Your contract administration appointment
Discuss the building works in Chislehurst with HCS. The written appointment defines the contract role, deliverables, authority, fee and any separately appointed services.
- Confirm the contract documents, responsibilities and communication arrangements.
- Agree site visits and reporting, and assess changes and payment applications under the contract.
- Define completion, defects-period and final-account tasks in the appointment.
For JCT Design and Build, discuss the Employer’s Agent role. For NEC, confirm the roles required by the selected form; an ECC appointment should distinguish Project Manager and Supervisor responsibilities. Read the contract-form guide.
Inspections and communication
Agree the number and timing of visits, progress meetings and reports before instruction. Identify work that needs to be seen before it is covered, the information the contractor must provide, and who will record outstanding decisions. Periodic inspections do not amount to continuous supervision.
Variations, payments and completion
Keep proposed changes, instructions and their cost and programme assessments together. Payment applications are assessed against the executed contract and the evidence available. The appointment identifies who prepares valuations and issues certificates or notices.
Where the contract provides for retention, the employer retains the relevant money. The contract administrator assesses and certifies the amounts and release stages within the appointed role; this does not mean HCS holds the retention money. JCT explains interim valuation and retention.
Practical completion, outstanding work, making good defects and final-account steps follow the particular contract. Agree the required records and responsibilities instead of treating one certificate as evidence of every statutory approval.
Contract planning in Chislehurst
Documented building context
Bromley’s Urban Design Guide describes Chislehurst’s housing as predominantly detached or semi-detached. Its Chislehurst passage distinguishes residential development in the western part of the conservation area from agricultural and rural land to the east, with commons and other uses between them. It also records successive development phases whose relationship to earlier building varies.
Existing-building records for the tender
If a detached house has grown in several stages, prepare a plan that labels the kitchen addition, side wing and accommodation above a garage separately. Put the project date beside each outline and link it to the available structural drawing or completion record. A single enlarged floor plan can conceal the order in which those parts were joined.
Chislehurst tender and contract decisions
A Chislehurst contract brief should draw the actual house, each extension and any garden accommodation as separate elements. Bromley's description covers differing phases and plot settings; it does not establish a common construction specification. Ask the designer to identify the junctions between old and proposed work and the investigations required before tender. Record retained materials, areas to be protected and the information that remains to be supplied, so competing prices use the same starting assumptions.
For a detached or semi-detached house, define the access and occupation plan at the property itself. A garden-facing extension may require a different sequence from roof or frontage repairs. Show where deliveries, temporary storage and waste removal can occur, with any permissions or private agreements obtained through the appropriate advisers. If access changes after contract execution, document the reason, authorised response and evidence relevant to the selected JCT procedure. Do not treat a spacious or rural-looking setting as evidence of unrestricted access.
A connection to a garden room, garage or other structure needs an explicit decision about scope. Identify the services and weatherproofing interfaces that pass between packages and set inspection stages before they are hidden. At handover, retain the approved details, tests and outstanding items against each named building or extension. The completion and valuation record should follow the employer's executed contract, rather than imply that all structures within a Chislehurst plot have been surveyed or that the local planning description authorises the work.
Where the rear extension connects to garden accommodation, identify whether service runs and external drainage are part of the same contract. The tender should state the limit of each package and the information needed at the connection, so later instructions can distinguish omitted scope from a genuine change.
Appointment
HCS cannot act as independent contract administrator where HCS is the contractor.
Local Sources Checked
- Bromley: Urban Design Guide SPD — PDF pages 23–24 / printed pages 18–19, Chislehurst, paragraphs 3.59–3.62.
Who is responsible for the appointment?
Savas Bulduk BSc (Hons) MRICS, Director & Chartered Building Surveyor. Read the professional profile and check the firm’s RICS regulation. The written proposal confirms the person responsible for your instruction and the agreed scope.
Fees and information for a proposal
Contract administration is quoted to the project; the fee reflects the contract, the value and the level of involvement required. The number of visits, valuation stages, programme and completion work affect the proposal. See the fee factors.
Send the project address, proposed works, current stage, estimated construction value and any existing or proposed contract. Include the intended programme and available drawings or specification. If the contract form is undecided, say so; value alone does not determine the appropriate form.
Chislehurst contract administration questions
What should the scope say where an extension connects to garden accommodation?
Identify the buildings and the boundary between their work packages. Allocate service runs, drainage and weatherproofing connections expressly so subsequent instructions can distinguish omitted scope from a changed requirement.
Does a spacious setting establish the contractor’s delivery access?
No. Show deliveries, storage and waste removal on the actual site plan. Obtain the relevant permissions or agreements and price the occupied-house sequence against those confirmed arrangements.
Discuss your building contract in Chislehurst