Party Wall Surveyor in East Molesey: Agreements, Notices and Awards

A Bridge Road shop conversion, a Kent Town villa and the neighbour's rear wall each need different drawings for Party Wall notices in East Molesey.

Party Wall Notices from £195 plus VAT per notice · Schedules of Condition & Party Wall Awards

Party Wall Act 1996RICS Regulated

Where a shop projects beyond its original house

Elmbridge records modest two-storey terrace cottages alongside larger two- and three-storey late-Georgian, Victorian and Edwardian houses in the residential part of Bridge Road. That range is more useful than assigning one period-house type to the whole road. It does not establish which parts of an individual house are original.

The Bridge Road appraisal, also endorsed in 2006, says shops there are conversions or extensions of earlier domestic buildings, and the companion guide notes three storey flats of the 1930s, inter-war and post-war periods along that road. For a flat above a shop or in a 1930s block, obtain the lease plan and ask who maintains the roof and outside walls.

Start the drawing at the old front wall, even if it now stands inside the shop. If a beam is to span two earlier premises, trace its bearing on each side and mark the home above it. Specified cuts into a party structure can engage section 2 of the Party Wall etc. Act 1996 and require a party structure notice under section 3. A job described simply as fitting out one unit can still involve masonry supporting another.

For accommodation over a shop, provide the entrance route, current plan and any conversion drawings. Ask about changes to commercial units below, rear projections and access to shared roof areas. Identify whether the dwelling extends behind the visible frontage or across an earlier building division. A character guide cannot establish legal responsibility for a shop roof or permission for a later conversion.

Give the surveyor the section through the existing support and the proposed beam, with enough of the flat shown to identify the corresponding room. Identify the entrance to the commercial unit separately from the stair to the flat. A retailer who can arrange an early visit to the stockroom might have no access to the upstairs landing.

The flank nearest the proposed excavation

The guide describes Kent Town as large detached villas in classical and Gothic Revival styles in generous plots, built with London stock bricks, stucco, decorative plaster and natural slate roofs, grading from the largest houses in the north to more modest two storey cottages in the south. Elmbridge's appraisal for the East Molesey (Kent Town) Conservation Area, endorsed in 2011, says roofs on the older houses of Wolsey, Palace and Church Roads are almost consistently natural Welsh slate, and that brick on Palace and Wolsey Roads is almost always accompanied by stucco, plaster or stone dressings.

Ask for alteration records affecting the flank wall and any changes to window openings. Explain which external areas can be entered from the plot and where another owner’s land restricts views. If the corner has a different roof shape from adjoining houses, identify available loft access and records for that arrangement. The inspection should assess the actual building rather than assume a standard end-of-terrace detail from the neighbouring row or an old street plan.

For a side extension to a villa, mark the neighbour's closest structure on a measured site plan. That could be a rear wing rather than the original flank. A section through the new trench should locate the deepest excavation, the separation and the relevant neighbouring foundation. Section 6 depends on the statutory distance and depth tests. An architect's drawing shaded up to the garden boundary supplies only part of that information.

Building a wall at the line of junction brings a different question under section 1. Record whether the proposal places masonry wholly on the building owner's land up to the line or straddles it. If a design moves the wall between issues, identify who received which issue and have the surveyor review the change before setting out.

Recording the upstairs room before structural work

Provide the current floor plan and any drawings for changes to the stairs, rear rooms or roof. A small frontage may conceal substantial later accommodation, while a large building may contain several separate units. Ask for the available alteration history and explain access to the back.

For a condition schedule, label the corner of the room in relation to the shop rather than relying on “left wall”. Include a view of the complete wall, a close view where a plaster repair is already visible and a note of the finish that obscures the beam position. Do the same at the accessible stair landing on the route of the work. The reader should be able to find the surface again without relying on the person who first took the photographs.

Elmbridge's appraisals help identify the history of a particular frontage. Keep any planning permission or listed building consent with its approved drawings, then label building control and lease permissions separately. An award between owners cannot authorise an alteration that still requires one of these consents. Ask the designer to alert the surveyor if a council or landlord condition changes the method of supporting the upper floor.

When an adjoining owner occupies the flat

If you receive papers describing only a shop on Bridge Road, send the surveyor the notice, your flat number and a plan showing how far the dwelling extends over the premises. Our guidance for adjoining owners explains response options. State separately whether access is available to the room above the proposed work and whether another person must arrange entry to communal parts.

East Molesey party wall questions

Can a photograph of stucco establish the wall construction for a new beam?

A photograph can locate the proposed bearing and record the finish. The structural designer needs evidence for the underlying wall and its support. Include records of previous alterations and identify any opening-up still required.

How should a proposal near the junction of two streets be labelled?

Give the postal address, mark both street elevations and show the adjoining building in plan. A shop entrance on one street may serve premises extending behind a home entered from the other.

Which version belongs with the notice if two shop layouts are circulating?

Identify the dated construction proposal being assessed, including its support details. Retain the other version as superseded and tell the surveyor about any later change to the position or depth of work.

Get in Touch

Need party wall matters in East Molesey? Call 020 7101 4590.

Request a Consultation

East Molesey Party Wall Notice & Award Enquiry (Notices from £195 plus VAT per notice)

We use these details to respond to your enquiry. Read our Privacy Policy.