Your contract administration appointment
Discuss the building works in Chalk Farm with HCS. The written appointment defines the contract role, deliverables, authority, fee and any separately appointed services.
- Confirm the contract documents, responsibilities and communication arrangements.
- Agree site visits and reporting, and assess changes and payment applications under the contract.
- Define completion, defects-period and final-account tasks in the appointment.
For JCT Design and Build, discuss the Employer’s Agent role. For NEC, confirm the roles required by the selected form; an ECC appointment should distinguish Project Manager and Supervisor responsibilities. Read the contract-form guide.
Inspections and communication
Agree the number and timing of visits, progress meetings and reports before instruction. Identify work that needs to be seen before it is covered, the information the contractor must provide, and who will record outstanding decisions. Periodic inspections do not amount to continuous supervision.
Variations, payments and completion
Keep proposed changes, instructions and their cost and programme assessments together. Payment applications are assessed against the executed contract and the evidence available. The appointment identifies who prepares valuations and issues certificates or notices.
Where the contract provides for retention, the employer retains the relevant money. The contract administrator assesses and certifies the amounts and release stages within the appointed role; this does not mean HCS holds the retention money. JCT explains interim valuation and retention.
Practical completion, outstanding work, making good defects and final-account steps follow the particular contract. Agree the required records and responsibilities instead of treating one certificate as evidence of every statutory approval.
Contract planning in Chalk Farm
Documented building context
Camden describes many Harmood Street houses as yellow London stock-brick buildings of 1840–1870, with two storeys and a cottage scale. Its statement records largely hidden butterfly or M-shaped roofs, with shallow slate pitches meeting at a central gutter. The source describes that group’s form; it does not establish how a particular roof has subsequently been altered.
The statement identifies 68–100 Harmood Street as two-window-wide houses in yellow stock brick with flat parapets. It notes round-headed entrance arches and sash-window details towards Powlett Place, alongside some rendered and painted variations. These observations identify a particular terrace, not the present condition or completeness of original features at each address.
At the northern end of Harmood Street’s eastern side, Camden records three-storey houses at 102–108, contrasting with the two-storey buildings farther south. Its description also notes shallow front gardens along the street. The height difference matters when identifying the dwelling and the elevations relevant to a project, particularly where a house has been divided.
Camden describes Powlett Place as a small cul-de-sac with terraces similar to 68–100 Harmood Street, deeper planted front gardens and brick garden walls. It records a small green at the end, modern houses on either side and the railway forming the eastern boundary. That account distinguishes both the street arrangement and later buildings within it.
Chalk Farm tender and contract decisions
A Harmood Street tender should show the butterfly or M-shaped roof arrangement actually found at the property. Identify the central gutter, outlets and proposed access, with temporary weather protection defined for the sequence of work. The street-facing parapet is not enough information to price the covering behind it. Establish the condition and relevant construction through the agreed survey before selecting the repair detail.
For the different Harmood Street house groups, distinguish a modest two-storey cottage from higher accommodation and later alterations. Keep the roof-room, window and wall work in separate priced sections where their interfaces differ. A JCT instruction changing one junction should identify the drawing revision and the evidence used to assess its value; it should not become a general authorisation for unrelated upper-floor work.
At Powlett Place, locate the actual route for rear access and deliveries instead of assuming a through passage. Obtain the client's access arrangements and programme protection around occupied entrances. At completion, record the inspected roof sections, drainage connections and remaining documents by location. Camden's historical account does not verify present access rights, current condition or satisfactory performance of concealed work.
Appointment
HCS cannot act as independent contract administrator where HCS is the contractor.
Local Sources Checked
- Camden: Harmood Street Conservation Area Statement, adopted September 2005 — Harmood Street and Powlett Place; printed pages 5–6 (PDF pages 9, 11)
Who is responsible for the appointment?
Savas Bulduk BSc (Hons) MRICS, Director & Chartered Building Surveyor. Read the professional profile and check the firm’s RICS regulation. The written proposal confirms the person responsible for your instruction and the agreed scope.
Fees and information for a proposal
Contract administration is quoted to the project; the fee reflects the contract, the value and the level of involvement required. The number of visits, valuation stages, programme and completion work affect the proposal. See the fee factors.
Send the project address, proposed works, current stage, estimated construction value and any existing or proposed contract. Include the intended programme and available drawings or specification. If the contract form is undecided, say so; value alone does not determine the appropriate form.
Chalk Farm contract administration questions
What roof information should accompany a Harmood Street tender?
Show the actual butterfly or M-shaped arrangement, central gutter and outlets. Define access and temporary weather protection; the street parapet alone cannot identify the covering to be repaired.
Can Powlett Place deliveries assume a through passage?
Establish the actual rear route and the client’s access arrangements first. Include occupied-entrance protection in the programme and identify the roof and drainage components in the completion record.
Discuss your building contract in Chalk Farm