Your contract administration appointment
Discuss the building works in Bush Hill Park with HCS. The written appointment defines the contract role, deliverables, authority, fee and any separately appointed services.
- Confirm the contract documents, responsibilities and communication arrangements.
- Agree site visits and reporting, and assess changes and payment applications under the contract.
- Define completion, defects-period and final-account tasks in the appointment.
For JCT Design and Build, discuss the Employer’s Agent role. For NEC, confirm the roles required by the selected form; an ECC appointment should distinguish Project Manager and Supervisor responsibilities. Read the contract-form guide.
Inspections and communication
Agree the number and timing of visits, progress meetings and reports before instruction. Identify work that needs to be seen before it is covered, the information the contractor must provide, and who will record outstanding decisions. Periodic inspections do not amount to continuous supervision.
Variations, payments and completion
Keep proposed changes, instructions and their cost and programme assessments together. Payment applications are assessed against the executed contract and the evidence available. The appointment identifies who prepares valuations and issues certificates or notices.
Where the contract provides for retention, the employer retains the relevant money. The contract administrator assesses and certifies the amounts and release stages within the appointed role; this does not mean HCS holds the retention money. JCT explains interim valuation and retention.
Practical completion, outstanding work, making good defects and final-account steps follow the particular contract. Agree the required records and responsibilities instead of treating one certificate as evidence of every statutory approval.
Contract planning in Bush Hill Park
Documented building context
Enfield identifies 14–32 Queen Anne’s Place as a closely set group of detached houses with twin gables and detailed timber porches. The appraisal describes them as part of the earlier development phase. That named group has a different plot relationship from the more spacious houses elsewhere in the study area.
The appraisal records vacant plots filled between 1914 and 1960 with semi-detached houses and bungalows, illustrating the phase with 1930s semis on Dryden Road. It notes prominent tiled roofs and simpler detailing. These later houses should be distinguished from the earlier villas around them.
Enfield’s account describes varied late-Victorian, Edwardian and interwar groups in the core area, with detailed porches, stair windows and roof features, and separately discusses later blocks of flats. The shared street setting does not make a flat in a later block equivalent to a converted room in an older villa.
The appraisal describes Private Road as gated, gently curving and generally lined with smaller houses or bungalows set back in larger gardens, with some flats and townhouses. It treats this as a distinct character area. That layout description does not establish access rights, maintenance obligations or current permission for an extension.
Bush Hill Park tender and contract decisions
For the closely spaced Queen Anne's Place houses, locate the twin gables and timber porch within the repair schedule. Give each detail its own condition record, proposed treatment and access assumption. A price for general external decoration should not silently include structural work to a porch or replacement of a gable covering. Ask the designer to resolve those distinctions before tender where the available evidence permits.
A Dryden Road infill building or later flat development needs a separate specification based on its current construction. Identify the common envelope and the part controlled by the employer, then obtain the relevant management and access arrangements. Keep the tender drawing reference with any JCT instruction that changes a roof edge, wall finish or service route, allowing the valuation to follow the authorised work rather than an assumed local house type.
For a gated Private Road plot, establish the actual delivery and working arrangements before accepting a programme. Record protection of retained boundaries and occupation of the house. At completion, reconcile the inspected gable, porch, flat envelope or external package with the issued scope and list remaining documents against those components. The appraisal's development phases do not establish current permissions or completion of the particular contract.
Appointment
HCS cannot act as independent contract administrator where HCS is the contractor.
Local Sources Checked
- Enfield: Bush Hill Park Conservation Area Character Appraisal, approved February 2015 — Sections 2.5.8–2.5.16 and 2.6.1–2.6.2; printed/PDF pages 18, 20, 22, 25, 30
Who is responsible for the appointment?
Savas Bulduk BSc (Hons) MRICS, Director & Chartered Building Surveyor. Read the professional profile and check the firm’s RICS regulation. The written proposal confirms the person responsible for your instruction and the agreed scope.
Fees and information for a proposal
Contract administration is quoted to the project; the fee reflects the contract, the value and the level of involvement required. The number of visits, valuation stages, programme and completion work affect the proposal. See the fee factors.
Send the project address, proposed works, current stage, estimated construction value and any existing or proposed contract. Include the intended programme and available drawings or specification. If the contract form is undecided, say so; value alone does not determine the appropriate form.
Bush Hill Park contract administration questions
Should timber-porch repairs sit within a general decoration allowance?
Give the Queen Anne’s Place porch its own condition record, detail and access requirements. Distinguish structural repair and covering replacement from decoration before tenderers price the work.
What needs agreeing before work on a gated Private Road plot?
Confirm deliveries, working areas and protection of boundaries while the house remains occupied. Record those arrangements before assessing the programme, rather than assuming unrestricted use of the plot.
Discuss your building contract in Bush Hill Park