Your contract administration appointment
Discuss the building works in East Molesey with HCS. The written appointment defines the contract role, deliverables, authority, fee and any separately appointed services.
- Confirm the contract documents, responsibilities and communication arrangements.
- Agree site visits and reporting, and assess changes and payment applications under the contract.
- Define completion, defects-period and final-account tasks in the appointment.
For JCT Design and Build, discuss the Employer’s Agent role. For NEC, confirm the roles required by the selected form; an ECC appointment should distinguish Project Manager and Supervisor responsibilities. Read the contract-form guide.
Inspections and communication
Agree the number and timing of visits, progress meetings and reports before instruction. Identify work that needs to be seen before it is covered, the information the contractor must provide, and who will record outstanding decisions. Periodic inspections do not amount to continuous supervision.
Variations, payments and completion
Keep proposed changes, instructions and their cost and programme assessments together. Payment applications are assessed against the executed contract and the evidence available. The appointment identifies who prepares valuations and issues certificates or notices.
Where the contract provides for retention, the employer retains the relevant money. The contract administrator assesses and certifies the amounts and release stages within the appointed role; this does not mean HCS holds the retention money. JCT explains interim valuation and retention.
Practical completion, outstanding work, making good defects and final-account steps follow the particular contract. Agree the required records and responsibilities instead of treating one certificate as evidence of every statutory approval.
Contract planning in East Molesey
Documented building context
Elmbridge records modest two-storey terrace cottages alongside larger two- and three-storey late-Georgian, Victorian and Edwardian houses in the residential part of Bridge Road. That range is more useful than assigning one period-house type to the whole road. It does not establish which parts of an individual house are original.
The 2012 guide identifies Kingfisher Court as a 1930s flatted development on Bridge Road. Its wider account distinguishes such blocks from the older houses and cottages nearby. The recorded date is background information, not a statement that every part of the block remains original or that its common elements are in satisfactory condition.
Elmbridge notes prominent corner plots where the more regular mid-nineteenth-century Kent Town layout meets the older, less regular route of Bridge Road. That is a streetscape distinction, not evidence that a corner house shares the internal arrangement of the terrace beside it. Two visible elevations may still leave other parts concealed.
The guide describes Bridge Road and Creek Road near the village and station as mixed-use frontages with surviving traditional shopfronts and other architectural details. These buildings differ from the residential groups farther along Bridge Road. The historic description cannot establish the present use or arrangement of every upper floor.
East Molesey tender and contract decisions
A Bridge Road tender should identify the particular cottage, larger house or mixed-use frontage involved. Separate its main building from later rear additions and define access to the relevant elevations. The variety recorded by Elmbridge makes an address-specific schedule essential; a neighbouring house's quantities and alteration history cannot be adopted without checking the actual project.
For a Kingfisher Court flat, distinguish the internal work package from the block envelope and obtain the management arrangements for common-part access. For a Kent Town corner property, locate the exposed return and its roof junction separately from the principal frontage. Keep any JCT instruction tied to the affected element, with the designer's detail and supporting measurement.
Where the work sits above a Bridge Road or Creek Road shop, maintain the agreed entrance and service arrangements during construction. State temporary protection and inspection points in the tender. The completion file should identify each tested or inspected component and outstanding obligation, rather than treat a whole frontage as complete because one visible finish has been renewed.
At a Bridge Road corner, identify the return elevation and roof edge included in the access and repair price.
Appointment
HCS cannot act as independent contract administrator where HCS is the contractor.
Local Sources Checked
- Elmbridge: East and West Molesey Companion Guide, April 2012 — MOL02 paragraphs 3.18–3.22 and Kingfisher Court caption; MOL03 paragraphs 3.27–3.29; printed page 9
- Elmbridge: Design and Character SPD, replacement notice — Updates: Design Code replaces the 2012 guidance for applications submitted after 6 January 2025
Who is responsible for the appointment?
Savas Bulduk BSc (Hons) MRICS, Director & Chartered Building Surveyor. Read the professional profile and check the firm’s RICS regulation. The written proposal confirms the person responsible for your instruction and the agreed scope.
Fees and information for a proposal
Contract administration is quoted to the project; the fee reflects the contract, the value and the level of involvement required. The number of visits, valuation stages, programme and completion work affect the proposal. See the fee factors.
Send the project address, proposed works, current stage, estimated construction value and any existing or proposed contract. Include the intended programme and available drawings or specification. If the contract form is undecided, say so; value alone does not determine the appropriate form.
East Molesey contract administration questions
How should a corner-property roof repair be defined?
Identify the return elevation and roof edge separately from the principal Bridge Road frontage. Keep the access allowance, repair quantities and any instruction against those specific positions.
What must a Kingfisher Court flat appointment clarify?
Separate the internal works from the block envelope and establish management arrangements for access to common parts. Completion records should identify the components within the agreed package.