Building surveys in Ealing: choose the right report

Choosing a service in Ealing usually comes down to the type of building: a Victorian house with a half basement, a flat in a converted villa or a flat in a block. Buyers of older, altered or complex homes should start with the Level 3 guide for Ealing. Savas Bulduk MRICS does every Level 3 inspection himself; his report arrives within about 5 working days of the inspection, and the call that goes through it is included in the fee.

Get a quote for the Level 3 survey on the home you are weighing up, or write to us with the address and the decision you face and we will name the service that fits.

What each survey is for

A detailed assessment before purchase

The Level 3 route suits a property with layers of history, such as a villa split into flats, a house with a dormer and a rear extension, or one with a cellar and lightwell. RICS points to large, older, run-down, unusual or altered buildings, and homes where major works are planned, for this level.

A conventional home in reasonable condition

A Level 2 Home Survey is the lighter choice for a house or flat in reasonable order that has had little done to it. RICS says this level is most suitable for a conventional property in reasonable condition, simple in form and layout, and cites one without multiple alterations or extensions. Check your building against that description before you decide.

An existing defect or a commercial instruction

A home you already own that keeps leaking, cracking or showing damp is a job for building pathology; say where, since when and what you have tried. For a shop, an office or a lease choose technical due diligence, and see the building surveying guide for further options.

Agreeing the scope

Before work starts, the appointment states what will be inspected and how the report will be written. A survey assesses condition; it is no valuation, it cannot vouch for concealed work, it does not design repairs and it settles no legal rights. Opening up, specialist tests and design or legal advice are separate arrangements, and areas that could not be reached are listed in the report.

Local questions that help choose the service

Which conservation area is the address in?

The council's conservation page says the borough has 30 conservation areas, a rich assortment of nineteenth and early twentieth century residential development among much else. Its Article 4 page warns that affected development varies from area to area, and names Bedford Park, Brentham Garden Estate, Hanger Hill Garden Estate and Ealing Town Centre - The Grove, among others, so check the entry for the address.

What are the walls and roof made of?

The Ealing Green appraisal lists stock and red brick laid in Flemish bond, stone dressings, stucco trimming and white painted timber sash windows as prevalent, with low-pitch or hipped roofs covered with slates or flat tiles. It adds that few properties still have their original roofing materials. Ask which slopes have been re-covered, and when.

Is the land flat, and does that matter?

The same appraisal says much of the land in the parish is flat, rising gently from the Thames to reach 30m near Uxbridge Road where the town centre sits, with a ridge of higher ground at Castlebar Hill. Level ground in Ealing does not remove the need to look at rainwater disposal, hardstanding and drains; a Level 3 survey does, and a leak you already know about belongs with pathology.

Will you extend, convert or dig down after buying?

SPD 4, written under the 2004 Plan for the Environment, says dormer windows are rarely acceptable on front roof slopes, that rear dormers are generally more acceptable than side dormers, and that mansard roof extensions which change the slope of the roof will not usually be acceptable. It also says that in conservation areas both floors of a side extension must be set back from the front wall of the main house, and that extensions wrapping around the side and rear will usually be refused. Tell us about such plans when you ask for a quotation: the survey records condition and does not design or approve the work.

See the work and the reporting format

We have not published a case study from Ealing. A comparable one is our Level 2 survey of a ground-floor garden flat in a period residential development in West Hampstead NW6. The purchaser wanted a condition assessment covering structure, finishes, services and shared maintenance responsibilities.

The property was generally sound, with local moisture concerns around a reception-room chimney breast and partition. Salt contamination, a blocked flue, restricted underfloor ventilation and high external paving were among the factors considered, and historic ceiling marks had to be checked against the record of leaks from the flat above. The report recommended targeted investigation rather than a single explanation for every damp mark.

A redacted Level 3 report on a West Kensington period flat shows how findings, priorities and recommendations are set out. It belongs to that flat and not to a home in Ealing.

Surveyor, fee and appointment

Savas Bulduk BSc (Hons) MRICS, the Director and Chartered Building Surveyor behind each Level 3 survey, has a profile, and the firm's RICS regulation is documented too; read both before you instruct.

Expect a Level 3 fee within £950–£2,000 plus VAT, set by the building. Run the numbers through the Ealing calculator, then request a fixed quotation via the Level 3 page. We scope other services after hearing your question, so no other fee is shown.

A quotation request works best with the listing, a floor plan, the age of the house, any dormer, extension or cellar, and your exchange date. Roofs and high-level areas are inspected by drone where conditions and flying rules allow, and rough repair-cost estimates are available on request with a Level 3 report. Other local services are listed in the area guide.

Questions about choosing a building survey in Ealing

Does a half basement make Level 3 necessary?

Not automatically. It adds an area to inspect and raises questions about damp and drainage, so it tips many buyers towards Level 3. A basement in good order in an otherwise conventional house might still suit Level 2; send the details and we will advise.

Can I rely on my lender's valuation?

RICS explains that a mortgage valuation is for the lender, is a limited check and lacks a survey's detail, so a defect that would be costly to repair may not show up in it. For a view of defects and repairs, commission a survey.

Do planning papers or a completion certificate mean Level 2 will do?

Papers prove that a piece of work was approved or finished, not what the rest of the building is like. A house altered in several phases may still need Level 3 whatever certificates exist, so send them with the property details.

I live in a converted flat and a ceiling keeps staining: which service?

Ask building pathology rather than commissioning a purchase survey. Tell us which rooms are affected, whether staining follows rain, who owns the roof and what has already been repaired, so the cause can be investigated.

What happens after the Level 3 report arrives?

Once you have read the report, you speak to Savas on the call included in the fee. He separates urgent repairs from those that can be planned, points out where a specialist is advised, and helps you decide what to take up with the seller.

Last updated: .