Contract Administration in Bickley

From £1,500 plus VAT — fixed-fee or percentage JCT & NEC contract administration

Content updated: October 2026.

Contract planning in Bickley

Documented building context

Bromley’s Urban Design Guide, adopted in July 2023, describes large dwellings on spacious plots in the Bickley conservation setting, with Arts and Crafts examples and a separate area of spacious inter-war housing. It also notes larger gardens and well-spaced properties. These observations distinguish building and plot contexts; they do not assign one construction method or designation to every Bickley house.

Existing-building records for the tender

Ask which roof slope, outlet or support a restoration account describes. Keep finish treatment separate from drawings for changed openings and room connections. If a void or side elevation cannot be reached, list that limit rather than treating the house’s overall style as evidence for unseen parts.

For an inter-war Bickley house, put the original walls, later kitchen wing and enlarged openings on the current plan. Request drawings naming the support and connection introduced by each project. Date changes to roof rooms separately from decoration and fittings.

Bickley tender and contract decisions

The spacious plots described in Bromley's Bickley account still require a defined site plan for the building contract. Mark the house, each wing, any detached structure and the routes proposed for deliveries or storage. Identify occupied areas and features to protect. Tenderers should see the same boundaries and access assumptions before offering their price and programme. A large garden is not evidence that vehicles can enter, that storage is authorised or that every outbuilding belongs in the instructed scope.

For an Arts and Crafts house or an inter-war building, build the specification around the actual material and alteration record. Separate the main roof from later covering over an enlarged kitchen or connecting wing. State the opening-up needed to resolve an uncertain junction and the designer responsible for the repair decision. The contractor's price should show which investigation, temporary protection and making good are included. If the exposed condition requires a revised design, link the resulting JCT instruction to the relevant drawing and retained evidence; the period description alone cannot establish responsibility for the change.

What should the Bickley tender and completion file make clear?

A detached garage or garden room needs an explicit scope decision. Identify whether its work is included, excluded or separately instructed, and show any service connection that crosses the boundary between packages. Plan inspections around the points that will become concealed and identify documents required at handover. Keep progress assessments and outstanding items tied to each named structure, avoiding a single percentage for an undefined group of buildings. The completed record should explain what the contractor was required to deliver and what remains for another adviser or appointment.

Appointment

HCS cannot act as independent contract administrator where HCS is the contractor.

Contract scope

Local Sources Checked

Accountability

Provider

Hampstead Chartered Surveyors & Building Consultancy — RICS Regulated Firm No. 923064

Professional profiles · RICS regulation

Discuss the Bickley project