Party Wall Surveyor in New Cross: Agreements, Notices and Awards

A later shopfront can project well beyond the original New Cross Road house. Locate the old frontage, adjoining floors and rear additions before serving notice.

Party Wall Notices from £195 plus VAT per notice · Schedules of Condition & Party Wall Awards

SE14Party Wall Act 1996RICS Regulated

Follow the building behind the shop

The Hatcham appraisal records houses at 130–158 New Cross Road built before 1844, with shopfronts added later. It distinguishes two-storey buildings at 136–148, extra storeys at 146 and 148, and three-storey buildings at 132 and 134. That variation matters when identifying a dwelling above the commercial frontage.

Ask for plans showing the upper accommodation, entrance and relationship to the premises below. Where extra floors have been added, obtain any surviving records for the work and distinguish them from later internal alterations. Identify rear extensions serving the shop or flat and explain which spaces are available to inspect. The present shopfront should not be used to infer the original building width or the support arrangement inside.

For a beam proposed above the commercial space, identify which masonry will receive its ends and which floors are supported there. Section 2 of the Party Wall etc. Act 1996 covers specified work to a party structure. The party structure notice is under section 3. If a steel would sit on a new independent frame, ask the designer to show how that frame would actually be supported. New foundations associated with it may pose a separate excavation question even where no bearing is cut into the party wall.

Lewisham dates Minerva Terrace at 120–128 New Cross Road to 1833–1834 and records shopfronts added around 1900. The appraisal describes its symmetrical end pavilions and entrance pillars. The recorded composition helps locate the earlier houses, but does not establish which features or internal divisions survive in a particular unit.

Provide drawings for any joining of premises, changed entrances or conversion of upper rooms. The plan should show the route to the dwelling and any shared stair. Where the rear is enclosed by neighbouring development, identify what external access can actually be arranged. Separate questions about condition from those concerning ownership of a decorative frontage or responsibility for its repair.

When the two sides of the road differ below ground

Lewisham's Hatcham appraisal records basements on one early terrace on Hatcham Park Road and none in the terrace opposite. It also identifies houses on Nettleton Road with basements and examples on Casella Road where bays start at semi-basement level. Draw both sides of the proposed excavation for the house concerned. A neighbour’s apparent floor height can be a useful point to measure, but a floor level is not a foundation level.

For section 6, show the horizontal distance from the excavation to the closest adjoining building or structure and the relative depths. Indicate how any neighbouring foundation dimension was obtained. If a drain trench or pad would run deeper than the main excavation, include it. Consider a new wall at the line of junction under section 1, separately identifying its position in relation to the boundary. A rear addition can bring a neighbour’s wall closer to the trench than the original house.

A dated record before opening up

Lewisham describes 207–219 New Cross Road as three-storey stock-brick townhouses with roofs concealed behind a stucco cornice. Its account records arched ground-floor openings and tall sash windows in this early frontage.

Record the surface on the affected side of the opening before finishes are removed. In a residence behind a shop, label an image of a bedroom wall by its position on the plan, including the floor and distance from the front window. A matching photograph taken from that position after the work is easier to interpret than a close-up marked “upstairs flat”. Note which occupier provided access and any areas hidden by shop fittings, lining or storage.

If the neighbouring owner has dated evidence of earlier rebuilding, keep it with the schedule and state whose evidence it is. An old photograph might show the room before a ceiling was suspended or the cornice covered. The pre-works schedule should still describe what could be seen on the day of inspection. When a contractor later uncovers a connection, give the new observation its own date and location.

Notices alongside planning and private permissions

The appraisal identifies Park Lodge at 104–110 New Cross Road with hipped slate roofs and side entrances, recording a stucco shop addition at 104–106.

An approved drawing for a shop addition may explain the history of the frontage without saying how an upper floor is supported. Request the current engineer's plans before giving the contractor a start date for structural work. Have Lewisham's planning decisions and any building control records identified by their dates and scope. Where an owner or leaseholder needs landlord consent, agree what the lease requires. An award under the Act and these public or private permissions address different questions.

Advice for an owner on the adjoining side

Keep the full notice and the date it reached you. If you occupy a flat behind another shop number, mark your entrance and rooms on a copy of the plan so there is no doubt which part of the proposed work concerns you. Our adjoining-owner service explains how to respond and what a surveyor can record before the build. Identify any features at the back that a designer working from the street may have missed.

New Cross party wall questions

Are all the houses behind one continuous cornice the same height inside?

Levels and support arrangements can change along a frontage. Ask for a section at the particular section of wall where work is proposed and show the connecting floor level on both sides.

Is the notice for a new wall enough to deal with the trench?

Examine the excavation separately against section 6. The surveyor needs the neighbouring structure, distances and relevant depths, as well as the intended position of the new wall on the site.

Which material should be sent if the roof access is controlled by a different leaseholder?

Supply the lease or plan that identifies the access and the contact authorised to arrange entry. Record what can be reached for the visit and what remains outside the inspection so the condition schedule makes that distinction clear.

Get in Touch

Need party wall matters in New Cross? Call 020 7101 4590.

Request a Consultation

New Cross Party Wall Notice & Award Enquiry (Notices from £195 plus VAT per notice)

We use these details to respond to your enquiry. Read our Privacy Policy.