Take a general photograph identifying each roof level, then closer images of the joint or any visible repair.
Similar planned groups with different construction
The appraisal records groups of two and four houses at Elm Gardens and Applecroft, using red stock brick and clay pantiles. It also distinguishes changes in roof orientation at Barley Croft. These descriptions help identify the intended group composition, without proving that every existing covering or roof-space alteration is original.
Mark the position of the loft hatch, any inaccessible eaves and the parts visible from the garden. Questions about a leaking junction or altered drainage should be linked to the particular roof element rather than to the appearance of the whole group.
It describes the Meadow Green Daily Mail model village as a practical housing exhibition using various construction methods and materials, of which 43 houses were built, opening in March 1922.
If the project involves one of the exhibition houses, establish its particular materials and the position of later additions before deciding which operations need notice. A section or photo taken before a garage was enclosed may explain an otherwise hidden connection. Date it separately from the new schedule and identify which part of the building the image shows. Decorative brick and window details matching the rest of the group cannot establish the structure of that later link.
Infill up to a garden boundary
The September 2007 appraisal dates the town's foundation, and the presentation of its master plan, to 1920, and says houses vary in size and type, detached, semi-detached and terraced, while few groups or blocks of flats lie within the conservation area. Its notes describe groups and streets inside that conservation area, not every home in the town.
For a new wall at the line of junction, show its intended position relative to the boundary and identify any existing enclosure. This is a section 1 question. Where the link includes new or deeper foundations, make a separate section 6 check. Identify the excavation at its deepest point, the distance to the adjoining building or structure and the neighbouring foundation level where known. If the plot was originally open between the houses, include any garage or later infill built into the gap.
A change from a roof-only alteration to new foundations is a change of work. Make sure the surveyor sees the new engineer's detail and understands which part of the original supporting wall would now be removed. The contractor should be able to identify the drawing actually reviewed with the owners and distinguish it from an earlier outline scheme.
Estate management and the current construction issue
Welwyn Hatfield Borough Council publishes information on its Estate Management Scheme. Check whether the site and proposal require scheme consent, planning permission, building regulations approval or separate consent under a lease or title. A party wall agreement or award concerns statutory matters between owners. Estate management consent for the appearance of a garage link cannot itself decide a neighbouring owner's response to proposed structural works.
For access, establish who can reach each side of the link or rear garden and whether the proposal relies on temporary support there. A pre-works inspection is a specific visit. Agree any additional arrangements needed for the contractor separately and identify what access must remain available during the work.
A neighbour whose garage would remain lower
If the drawings concern the link beside your home, send your notice, service date and drawings or photographs showing the retained roof. Our adjoining-owner service explains the available responses. Tell the surveyor whether the garage has been converted or contains a ceiling lining that restricts the view of the connection.
Welwyn Garden City party wall questions
Does a continuous line of garage roofs mean there was always a party structure?
Check the current structure, its ownership, how it is used and its construction history. The appraisal records that originally detached houses became linked, so the original design does not settle the present position.
Should the two-storey and single-storey roofs share one schedule entry?
Give them separate references on a plan and include an overview linking them. The junction and the surfaces either side can then be compared from the same positions after works.
Will estate approval for the appearance of a link authorise work to the neighbour’s side?
Check the scope of each approval and the rights involved at the boundary. The estate scheme and the Party Wall Act have separate functions, as do planning and building regulations.
Other Welwyn Garden City surveying services
- Level 3 Building Survey
- Schedules of Condition
- Measured Surveys and Lease Plans
- Licence to Alter
- Building Defect Investigations
- Building Condition Surveys
- Section 20 Major Works
- Contract Administration
- RICS Home Surveys
- Snagging Surveys
Party wall surveying service · Welwyn Garden City area guide