Level 2 Building Survey, Haggerston, London E8
The brief
A buyer required an independent survey of a two-bedroom flat within a purpose-built mixed-use block. The interior appeared well maintained, but the assessment also needed to consider the building’s later alterations and shared fabric.
Our work
We found no evidence of structural movement and no active dampness within the flat. The principal concerns instead related to concealed roof drainage, deteriorated rear timber capping, guarding fixings, fire precautions and incomplete documentation. A previous patch repair to the roof junction warranted enquiries into the roof system, repair history and guarantees.
The outcome
The report set out a sequence of management-document requests and targeted inspections. It also identified flat-level safety and maintenance actions and the need to confirm responsibility for shared work. The result was a focused purchase checklist addressing issues that were not apparent from the interior’s decorative condition alone.
Scope and limitations
- Visual, non-intrusive inspection of accessible areas only.
- Concealed roof drainage could not be seen and was referred to targeted inspection.
- The building documentation available at the time of the survey was incomplete.
The client is identified here by role only, and the exact address is not published.
Sector
Residential
Service
Level 2 building survey
Location
Haggerston, London E8
Client
Prospective purchaser (anonymised)
Building
Two-bedroom flat within a purpose-built mixed-use block, with later alterations and shared fabric
Instruction
August 2026
Project stage
Issued survey report — pre-purchase advice
Lead surveyor
Savas Bulduk BSc (Hons) MRICS
Published
September 2026
Photographs from this instruction
Selected photographs from the instruction described above.