Your contract administration appointment

Discuss the building works in Alexandra Park with HCS. The written appointment defines the contract role, deliverables, authority, fee and any separately appointed services.

  • Confirm the contract documents, responsibilities and communication arrangements.
  • Agree site visits and reporting, and assess changes and payment applications under the contract.
  • Define completion, defects-period and final-account tasks in the appointment.

For JCT Design and Build, discuss the Employer’s Agent role. For NEC, confirm the roles required by the selected form; an ECC appointment should distinguish Project Manager and Supervisor responsibilities. Read the contract-form guide.

Discuss your building contract

Inspections and communication

Agree the number and timing of visits, progress meetings and reports before instruction. Identify work that needs to be seen before it is covered, the information the contractor must provide, and who will record outstanding decisions. Periodic inspections do not amount to continuous supervision.

Variations, payments and completion

Keep proposed changes, instructions and their cost and programme assessments together. Payment applications are assessed against the executed contract and the evidence available. The appointment identifies who prepares valuations and issues certificates or notices.

Where the contract provides for retention, the employer retains the relevant money. The contract administrator assesses and certifies the amounts and release stages within the appointed role; this does not mean HCS holds the retention money. JCT explains interim valuation and retention.

Practical completion, outstanding work, making good defects and final-account steps follow the particular contract. Agree the required records and responsibilities instead of treating one certificate as evidence of every statutory approval.

Contract planning in Alexandra Park

Documented building context

Haringey’s Muswell Hill appraisal, adopted in February 2008, describes the odd-numbered 51–65 Alexandra Park Road terrace with red brick, pitched slate roofs, porches and distinctive corner bays. It separately records 67–83 as linked semi-detached houses from the 1920s or 1930s, with rendered upper floors and hipped tiled roofs. These are different groups on the road’s western section, not a description of every Alexandra Park address.

Existing-building records for the tender

For an address described as Alexandra Park, assemble the title or lease, current floor plan and alteration chronology before assuming that a park, conservation or listing boundary covers the whole plot. Ask the council about the particular building and work, with the mapped source identified.

Alexandra Park tender and contract decisions

For work to the 51–65 Alexandra Park Road group described by Haringey, distinguish the corner bay, porch and main slate covering in the tender schedule. A single roof-repair allowance can obscure where the contractor expects to work. Ask for the proposed access, temporary protection and quantities against each identified position. Where the corner projection belongs to a different elevation, locate that return on the drawing and include it in the agreed inspection sequence. The appraisal supplies a starting description; the current survey must establish the actual materials and repair needs.

An instruction for one of the later linked pairs at 67–83 needs a different component breakdown. Identify the hipped tiled roof, rendered upper wall and linking element separately. Record which surfaces are retained and what the design proposes to open, repair or replace. If investigation at the link reveals a different construction from the tender assumption, keep the photographs and designer's detail with the proposed change. Under the selected JCT form, use the agreed instruction and valuation procedures; the name of the road does not establish a contractor's entitlement.

Before inviting prices, put the actual plot, occupied rooms and access routes beside the priced work sections. A scaffolding proposal for the terrace's corner bay should not silently become the access assumption for a linked semi-detached house. Confirm the permission position for the particular building with the appropriate adviser. At handover, compare the completed work with the specified bay, roof or rendered section and list unfinished items by location. Retain the accepted material references, alteration drawings and relevant guarantees in the project file so a later maintenance enquiry can identify what this contract actually covered.

Keep the terrace corner-bay detail separate from the linked pair’s hipped-roof drawing when issuing revisions.

Appointment

HCS cannot act as independent contract administrator where HCS is the contractor.

Contract scope

Local Sources Checked

Who is responsible for the appointment?

Savas Bulduk BSc (Hons) MRICS, Director & Chartered Building Surveyor. Read the professional profile and check the firm’s RICS regulation. The written proposal confirms the person responsible for your instruction and the agreed scope.

Fees and information for a proposal

Contract administration is quoted to the project; the fee reflects the contract, the value and the level of involvement required. The number of visits, valuation stages, programme and completion work affect the proposal. See the fee factors.

Send the project address, proposed works, current stage, estimated construction value and any existing or proposed contract. Include the intended programme and available drawings or specification. If the contract form is undecided, say so; value alone does not determine the appropriate form.

Alexandra Park contract administration questions

How should a corner bay and the main roof be priced?

Identify the bay, porch and main covering as separate tender items, with their own access and protection requirements. A single roof allowance would leave the repair positions unclear.

What if opening the link between a pair reveals different construction?

Keep the opening-up photographs with the designer’s revised detail. Identify the affected linking element in the instruction and assess the resulting change under the executed contract.

Discuss your building contract in Alexandra Park

Tell us the scope and current stage so we can discuss a suitable appointment. Privacy policy.

Accountability

Provider

Hampstead Chartered Surveyors & Building Consultancy — RICS Regulated Firm No. 923064

Professional profiles · RICS regulation

Discuss the Alexandra Park project