Party Wall Surveyor in Homerton: Agreements, Notices and Awards

For roof works, a new opening or excavation in Homerton, identify the Well Street terrace, converted building or later addition on your drawings.

Party Wall Notices from £195 plus VAT per notice · Schedules of Condition & Party Wall Awards

E9Party Wall Act 1996RICS Regulated

Follow the dividing wall past the shop

Hackney's 2021 appraisal of the Well Street Conservation Area, read here in its consultation copy, covers the historic route of Well Street linking Mare Street to Homerton. It describes development there as predominantly 19th century with some mid to late 20th century infill, and building heights as consistently two to four storeys.

Hackney’s appraisal identifies three-storey terraces at 186–214 and 216–240 Well Street with butterfly roofs. It also records a lower terrace at 195–209 on the other side. The street therefore contains distinct groups rather than a single height or roof arrangement shared by every residential unit.

A builder proposing to raise a party wall for a dormer needs to show where the neighbour's water will go while the roof junction is open. Ask for the level of the valley, the proposed wall height and the intended treatment at each abutment. A party structure notice is served under section 3 for relevant work under section 2 of the Party Wall etc. Act 1996. A plan drawing a line between the houses does not by itself tell either owner what masonry will be cut, raised or rebuilt.

Across a shop frontage, find the staircase serving the homes above and establish where each upper floor ends. The proprietor may be able to admit the inspector to the rear wall while a residential leaseholder controls the roof hatch. List the two access arrangements separately. Ask for drawings of any upper extension that has changed the roof level at this point since the street appraisal was prepared.

A former church or warehouse needs its own section

The appraisal describes 23–43 Kenton Road as a late-nineteenth-century terrace with red-brick banding and stepped cornices. It separately identifies No. 45 as a residential conversion of a former church with a circular window and arched entrance. The two examples require different construction and alteration questions.

The James Taylor Building on Collent Street is another example in Hackney's record. There the enquiry for an alteration may concern a junction between a retained warehouse and newer residential construction.

Request conversion plans, relevant completion documents and information about common access. Identify any connection between the retained facade and newer floors or adjoining blocks that is visible within the agreed inspection. The building’s former use should not be treated as proof of a particular structural system without supporting evidence.

Mark the bearing or cut at the correct level in the converted building, identify the flat above and the rooms immediately beside it, and ask the engineer to show how loads pass through the structure after the work. If the design needs temporary props outside the unit, establish where they would stand and who controls that space. An award that identifies one drawing cannot be assumed to cover a later solution using a different support.

Access to the back of a neighbouring terrace

The appraisal identifies bay-fronted terraces with continuous cornice lines at 36–42 Poole Road and 24–31 Valentine Road, with accommodation of two and three storeys. A continuous detail does not prove a continuous repair history.

For an extension at the garden edge, section 1 may be relevant to a new wall at the line of junction. Section 6 may apply to the excavation. Draw the house and the neighbour's nearest return, then measure the trench in relation to the building as well as the boundary. If the depth of the neighbour's foundation is unknown, identify that uncertainty on the section and ask the engineer what information can establish it. A line on a garden fence is a useful landmark for an inspection but has no bearing level.

Before equipment or boarding arrives, locate the return and the exterior of the adjoining room on a sketch. Record a wide view with a doorway or bay as a reference point before photographing marks on a cornice or to the side of a window. Older paint or a patch in the render can be described without attributing it to an earlier movement. Record any part of a roof visible only from below and any locked room separately when agreeing the schedule of condition.

Keep drawings and council decisions in order

Hackney’s permission for a change to a roof, the building regulations process and any authority needed under a lease are separate from a party wall agreement or award. Retain the issue submitted to the council along with the construction details used for the notice. Where the builder proposes a change on site, tell the surveyor what has changed in the relationship to the adjoining structure. Giving a revised roof layout a new filename is little help if no one can tell which bearing moved.

A Homerton adjoining owner's reply

If the plan received from a neighbour appears to omit your upper floor or a later rear addition, mark it on a copy and keep the notice itself intact. Record how and when you received it. Our guidance for adjoining owners explains response options and appointments. A household with limited hours of access can flag this early so the condition record covers the relevant rooms.

Homerton party wall questions

Will an old drawing of the warehouse show where the proposed beam can sit?

It can identify the original layout. Have the structural designer check the retained wall and any supports introduced during conversion, then locate the proposed bearing on a current section.

Which part of a butterfly roof belongs on a pre-works schedule?

Agree the accessible parts that could be affected, including the internal ceilings and roof junction. Identify the valley and outlet if visible. State where an external inspection was limited by roof height or access.

What should happen if a second opening is added to the job?

Explain its position to the surveyor and supply the revised structural detail. A second opening may affect a different owner, level or part of the wall and can require a fresh look at the notice documents.

Get in Touch

Need party wall matters in Homerton? Call 020 7101 4590.

Request a Consultation

Homerton Party Wall Notice & Award Enquiry (Notices from £195 plus VAT per notice)