The brief

The property manager required advice on defective roof areas within a complex urban roofscape. The instruction needed to identify the work required and provide a basis for developing comparable contractor proposals.

Our work

We distinguished the stepped rear flat roofs from the separate front parapet-gutter system. The rear areas needed to be considered together because of their shared waterproofing interfaces. The front gutter required an assessment of falls, outlet capacity and overflow arrangements; a surface coating alone would not address the underlying drainage geometry.

The outcome

The technical report was accompanied by a draft schedule covering strip-up, roof build-up, drainage, junctions, inspection and testing. Concealed deck condition, dimensions and discharge routes were identified as essential pre-construction checks. This provided a defined basis for developing the specification and progressing a separate procurement appointment.

Scope and limitations

  • Concealed deck condition, dimensions and discharge routes were not confirmed and were identified as essential pre-construction checks.
  • The draft schedule of works requires authorisation before tender issue.
  • This account covers the roof report and draft schedule only; procurement, contract administration and any works are outside it.

The client is identified here by role only, and the exact address is not published.

Case Summary

Sector

Managed property

Service

Roof report and draft schedule of works

Location

Clerkenwell, London EC1V

Client

Property manager (anonymised)

Building

Building within a complex urban roofscape, with stepped rear flat roofs and a separate front parapet-gutter system

Instruction

August 2026

Project stage

Issued roof report; draft schedule awaiting authorisation

Lead surveyor

Savas Bulduk BSc (Hons) MRICS

Published

September 2026

Photographs from this instruction

Selected photographs from the instruction described above.

Split and surface debris in a flat-roof covering.
Split and surface debris in a flat-roof covering.
Debris and surface weathering within a parapet gutter.
Debris and surface weathering within a parapet gutter.
Request a Consultation

Discussing a similar building? Call 020 7101 4590.

Request a Consultation
Lead surveyor: Savas Bulduk BSc (Hons) MRICS. Technical review approved 26 September 2026 by Savas Bulduk BSc (Hons) MRICS, Chartered Building Surveyor and Director at Hampstead Chartered Surveyors & Building Consultancy. Client identity anonymised.
Local guides

Local Level 3 building survey guide