Your contract administration appointment
Discuss the building works in Cricklewood with HCS. The written appointment defines the contract role, deliverables, authority, fee and any separately appointed services.
- Confirm the contract documents, responsibilities and communication arrangements.
- Agree site visits and reporting, and assess changes and payment applications under the contract.
- Define completion, defects-period and final-account tasks in the appointment.
For JCT Design and Build, discuss the Employer’s Agent role. For NEC, confirm the roles required by the selected form; an ECC appointment should distinguish Project Manager and Supervisor responsibilities. Read the contract-form guide.
Inspections and communication
Agree the number and timing of visits, progress meetings and reports before instruction. Identify work that needs to be seen before it is covered, the information the contractor must provide, and who will record outstanding decisions. Periodic inspections do not amount to continuous supervision.
Variations, payments and completion
Keep proposed changes, instructions and their cost and programme assessments together. Payment applications are assessed against the executed contract and the evidence available. The appointment identifies who prepares valuations and issues certificates or notices.
Where the contract provides for retention, the employer retains the relevant money. The contract administrator assesses and certifies the amounts and release stages within the appointed role; this does not mean HCS holds the retention money. JCT explains interim valuation and retention.
Practical completion, outstanding work, making good defects and final-account steps follow the particular contract. Agree the required records and responsibilities instead of treating one certificate as evidence of every statutory approval.
Administering the Cricklewood building contract
A Cricklewood brief should establish the correct borough and distinguish the Broadway frontage from the Railway Terraces behind it. Use the relevant address, ownership and fabric evidence to define the repair. Contract administration then follows the agreed package and its documented access, design and completion decisions.
HCS cannot act as independent contract administrator where HCS is the contractor. Confirm the appointment and executed form; NEC roles differ.
Delivering building contracts in Cricklewood
Select the right borough record before instructing the work
The Greater London Authority describes Cricklewood as a centre at the intersection of Barnet, Brent and Camden. Identify which authority covers the instructed property and any separate temporary occupation, particularly where the proposed operation reaches beyond the site boundary. A neighbouring building’s permission is not evidence for this address. Assemble the current project drawings and decisions under a clear document register, allocating any missing advice to the appropriate member of the team. When the client changes the proposed work, check which documents need reconsideration. The contract administrator should receive the resulting decision and its effect on the package, so that an instruction is tied to the actual building and authorised proposal.
Distinguish the Broadway houses from the smaller rear terraces
Barnet’s Railway Terraces appraisal contrasts the larger, more detailed houses of Gratton Terrace with the smaller dwellings behind. A repair specification should therefore identify the actual elevation, joinery profile and roof detail rather than pricing a single generic railway cottage. Survey surviving features and determine the treatment of defective material before agreeing replacement quantities. Where opening up is necessary, define the information sought and how the competent designer’s response will be recorded. Include sample and protection requirements with the work item. At valuation, distinguish the instructed treatment and measured extent from a separate improvement requested by the client, keeping photographs and decisions associated with their particular location.
Work out the handling route through the service-road layout
The appraisal records small back yards and narrow service roads behind the Railway Terraces. It also explains that later infill changed some earlier connections through Gratton Terrace. For a roof or rear-wall package, inspect the route that exists now and confirm its permitted use before selecting lifting equipment or delivery sizes. Identify gates, turns, occupation and the space needed to handle material at the destination. Ask the contractor to state the assumptions supporting the tender method. If a route is unavailable, obtain the specific alternative and its implications for the work sequence. Retain the evidence when assessing any contract change; a historic access arrangement cannot establish a present right to pass.
Identify garden plots separately from the construction footprint
Barnet describes an open green strip between Midland and Johnston Terraces and garden plots between Needham and Campion Terraces. Their role in the setting does not make them available to an adjoining contractor. Mark the relevant ownership limits and any agreed access on the project plan, then specify protection for surfaces, planting and boundaries that the work may affect. Establish the reinstatement standard before temporary occupation begins, supported by dated condition photographs. If an alternative scaffold arrangement requires more space, obtain the necessary agreement and assess the changed method first. At close-out, check those temporary-work obligations separately from completion of the permanent repair so that neither element is overlooked.
JCT tender preparation: Cricklewood
The Railway Terraces evidence is a prompt to verify the actual vehicle and pedestrian approach for a Cricklewood tender. Identify whether the project uses the southern Gratton Terrace access described in the appraisal or a different authorised route. State the proposed JCT form and allocate design responsibilities before prices are invited. Ask bidders to explain handling, storage and protection assumptions for the instructed cottage, house or flat. Compare those preliminaries with the actual work quantities and resolve any qualification that treats the approach as unrestricted. Retain the agreed method and scope clarification with the contract documents, without representing the historic access description as a current permission.
Barnet’s Railway Terraces appraisal places the conservation area between Cricklewood Broadway and the railway and describes Gratton Terrace, Burlington Parade and the cottages behind them. It records that vehicle access to the cottages is from the southern end of Gratton Terrace and distinguishes residential houses and flats within the area.
This provides local context for an inspection plan. It does not demonstrate the present condition of a cottage, the right to use a particular access route or the quality of later work. A street description cannot establish how a particular home has been altered.
For a roof alteration, ask whether the available documents concern the whole covering, only a new dormer or an internal conversion. For changed ground-floor accommodation, distinguish the external wall arrangement from the interior finishes. Match technical recommendations to the component actually observed.
The appraisal explains why the Railway Terraces have a particular townscape character. Avoid treating conservation context as a reason to skip an ordinary condition question or, conversely, as proof that repairs will be unusually extensive.
When comparing findings, distinguish a fabric repair from a request for better records or further access. If work could affect a protected feature, ask the appropriate adviser about the current consent position before instructing it.
Local Sources Checked
Check current requirements for the particular property and proposed work.
Who is responsible for the appointment?
Savas Bulduk BSc (Hons) MRICS, Director & Chartered Building Surveyor. Read the professional profile and check the firm’s RICS regulation. The written proposal confirms the person responsible for your instruction and the agreed scope.
Fees and information for a proposal
Contract administration is quoted to the project; the fee reflects the contract, the value and the level of involvement required. The number of visits, valuation stages, programme and completion work affect the proposal. See the fee factors.
Send the project address, proposed works, current stage, estimated construction value and any existing or proposed contract. Include the intended programme and available drawings or specification. If the contract form is undecided, say so; value alone does not determine the appropriate form.
Cricklewood contract administration questions
Which councils meet in Cricklewood?
Barnet, Brent and Camden; confirm the authority for the individual address.
Are the larger Gratton Terrace houses identical to the rear terraces?
The appraisal distinguishes their size and detailing; specify the actual fabric.
Can a historic gap through a terrace be assumed usable?
Verify the present layout, ownership and access agreement.
Should reinstatement of a garden access route be checked at close-out?
Yes, against the agreed method, condition record and contractual obligations.
Discuss your building contract in Cricklewood
Accountability
Provider
Hampstead Chartered Surveyors & Building Consultancy — RICS Regulated Firm No. 923064