A garage behind an Updown Hill villa
Surrey Heath's March 2000 appraisal of the Updown Hill Conservation Area calls its most important group detached Victorian villas on generous, wide plots, alike in form, materials and colours but different in details such as windows, doors and brick patterning. The schedule records grey slate roofs, red brick with cream or white brick bands and quoins on several villas, later garages and flat-roofed rear extensions, and pairs of semi-detached cottages dated 1892. It also notes that some properties have lost original features, especially windows and doors.
The new footing for a garage or side extension might come nearer to the neighbouring rear addition than to the other villa. Give the surveyor a measured plan and a section through that particular point. Section 6 of the Party Wall etc. Act 1996 concerns excavation sufficiently close to an adjoining building or structure and meeting the relevant depth test. Record the levels of the excavation and the adjacent footing and identify which are established by evidence. Where the neighbouring foundation depth has been assumed, ask the engineer to label the assumption clearly.
For a wall at the line of junction, put the proposed masonry and the legal boundary on the same drawing. Check section 1 independently of the excavation question. Show whether any existing wall stays in place, and whether the contractor intends to use space on the adjoining side. Planted or screened plots can make an existing wall invisible from the road, so establish the arrangement through survey and records before fixing the detail.
A different party structure in the paired cottages
The Updown Hill building schedule includes hipped and gabled slate roofs with varied chimney arrangements. The date given for one operation may not describe the condition or history of another component on the same roof.
Supply the available invoices, specifications and photographs, marking the roof section involved. Where an extension or garage was added later, identify its junction with the earlier house and the accommodation beneath. A record for the addition should not be treated as a renewal record for the principal villa roof.
For an alteration to a chimney or roof on one half of a pair, draw the part that will remain as well as the part being removed. If the works involve cutting into or rebuilding shared fabric, assess the section 2 operations and the party structure notice provided by section 3. Mark the level of the proposed support and the comparable rooms in both homes. A similar looking chimney on another villa is a reference for local architecture but does not establish the condition or support at this junction.
A schedule of condition should distinguish the street roof, rear addition and any later garage or lower roof. Start with a photograph of each part in relation to the house, then record close views of existing marks at relevant ceilings or wall junctions. Identify the limits if the roof or flank can only be observed from ground level. Attach reports of earlier repairs with their dates and the surfaces they concern.
Record a decorative feature in its setting
The historical villa examples record red brick with lighter bands, quoins and details around openings. Where external masonry work is reported, identify the elevation and the part repaired. A reference to brickwork may cover a decorative band without describing the adjoining wall, or the reverse.
Evidence for work on one section should not be expanded to an entire frontage merely because the finished colours appear consistent.
For a cut below an upper opening, identify the load-bearing detail instead of relying on a contrast in brick colour to establish where an earlier opening ended. Keep the relevant engineer’s issue with the account of any investigation. If a proposed support moves after more of the wall becomes visible, notify the surveyor before relying on the earlier notice or award for the changed operation.
The separate Church Road and Kennel Lane appraisal describes larger plots and smaller semi-detached cottages as well as houses screened from view. Confirm practical access with the occupiers. Asking to take photographs beside a hedge does not authorise the builder to use the neighbour's land for vehicles or storage.
Address and issue date on the permission
Windlesham Parish Council's neighbourhood plan for 2018 to 2028, made by Surrey Heath Borough Council in June 2019, describes a medieval village in which buildings survive from the sixteenth and seventeenth centuries, though most are of the eighteenth, nineteenth and twentieth. It records three major housing developments between 1968/70 and 1988/90, at Snows Ride, Heath Park Drive and Windmill Field, which with smaller schemes came close to doubling the size of the village.
Surrey Heath Borough Council's planning documents can be checked for the exact site and proposal. Keep a planning permission and its drawings, any building control documents and private consent apart from the party wall process. A decision about how an extension should appear may not address the construction sequence next to the adjoining house. Send any revised roof, wall or foundation detail to the surveyor before the relevant work begins.
When a notice names the villa but omits your garage
Point out the garage or rear projection on a copy of the drawing. Send the date the notice reached you and any information you have about the nearest structure and its foundation. Our advice for adjoining owners explains response and appointment choices. Mention which elevation or rooms can be made available for a pre-works record.
Windlesham, Surrey party wall questions
How should the surveyor describe an earlier brick repair?
Record the elevation, height and exact feature, with a wide photograph locating it and a closer view showing the joint or change of finish. Keep the date of any repair history separate from the inspection date.
Could one notice describe both a garage trench and a chimney alteration?
Supply the separate details for each operation and identify the properties affected. The surveyor needs to establish the appropriate statutory procedure and notice for each aspect of the proposed work.
Does screening by trees show that a wall has a movement problem?
Identify what can actually be seen and any previous investigation at the location. A screened elevation restricts access and visibility but does not by itself diagnose the structure or cause of a mark.
Other Windlesham, Surrey surveying services
- Level 3 Building Survey
- Schedules of Condition
- Measured Surveys and Lease Plans
- Licence to Alter
- Building Defect Investigations
- Building Condition Surveys
- Section 20 Major Works
- RICS Home Surveys
- Snagging Surveys
Party wall surveying service · Windlesham, Surrey area guide