What to know first
For a Level 3 Building Survey, Savas Bulduk inspects the property himself and writes the report. A typical house or flat takes 2 to 3 hours on site, larger or heavily altered buildings take longer, and the report usually follows within about 5 working days, with a call about anything urgent first. Every fee is confirmed in writing before you instruct, once the property, its size and the scope are known. Send the listing, floor plan and anything you already know about the property with your enquiry, so the scope and the fee match the building. The firm is regulated by RICS, and you can verify the listing from the link at the foot of every page.
Other topics
Buying a home
Ask a Surveyor topic
View questionsDamp and water
Ask a Surveyor topic
View questionsCracks and movement
Ask a Surveyor topic
View questionsRoofs, drains and services
Ask a Surveyor topic
View questionsFlats, blocks and leasehold
Ask a Surveyor topic
View questionsNeighbours, insurance and disputes
Ask a Surveyor topic
View questionsFire safety and building safety
Ask a Surveyor topic
View questions