Book a new-build snagging inspection

Call 020 7101 4590 or email enquiries@hampsteadcharteredsurveyors.co.uk to book a new-build snagging inspection. We confirm a fixed fee after scoping the plot and the timing.

New Build Snagging Survey in London

Independent snagging inspector London support for new-build flats and houses before completion, after handover or before the defects period ends, with a photographed snag schedule the developer can act on.

Pre-Completion InspectionsDeveloper Defect SchedulesWarranty Timing

From £350 plus VAT for one-bedroom apartments — fixed fee by bedroom count, confirmed before you instruct.

RICS Regulated Firm No. 923064Professional Indemnity InsuredCompany No. 17085122
Get Started

Request a survey quote

Send the property address or listing link and we'll confirm the most suitable survey type before quoting.

Prefer to talk it through first? Call 020 7101 4590.

Overview

New-build snagging survey London: independent inspection and snagging list

A new-build warranty does not make a new home defect-free. A snagging survey London buyers can use with the developer records finishing defects, incomplete work and non-compliant detail while the developer is still obliged to put them right.

We inspect new-build houses and flats across London room by room, externally and internally, recording each snag with a location, a photograph and a clear description a site manager can act on. Where access allows, we also review roof spaces, service cupboards, balconies and external works, because the most expensive new-build problems are rarely in the paint finish.

This is a new build snagging survey, not a structural survey of an older property. If inspection shows movement, damp, fire-stopping or other issues that need deeper diagnosis, we say so clearly and point you to the right follow-on route rather than padding the snag list.

We are independent of the developer and of any warranty provider. Our role is to give you an evidence-led schedule and to explain which items are genuine defects, which are within tolerance, and which need escalating - including in the context of NHBC Buildmark or other new home warranty arrangements. We advise on the process; we do not act as warranty claims handlers, and we say so plainly.

London new-build completions cluster in exactly the formats where snagging pays for itself: high-volume apartment blocks, permitted-development and mixed-use conversions, and speculative houses finished at pace to hit a sales programme. The visible finishes are only part of it — the defects that cost most later are poorly sealed windows and balcony thresholds, missing or bridged insulation, inadequate ventilation, drainage falls and incomplete fire-stopping between flats. Booking an independent pre-completion inspection, and a re-inspection before the end of the builder warranty period, puts the obligation to fix squarely on the developer while it still applies.

Service Summary

Provider

Hampstead Chartered Surveyors & Building Consultancy, Hampstead NW3

Reviewed by

Savas Bulduk BSc (Hons) MRICS, Director & Chartered Building Surveyor

Coverage

North, North West, Central, West, South West, South East and East London

Service

Snagging Survey London

Regulation

RICS Regulated Firm No. 923064

Insurance

Professional indemnity insurance held

Before You Instruct

What to send, and what you receive

Send a few details about the property and we will confirm the snagging survey cost, timing and access requirements before you instruct.

What to send before we quote

  • The property address and postcode
  • Developer name and plot number, if known
  • Your stage: pre-completion, after handover, or approaching the end of the defects period
  • Any developer access rules or customer care contact details
  • Photos of defects you have already noticed

What you receive

  • A photographed snag schedule, numbered by room and element
  • Plain-English defect descriptions the developer can action
  • Priority notes separating urgent defects, tolerance issues and maintenance items
  • Warranty and customer care timing notes where relevant

Some issues, for example structural movement, drainage or damp, can need specialist follow-up; we say clearly when that applies and what is and is not covered. Ask what the report would include.

When To Instruct

When a snagging survey earns its fee

  • Before legal completion, where the developer allows a pre-completion inspection under the New Homes Quality Code
  • Immediately after handover, while the developer customer care route is freshest
  • Approaching the end of the builder warranty period, often two years from policy start or legal completion depending on the scheme
  • Where finishing quality is visibly poor and you want the full picture, not a sample
  • Before a retention or completion payment is released on a bespoke build
  • Where a managing agent or freeholder wants common parts of a new block snagged as well as the flats
Scope

What this service covers

Pre-completion inspection

A full snag schedule before you complete, prioritised so the developer can close items out before you move in.

Post-handover snagging

Room-by-room inspection after handover, recording defects, incomplete work and damage with photographs and locations.

End-of-defects inspection

A sweep before the rectification period closes, so latent and seasonal defects are reported while the obligation to fix them still exists.

Developer liaison support

Clear, numbered schedules in a format site teams accept, and advice on escalation routes where responses stall - including warranty context, without acting as claims handlers.

What You Receive

Outputs

  • Numbered, photographed snag schedule, ordered by room and element
  • Severity flags separating defects from tolerance and maintenance items
  • Notes on items that may be warranty-relevant rather than developer snags
  • A format developers' customer-care teams can work through and sign off
  • Optional re-inspection visit confirming what was actually closed out
How It Works

Process

01

Confirm scope and access

We agree the property type, timing relative to completion or the defects period, and access with the developer or your conveyancer.

02

Inspect

A chartered surveyor inspects room by room, externally where accessible, and to roof spaces and service areas where safe access exists.

03

Schedule

Each item is numbered, located, photographed and described in plain, actionable language.

04

Prioritise

We separate genuine defects from tolerance and maintenance matters so the schedule carries weight.

05

Issue and advise

You receive the schedule promptly with advice on presenting it and on warranty-relevant items.

06

Re-inspect (optional)

We return to verify closures before you sign anything off or the defects period ends.

Fees

Snagging survey cost factors in London

Snagging survey cost is set by property size, type and the inspection stage - a pre-completion flat visit is a different exercise from a four-storey townhouse with external works at the end of year two.

We confirm a fixed fee in writing after scoping the home, access and the brief, before any work starts. Re-inspection visits are quoted separately, so you know the cost of checking developer close-out before you instruct.

What affects the fee

  • Size and layout of the house or flat, and number of bathrooms/kitchens
  • Stage: pre-completion, post-handover or end of defects period
  • External elements: gardens, balconies, parking, outbuildings
  • Whether common parts of a block are included
  • Re-inspection visits to verify close-out
Warranty And Redress

Where the Code, Ombudsman and warranty fit

A snagging schedule is strongest when it follows the route your developer and warranty provider recognise.

For registered developers, the New Homes Quality Board explains the New Homes Quality Code and the buyer protections that run to two years after legal completion. Where a registered developer does not resolve a complaint, the New Homes Ombudsman Service is the relevant escalation route.

If the home has NHBC Buildmark, NHBC describes the builder warranty period as usually the first two years from the policy start date. We do not act as warranty claims handlers; we prepare clear evidence so your developer customer care route, warranty provider or adviser can see what was found and what remains open.

London Inspection & Reporting Workflow

A representative snagging inspection for a new-build London flat

The following London inspection and reporting workflow breakdown shows how our RICS surveyors scope, inspect and report on real properties across London; see our published London surveying case studies for completed project records.

  • Client type: a new-build buyer
  • Property type: a recently completed flat in a new development
  • Issue: finish defects, incomplete works and snags before completion
  • Instruction: an independent pre-completion snagging inspection
  • Output: a clear, itemised snagging schedule with photographs to issue to the developer
  • Outcome: the buyer had a documented list to raise during the defects period
  • Related services: RICS Home Surveys, Building Surveyors London

Not sure which survey you need? Send the property link and we'll point you to the right level of advice.

Ask which survey you need
FAQs

New Build Snagging Survey London FAQs

What is a snagging survey?

A snagging survey is an independent inspection of a new-build home that records defects, unfinished work and poor-quality finishing in a schedule the developer can act on. It focuses on workmanship and completion rather than the structural condition matters covered by a building survey of an older property.

When should I book a snagging inspection — before completion or within the two-year defects period?

Ideally before legal completion, if the developer permits a pre-completion inspection - the New Homes Quality Code has made this more common. Failing that, as soon as possible after handover, and again shortly before the defects or rectification period ends so latent items are caught while the developer is still obliged to fix them.

How much does a snagging survey in London cost?

From £350 plus VAT for one-bedroom apartments — fixed fee by bedroom count, confirmed before you instruct.

Do I need a snagging survey if the developer has NHBC?

A new-build warranty does not make a new home defect-free. If the home has NHBC Buildmark, NHBC describes the builder warranty period as usually the first two years from the policy start date. We do not act as warranty claims handlers; we prepare clear evidence so your developer customer care route, warranty provider or adviser can see what was found and what remains open.

Local Coverage

Dedicated new-build snagging survey area guides

Request a Consultation

Buying or just completed on a London new build? Call 020 7101 4590.

Request a Consultation
Reviewed by Savas Bulduk BSc (Hons) MRICS, Director & Chartered Building Surveyor at Hampstead Chartered Surveyors & Building Consultancy. Last reviewed: October 2026.
Direct Enquiry

Enquire about New-Build Snagging Surveys

Tell us briefly about the building and what you need. Your enquiry goes directly to our chartered surveying team.

We respond to enquiries within one working day.

Prefer to talk it through first? Call 020 7101 4590 or email enquiries@hampsteadcharteredsurveyors.co.uk.

Typical fees: New-Build Snagging Surveys instructions in London typically start from £350 plus VAT; we confirm a fixed fee after scoping the building and the brief.

We use the details you provide to respond to your enquiry. Read our Privacy Policy.

We respond to enquiries within one working day.

Scope & Fee Guide

New Build Snagging Survey in London: Deliverables & Transparent Fee Matrix

Every new build snagging survey in london instruction is confirmed by a fixed written fee proposal once the property address, tenure and scope are reviewed. Starting fees begin from £550 plus VAT; all fee guides below are exclusive of VAT (plus VAT).

Scope / Property BandDeliverables & Technical ScopeTypical TurnaroundTransparent Fee Guide (Excl. VAT)
Band A — Standard / Single-Property New Build Snagging Survey in LondonPre-instruction document review, targeted site inspection or desktop appraisal, and structured RICS-aligned report.3–5 working days from inspectionFrom £550 plus VAT (new-build studio, 1-bed or 2-bed London apartment snagging inspection)
Band B — Comprehensive New Build Snagging Survey in London InstructionFull site inspection, photographic defect/evidence schedule, regulatory analysis and prioritised cost/action plan.5–8 working days from site accessFrom £750 plus VAT (new-build 3–4 bed house, penthouse or developer conversion snagging survey)
Band C — Complex, Heritage or Multi-Unit New Build Snagging Survey in LondonListed-building, higher-risk, multi-unit or portfolio instruction with senior director review and adviser coordination.7–12 working days (or agreed milestone)From £950 plus VAT (large 5+ bed detached new-build + thermal imaging & de-snag re-inspection)