Contract Administration in Clerkenwell

From £1,950 plus VAT — fixed-fee or percentage JCT & NEC contract administration

Content updated: 13 November 2026.

Your contract administration appointment

Discuss the building works in Clerkenwell with HCS. The written appointment defines the contract role, deliverables, authority, fee and any separately appointed services.

  • Confirm the contract documents, responsibilities and communication arrangements.
  • Agree site visits and reporting, and assess changes and payment applications under the contract.
  • Define completion, defects-period and final-account tasks in the appointment.

For JCT Design and Build, discuss the Employer’s Agent role. For NEC, confirm the roles required by the selected form; an ECC appointment should distinguish Project Manager and Supervisor responsibilities. Read the contract-form guide.

Discuss your building contract

Inspections and communication

Agree the number and timing of visits, progress meetings and reports before instruction. Identify work that needs to be seen before it is covered, the information the contractor must provide, and who will record outstanding decisions. Periodic inspections do not amount to continuous supervision.

Variations, payments and completion

Keep proposed changes, instructions and their cost and programme assessments together. Payment applications are assessed against the executed contract and the evidence available. The appointment identifies who prepares valuations and issues certificates or notices.

Where the contract provides for retention, the employer retains the relevant money. The contract administrator assesses and certifies the amounts and release stages within the appointed role; this does not mean HCS holds the retention money. JCT explains interim valuation and retention.

Practical completion, outstanding work, making good defects and final-account steps follow the particular contract. Agree the required records and responsibilities instead of treating one certificate as evidence of every statutory approval.

Contract planning in Clerkenwell

Documented building context

Islington’s January 2002 guidelines for Clerkenwell Green, Charterhouse Square and Hat and Feathers describe an area formed by incremental development, with surviving buildings from nine centuries. Paragraph 1.3 links its character to the proximity of manufacturing, workshops, wholesale activity and shops. This is a dated account of the three named conservation settings, rather than a current use survey of every premises.

Existing-building records for the tender

Ask the managing party which building records can be supplied and which external faces are accessible. Any need for a separate specialist assessment should be considered against the actual issue and agreed scope. The area’s long commercial history does not answer a present technical question inside the home.

Clerkenwell tender and contract decisions

A Clerkenwell tender should describe the current premises and intended works rather than assume that the historical workshop setting establishes today's use. Put the entrance, occupied floors, loading arrangements and shared spaces on the issued plan. Identify which retained features the design proposes to repair or adapt. The guidelines' account of incremental development is a reason to investigate the particular building, not to assign one construction type or permission history to every property in the three conservation settings.

Where a former workshop has become residential accommodation, distinguish the conversion's partitions and services from the earlier shell. Specify investigations at openings or floor connections that the alteration relies upon, with the responsible designer and decision point identified. Tenderers should price the same limits of opening-up, temporary protection and making good. If the findings change the proposed work, retain them with the revised detail and JCT instruction. A historical industrial description cannot settle the value or responsibility for an unforeseen condition.

For work beside an operating business or another dwelling, record the agreed occupation and access arrangements. Separate the building contract from any consent, licence or private right that needs its own adviser. Programme inspections around the actual interfaces that will be concealed. At completion, assemble drawings, tests and outstanding items by floor and work package, identifying what the contractor was instructed to deliver. The record should not imply that excluded premises, inaccessible shared structure or the wider building's entire compliance position has been certified by a local refurbishment appointment.

If retained workshop features influence the proposed layout, schedule them individually and identify the designer’s decision about protection or adaptation. A drawing note should state the particular opening, floor or fitting concerned; a general reference to industrial character is not an instruction to preserve or replace everything.

Appointment

HCS cannot act as independent contract administrator where HCS is the contractor.

Contract scope

Local Sources Checked

Who is responsible for the appointment?

Savas Bulduk BSc (Hons) MRICS, Director & Chartered Building Surveyor. Read the professional profile and check the firm’s RICS regulation. The written proposal confirms the person responsible for your instruction and the agreed scope.

Fees and information for a proposal

Contract administration is quoted to the project; the fee reflects the contract, the value and the level of involvement required. The number of visits, valuation stages, programme and completion work affect the proposal. See the fee factors.

Send the project address, proposed works, current stage, estimated construction value and any existing or proposed contract. Include the intended programme and available drawings or specification. If the contract form is undecided, say so; value alone does not determine the appropriate form.

Clerkenwell contract administration questions

How should alterations to a converted workshop be priced?

Separate later partitions and services from the retained shell. Define investigations at openings and floor connections, with an identified designer and limits for temporary protection and making good.

Does a reference to industrial character define what must be retained?

Schedule the actual opening, floor or fitting and the designer’s proposed treatment. A general character reference does not specify every component or establish the current premises’ use.

Discuss your building contract in Clerkenwell

Tell us the scope and current stage so we can discuss a suitable appointment. Privacy policy.